Tamandaré-class frigate explained

The Tamandaré class is a series of stealth frigates under construction for the Brazilian Navy since 2022, based on the MEKO family of warships. The project was developed by ThyssenKrupp Marine Systems along with Embraer Defense and Security. As of 2024, four ships have been ordered, with other four planned as a second batch.

Development

Batch 1

The program was created in 2017 with the main purpose of replacing all the current major surface combatants of the frigates in operation since 1975, the boats acquired second-hand from the United Kingdom in the 1990s, and the .[1] Several companies from seventeen countries entered in the competition opened by the MoD, offering different types of projects and offset packages. On 16 May 2017, the list of all participating companies was released.[2]

On 15 October 2018, after more than a year of studies by the Directorate of Program Management of the Navy and the Naval Projects Management Company, the short-list of the finalist projects was released, the selected projects were: ThyssenKrupp Marine Systems and the MEKO A-100, the Sigma-class of Damen Group, Naval Group's Gowind-class and Fincantieri with Brazilian Navy's indigenous project variant.[3]

On 28 March 2019, the winning project was presented, the Águas Azuis consortium led by ThyssenKrupp Marine Systems with a project of the 3,500-ton MEKO A-100-class variant. The contract of 2 billion for the first batch of four units, was signed between the Brazilian government and the winning consortium on 6 March 2020.[4] In January 2021, ThyssenKrupp confirmed the acquisition of the Oceana shipyard in Itajaí, Brazil, becoming the company's first shipyard in Latin America, with the objective of building the new Brazilian frigates, and future sales to other navies in the region.[5]

The construction of the lead ship, Tamandaré, started on 5 September 2022, with the second boat, Jerônimo de Albuquerque, on 1 November 2023. Tamandaré, was launched on 9 August 2024.[6] As of November 2023, each ship of the first batch cost around €518 million, the total program cost was reported €2.75 billion, incremented by R&D costs of €750 million.[7]

Batch 2

On 9 August 2024, the Brazilian Navy announced plans to build a second batch of four more units, confirming the National Maritime Strategy published by the MoD in 2023.[6] [8]

Design

The class was based on the MEKO family of warships, a concept of modern naval shipbuilding based on modularity of armament, electronics and other equipment, aiming at ease of maintenance and cost reduction. Designed as multi-mission vessels, the class is able to fulfill the anti-aircraft warfare role with GWS-35 vertical launching system surface-to-air missiles cells, anti-surface warfare with the Brazilian MANSUP missiles, and anti-submarine warfare. The class was developed with the two island philosophy.[9]

Tamandaré is equipped with the Hensoldt TRS-4D active electronically scanned array radar, able to track 1500 targets at a range of up to 250 km. The combat management system (CMS) and the integrated platform management system (IPMS), designed by Atech, a subsidiary of Embraer, are a version derived from the Atlas ANCS and L3 Mapps, exclusively designed to meet the Brazilian requirements.[10]

The boats are the first globally to be equipped with the Sea Snake, a new close-in weapon system of the German defense company Rheinmetall, armed with the KCE30 30 mm revolver cannon, with ABM (air burst ammunition) capability. The MAGE Defensor suite responsible for the electronic warfare support measures (ESM), electronic countermeasure (ECM) and the electronic signals intelligence (ELINT) systems of the class, was developed by the Brazilian company Omnisys. The class is fitted for, but not equipped with LAM cruise missiles.[11] [12] [13]

Participation of Brazilian companies

Like other major defense programs in the country, the government demanded from the winning consortium the construction of the ships in Brazil, the participation of Brazilian companies in the industrial process and the transfer of related technologies.[1] Embraer, along its subsidiary Atech, are responsible for the integration of systems and sensors of the class. Other companies like Akaer Engenharia are involved in the industrial process, nationalizing components and parts of the structure to reduce costs and foreign dependence.[14] Around 40% of the ship's components are produced in the country.[15]

Ships of the class

The ships are named after key people in the history of the Imperial Brazilian Navy.[16]

NameHull NumberBuilderLaid DownLaunchedCommissionedStatus
Batch 1
F200ThyssenKrupp Marine Systems24 March 2023[17] 9 August 2024[18] [19] Fitting out
F2016 June 2024[20] Under construction; first steel cut 1 November 2023[21]
F202Under construction; first steel cut 13 November 2024[22]
F203Ordered
Batch 2
TBDF204ThyssenKrupp Marine SystemsPlanned
TBDF205Planned
TBDF206Planned
TBDF207Planned

See also

Notes and References

  1. News: Programa Fragatas Classe Tamandaré. Marinha do Brasil. pt. 17 October 2024.
  2. News: Classe Tamandaré - Marinha do Brasil encerra a primeira etapa do projeto de obtenção. 16 May 2017. Defesa Net. pt.
  3. News: Marinha do Brasil divulga short-list do Projeto classe Tamandaré. 15 October 2018. Poder Naval. pt.
  4. News: Marinha compra quatro fragatas por R$ 9,1 bilhões. 4 March 2020. UOL. pt.
  5. News: Estaleiro responsável por construir as fragatas Classe Tamandaré agora é thyssenkrupp Estaleiro Brasil Sul. 12 January 2021. Defesa Aérea & Naval. pt.
  6. Web site: La Armada de Brasil presenta la primera Fragata Tamarandé. live . https://web.archive.org/web/20240812120953/https://www.pucara.org/post/la-armada-de-brasil-presenta-la-primera-fragata-tamarand%C3%A9. 9 August 2024 . 12 August 2024. es. Pucará Defensa.
  7. News: Classe Tamandaré: contrato foi reajustado para mais de 11 bilhões de reais no ano passado. 10 November 2023. Poder Naval. pt.
  8. Web site: Brazil's National Maritime Strategy. live . https://web.archive.org/web/20240610080500/https://www.naval.com.br/blog/wp-content/uploads/2024/05/ema-310-edm-1ed.pdf . 10 June 2024. pt. Poder Naval.
  9. Web site: Competitividade é palavra-chave para fornecedores do projeto das fragatas . 23 September 2020 . FIESC. pt.
  10. Web site: TRS-4D Rotator Multi-function surveillance and target acquisition radar. Hensoldt. 27 July 2024.
  11. Web site: El legado de la Clase Niterói: Brasil está a un paso de la botadura de la primera fragata clase Tamandaré . 19 July 2024 . Infodefensa. es.
  12. Web site: Sea Snake 30 brochure. live . https://web.archive.org/web/20240525120929/https://www.rheinmetall.com/Rheinmetall%20Group/Systeme%20und%20Produkte/Systeme%20fuer%20die%20Marine/Waffensysteme%20und%20Munition/RWM_Sea_Snake_30_LREdition2_en.pdf . 25 May 2024. en. Rheinmetall.
  13. Web site: MAGE Defensor brochure. live . https://web.archive.org/web/20240714132226/https://www.omnisys.com.br/material-de-suporte/guerra-eletronica-mage-et_slr-1.pdf . 14 July 2024. pt. Omnisys.
  14. Web site: Akaer entrega as primeiras três escotilhas para a Fragata Tamandaré. Defesa Aérea e Naval. 16 November 2024.
  15. Web site: Comenzó la construcción de la tercera de las nuevas fragatas clase Tamandaré de la Marina de Brasil. Zona Militar. 16 November 2024. es.
  16. News: Segundo o site Alide, navios da classe Tamandaré já têm nome. Poder Naval. pt.
  17. Web site: 24 March 2023 . Press release. live . https://web.archive.org/web/20240703004823/https://d2zo35mdb530wx.cloudfront.net/_binary/UCPthyssenkruppRHQBrazil/54b2a5ad-d4fb-423f-abe0-ae18b8bd4db2/23mar_-_press_release_-_inovacao_na_construcao_naval_militar_no_pais_marca_batimento_de_quilha_da_fragata_tamandare.pdf . 3 July 2024. pt. mar.mil.br.
  18. Web site: 9 August 2024 . Fragata Tamandaré é lançada ao mar em cerimônia com presença de Lula. live . https://web.archive.org/web/20240809201126/https://agenciabrasil.ebc.com.br/politica/noticia/2024-08/fragata-tamandare-e-lancada-ao-mar-em-cerimonia-com-presenca-de-lula . 9 August 2024. pt. Agência Brasil.
  19. Web site: 13 August 2024 . Fragata Tamandaré é transferida para dique flutuante. pt. Defesa Aérea e Naval.
  20. News: Storto . Margarete. 6 June 2024 . Batimento de Quilha do segundo navio marca avanço no Programa Fragatas Classe Tamandaré. live . https://web.archive.org/web/20240607104226/https://www.thyssenkrupp-brazil.com/noticias/press-releases/press-detail/batimento-de-quilha-do-segundo-navio-marca-avanco-no-programa-fragatas-classe-tamandare-259679 . 7 June 2024. pt. thyssenkrupp.
  21. News: Storto . Margarete. Programa Fragatas Classe Tamandaré: primeiro corte de aço marca início da construção da segunda fragata. thyssenkrupp. 1 November 2023. 1 November 2023. pt.
  22. News: Realizado o corte da primeira chapa de aço da Fragata 'Cunha Moreira'. 14 November 2024. Defesa Aérea e Naval. pt.