T series (Toronto subway) explained

T series
Interiorimage:TTC Line 2 T series Train interior 2022.jpg
Interiorcaption:The interior of a T-1 subway car
Service:1995–present
Manufacturer:Bombardier Transportation
Factory:Thunder Bay, Ontario
Replaced:M-1, H-1, H-2
Formation:2 car mated pairs, operated as 2- or 3-pair (4- or 6-car) trains
Fleetnumbers:5000–5371 (re-used from retired TTC vehicles, G-series, M-1, H-1 subway trains)[1]
Operator:Toronto Transit Commission
Depots:Greenwood Subway Yard
Lines: Bloor–Danforth
Yearconstruction:1995–2001
Numberbuilt:372
Numberservice:370
Numberscrapped:2
Carbody:Aluminum
Carlength:23frac=8NaNfrac=8
Width:3.14frac=8NaNfrac=8
Height:3.65frac=8NaNfrac=8
Floorheight:1.11NaN1
Doors:8 sets (4 sets per side) per car
Maxspeed:Train max: 88km/h
Service revenue max: 75km/h
Weight:33095kg (72,962lb)
Capacity:66 seated (per car)
Acceleration:0.85m/s2
Deceleration:1.3m/s2 (service)
1.38m/s2 (emergency)
Traction:GTO-VVVF (Adtranz)
Traction Motors:Adtranz 1507A 104.21NaN1 3-phase AC synchronous motors
Poweroutput:2500.81NaN1
Aux:120/208 V AC battery auxiliary
Collectionmethod:Contact shoe
Brakes:Regenerative and Pneumatic

The T series, also known as the T-1, is the fourth series of rapid transit rolling stock used in the subway system of Toronto, Ontario, Canada. They were ordered by the Toronto Transit Commission (TTC) in 1992 and built in one production set between 1995 and 2001 by Bombardier Transportation in Thunder Bay, Ontario, Canada.

Currently based entirely out of Greenwood Subway Yard, the T-1s are the older of the two currently active series of rolling stock on the heavy-rail lines in the Toronto subway network. Following the introduction of the newer Toronto Rocket train sets, all T-1 trains now operate exclusively in six-car configurations on Line 2 Bloor–Danforth. They previously operated on Line 1 Yonge–University and in a four-car configuration on Line 4 Sheppard until the retirement of the last remaining H-series trains in 2014 and until the implementation of one-person train operation on the latter in 2016.[2]

Design advances

The T-1 cars entered service between 1995 and 2001 and became the mainstay of the TTC subway fleet. By 1999, they had replaced the older M1s, H1s, H2s and prototype H3s, along with some H4s, many of which had been in revenue service since the 1960s.

The T-1s had many of the same technical specifications of the H series, including the same married pair configuration, and incorporated many of the design elements that had been refined throughout the H-series program. Each model in the H-series production run improved on the last, adding features such as a single-handle controller for acceleration and braking, air conditioning, a change from camshaft to chopper control, and regenerative braking. The T-1 built on those advances (such as changing from a rotary-type to a fore–aft, joystick-type controller) while integrating new computer technology (analogous to the New Technology Train of the New York City Subway), creating a more modern train. The T-series cars were the first TTC cars to use AC propulsion, rather than DC propulsion as used in all previous rolling stock, all of which are now retired.

Other improvements included wider entry and exit doorways, flip-up seats for the installation of wheelchair positions (which are now marked in blue velour to signify priority seating areas instead of the red velour used for other seats), and the removal of vertical stanchions along the car's centre line, making them the TTC's first subway cars to be wheelchair-accessible.[3] The interior colour scheme consists of grey floors and walls and dark red doors and panels, unlike the simulated woodgrain panels used on the predecessor H-series cars.

Lines serviced

Future

The T-1s have a life expectancy that allows them to remain in service until at least 2026;[4] however, at the end of 2019, the TTC proposed an overhaul to extend the T-1 fleet's life by 10 years.[5]

The TTC started implementing mid-life upgrades for the fleet including LED-type interior lighting, along with side LED destination signs and external pre-boarding route and destination announcements. As of 2019, the TTC is in the process of installing CCTV cameras on the remaining T-1 subway fleet.

The TTC also considered upgrading the fleet to run on an automatic train control (ATC) system, which it is in the process of installing to replace the current wayside signaling system on Lines 1 and 4 and is expected to install on Line 2 by 2030 in conjunction with the opening of the Scarborough subway extension.[6] However, due to prohibitively expensive costs of such a retrofit, it is unlikely that this will happen in the near future, and the TTC plans to replace all T-1 trains with new ATC-compatible equipment instead.[7]

In October 2022, the TTC had issued a request for proposals for new Line 2 trains similar to the Toronto Rockets, which would have replaced the T-1s.[8] Later in June 2023, due to a lack of funding, the order was cancelled.[9]

External links

Notes and References

  1. Web site: TTC Service Summary. Toronto Transit Commission. September 21, 2015. October 2, 2015. October 2, 2015. https://web.archive.org/web/20151002215918/https://www.ttc.ca/PDF/Transit_Planning/Service_Summary_2015-10-11.pdf. live.
  2. Web site: Procurement Authorization – Procurement Authorization Change Directive to the Toronto Rocket (TR) Supplier for the Design Provisions for Train Door Monitoring (TDM) System . . March 26, 2015 . June 13, 2015 . June 15, 2015 . https://web.archive.org/web/20150615081900/http://www.ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2015/March_26/Reports/Report_5_1_including_presentation.pdf . live .
  3. Web site: Accessible Vehicles . December 13, 2009 . dead . https://web.archive.org/web/20100814193720/http://www3.ttc.ca/TTC_Accessibility/Accessible_Service/Accessible_vehicles.jsp . August 14, 2010.
  4. Web site: Procurement Authorization Amendment To Modify Four Toronto Rocket Train Sets for Service on Line 4 (Purchase Order No. C31PD05761) . June 7, 2016 . August 4, 2016 . https://web.archive.org/web/20160804042206/https://ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2015/June_22/Reports/PAA_to_modify_4_Toronto_Rocket_Train_Sets.pdf . dead .
  5. Web site: TTC 15-Year Capital Investment Plan & 2020 – 2029 Capital Budget & Plan . . December 16, 2019 . August 23, 2020 . https://web.archive.org/web/20200823205720/http://ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2019/December_16/Reports/2_TTC_15_Year_Capital_Investment_Plan_and_2020_2029_Capital_.pdf . August 23, 2020 .
  6. News: More Toronto Rockets for the TTC . Munro . Steve . Steve Munro . May 18, 2010 . https://web.archive.org/web/20150304010817/http://stevemunro.ca/2010/05/18/more-toronto-rockets-for-the-ttc/ . March 4, 2015 . March 3, 2015 . live .
  7. News: TTC Capital Program Review . Munro . Steve . Steve Munro . October 4, 2016 . April 29, 2017 . November 24, 2016 . https://web.archive.org/web/20161124155117/https://stevemunro.ca/2016/10/04/ttc-capital-program-review/ . live .
  8. Web site: Steve . 2022-10-20 . TTC Issues RFP For New Subway Trains . 2023-11-06 . Steve Munro . en.
  9. Web site: Steve . 2023-06-26 . TTC Cancels RFP For New Subway Trains (Updated) . 2023-11-06 . Steve Munro . en.