Tai Wai station explained

Style:MTR
Tai Wai
Native Name:大圍
Native Name Lang:zh-Hant
Symbol Location:hk
Mlanguage:
C:大圍
J:Daai6wai4
Y:Daaih wài
P:Dàwéi
Showflag:y
Address:Tsuen Nam Road, Tai Wai
Borough:Sha Tin District, Hong Kong
Coordinates:22.3731°N 114.1786°W
Line:
    Connections:
    Structure:Elevated
    Platform:4 side platforms
    Tracks:4
    Code:TAW
    Owned:Kowloon-Canton Railway Corporation
    Operator:MTR Corporation
    Map Type:Hong Kong MTR
    Map Alt:Hong Kong MTR system map
    Map State:expanded

    Tai Wai station is an interchange station on the and the of the Mass Transit Railway (MTR) system in Hong Kong. The station is located in Tai Wai, Sha Tin District.

    History

    The first iteration of Tai Wai station along the Kowloon–Canton railway (KCR), which would later be renamed the East Rail line, arose out of a natural disaster, when a temporary station was first constructed at its present-day location in the immediate aftermath of tropical storm Ellen, whose associated torrential rain severely damaged the original masonry arch Bridge No. 11 across Shing Mun River on 25 August 1976.[1] With diesel train services cut between Mong Kok and Sha Tin Stations, it was decided on 28 August 1976 to construct a temporary relief platform at Tai Wai, which was completed in 48 hours and put into operation on 1 September 1976, reconnecting train services to and from Hung Hom Station to the south and supported by connecting shuttle bus services between the temporary station and Sha Tin Station for onward travel to/from Lo Wu.[2] [3] The temporary platform was dismantled following this resumption.

    Meanwhile, Bridge No. 11 was demolished and reconstructed to more modern construction standards, enabling a full resumption of end-to-end train services between Hung Hom and Lo Wu on 10 October 1976.[4]

    Eventually, plans were made to construct a permanent station at Tai Wai to serve its growing new town population. As a short-term move, construction of a temporary wood-supported station next to Tai Wai Industrial Estate began in November 1982 and it was opened on 15 August 1983 as part of the KCR's greater electrification and double-tracking modernisation programme. The temporary station was located on Shing Chuen Road (成全路), north of the current station on the opposite side of the nullah.[5] [6]

    The permanent station was constructed at its present location and opened on 23 April 1986 to replace the temporary station.

    Further construction began in the new millennium to significantly expand Tai Wai station to serve as the western terminus of the Ma On Shan Rail, a new KCR line built to serve eastern Shatin and Ma On Shan New Town. The line opened on 21 December 2004. The expansion provided for cross-platform transfer from the Ma On Shan Line (westbound) to the East Rail (southbound).[7]

    Automatic platform gates were retrofitted on the Ma On Shan line platforms in 2015–2016.

    On 14 February 2020, the was extended west to a new terminus in, as part of the first phase of the Shatin to Central Link project. The Ma On Shan Line was renamed Tuen Ma Line Phase 1 at the time.[8]

    On 27 June 2021, the Shatin to Central Link project was completed with the opening of a new section of rail line through East Kowloon, connecting the Tuen Ma line Phase 1 with the existing West Rail line. The newly unified line was thus renamed to "Tuen Ma line".[9]

    On 26 October 2023, following the opening of a new shopping mall the Wai, exit H was opened, directly connecting platform 3 with the mall.

    Station layout

    All platforms on the station are side platforms. Platforms 1 and 2 serve the and platforms 3 and 4 serve the . Platforms 3 and 4 are positioned slightly higher than Platforms 1 and 2.

    Platforms 2 and 3 serve southbound trains on the East Rail and Tuen Ma lines respectively and are connected by four large walkways. This makes it possible for southbound passengers to walk directly between the two platforms, without the need to use stairs, escalators, or lifts.

    U2
    Upper Concourse
    Exit HThe Wai
    P/U1
    Platforms
    Exits E and GExits, Customer services
    Side platform, doors will open on the left
    Platform 1 towards or
    Platform 2← East Rail line towards
    Side platform, doors will open on the left
    Exit FExits, Customer services, passageways
    Side platform, doors will open on the right
    Platform 3← towards
    Platform 4 Tuen Ma line towards
    Side platform, doors will open on the right
    C
    Concourse (Ground)
    ConcourseExits, transport interchange
    Customer services, toilets
    Shops, vending machines, ATMs

    Entrances/exits

    Notes and References

    1. Web site: Meteorological Results 1976. Part III - Tropical Cyclone Summaries . 1977 . 27. . 28 March 2024 .
    2. Web site: The Kowloon Canton Railway (British Section) Part 5 – The Post War Years (1945 to 1978). The Industrial History of Hong Kong Group . 27 March 2024.
    3. Web site: Bridge Over Troubled Water — The Collapse of Bridge 11 under 1976 Rainstorm . Medium . 5 January 2024 . Area 17 . 27 March 2024.
    4. Web site: Bridge Over Troubled Water — The Collapse of Bridge 11 under 1976 Rainstorm . Medium . 5 January 2024 . Area 17 . 27 March 2024.
    5. Web site: Ho. Chi Ching, Ivan. A study of the planning implications after electrification of KCR (Kowloon-Canton Railway). Centre of Urban Studies and Urban Planning, University of Hong Kong.
    6. Web site: 1983年大圍臨時火車站 (木頭站) . discuss.com.hk . ymckwinner . 27 March 2024.
    7. Web site: Kowloon-Canton Railway Corporation Annual Report 2004. Kowloon-Canton Railway Corporation. 9 June 2021.
    8. News: MTR opens phase one of the Tuen Ma Line . RTHK . 14 February 2020.
    9. News: MTR's Tuen Ma Line to get going on June 27 . RTHK . 28 May 2021.
    10. New Entrance/Exit H at MTR Tai Wai Station Opens Today; Seamless Connection with The Wai and the Adjoining Community|date=26 October 2023|publisher=MTR]|access-date=5 November 2023|archive-url=https://web.archive.org/web/20231104081216/https://www.mtr.com.hk/archive/corporate/en/press_release/PR-23-074-E.pdf|archive-date=4 November 2023|url-status=live}}

      See also

      External links

      .