Surbiton | |
Manager: | South Western Railway |
Fare Zone: | 6 |
Locale: | Surbiton |
Borough: | Royal Borough of Kingston upon Thames |
Years1: | 21 May 1838 |
Events1: | Opened (Kingston) |
Years2: | 1845 |
Events2: | Resited 700m (2,300feet) west |
Symbol: | rail |
Years3: | December 1852 |
Events3: | Renamed (Kingston Junction) |
Years4: | 1 July 1863 |
Events4: | Renamed (Surbiton and Kingston) |
Years5: | 1 October 1867 |
Events5: | Renamed (Surbiton) |
Railcode: | SUR |
Access: | yes |
Dft Category: | B |
Platforms: | 4 |
Tracks: | 5 |
Railexits0405: | 5.845 |
Railexits0506: | 5.773 |
Railexits0607: | 8.987 |
Railexits0708: | 9.661 |
Railexits0809: | 8.385 |
Railexits0910: | 8.033 |
Railexits1011: | 8.340 |
Railexits1112: | 8.620 |
Railexits1213: | 9.031 |
Railexits1314: | 9.207 |
Railexits1415: | 9.604 |
Railexits1516: | 9.443 |
Railexits1617: | 9.377 |
Railint1617: | 0.730 |
Railexits1718: | 9.137 |
Railint1718: | 0.698 |
Railexits1819: | 9.326 |
Railint1819: | 0.703 --> |
Railexits1920: | 8.794 |
Railint1920: | 0.691 |
Railexits2021: | 1.945 |
Railint2021: | 0.125 |
Railexits2122: | 4.988 |
Railint2122: | 0.372 |
Railexits2223: | 6.610 |
Railint2223: | 0.434 |
Railexits2324: | 7.335 |
Railint2324: | 0.537 |
Coordinates: | 51.3926°N -0.3044°W |
Listing Grade: | II |
Listing Detail: | Surbiton Station |
Listing Entry: | 1185071 |
Surbiton railway station is a National Rail station in Surbiton, south-west London, in the Royal Borough of Kingston upon Thames. The station is managed and served by South Western Railway, and is in Travelcard Zone 6. It is 12chain3chain (12.04 miles) from . The front ticket office at Surbiton is open seven days a week.
It has been considered one of the finest modernist stations in Great Britain[1] and is a Grade II listed building.[2]
The London and Southampton Railway intended its line to go via Kingston but Kingston Corporation objected, fearing a harmful impact on their coaching trade, and the railway passed about 1.5miles south of the town with the first Kingston station opening in 1838 on the west side of Ewell Road. In either 1840[3] or in 1845[4] it was resited 0.5miles west to Surbiton, then little more than a farm. The Hampton Court Branch was built in 1849, the New Guildford Line which diverges at the same point opened in 1885.
Successive renamings of the station were Kingston Junction in late 1852, Surbiton and Kingston in 1863 when the present Kingston railway station opened on the branch line, and Surbiton in 1867. The station was completely rebuilt in 1937 by the Southern Railway with two island platforms with Southern Railway designed canopies. The buildings were designed by James Robb Scott in an art deco style.[5] In 1984/85 a large mural titled 'Passengers'[6] was painted in the booking hall by artist Graeme Willson. It has since been removed.
The station had a moderately sized goods yard which was situated on the eastern side of the station platforms. Two additional sidings were located on the western 'up' side of the station and were served by a short loading platform. In addition to local goods facilities, the main yard was also used as the loading point for the short lived Surbiton – Okehampton car carrier service that ran between 1960 and 1964.
The main goods yard finally closed in 1971 with all localised freight operations then being moved to the nearby goods yard at Tolworth on the Chessington branch. The former goods yard site at Surbiton ultimately became the main station car park although some land was also subsequently developed into residential flats. One of the two 'up' sidings remains in place and still sees occasional use with civil engineering stock.
A major incident occurred on 4 July 1971 when a freight train derailed on the points at the London end of platforms 3 & 4. Unaware of the incident, the driver continued through the station with the result that two derailed wagons eventually toppled over south of the platforms and obstructed the down fast through line. At the same time, a down express passed through the station and collided with the derailed wagons at a speed that caused the front of the express to derail and topple over. The leading coach finally came to rest as it struck the road bridge that passes under the line south of the station. There were no fatalities and the cause of the initial derailment was eventually attributed to overloading of some of the ballast wagons in the freight train which resulted in buffer locking when the train initially left Clapham Junction yard that day.[7]
In October 2021, Network Rail commenced work to relieve congestion by adding a new deck and staircase to the footbridge at the London end of Platforms 3 and 4.[8] The work was officially completed on 17 May 2024.[9]
South Western Railway operate all services at Surbiton using Class 450 and 455 EMUs. Until 2022, Class 456 trains were often attached to the latter to form ten carriage trains, but these units were withdrawn on 17 January with the introduction of a new timetable. [10] The station is served by both inner and outer suburban South Western Railway services.
The typical off-peak service in trains per hour is:
The station has four platforms on two islands, all of which can be accessed by 12 carriage trains.[11]
London Buses routes 71, 281, 465, K1, K2, K3 and K4 and non-TFL routes 514 and 515 serve the station.
The station was used for filming of Harry Potter and the Half-Blood Prince in October 2007. Filming began in the early hours to avoid disruption.[12]
Surbiton station also appears in Agatha Christie's Poirot: "The Adventure of the Clapham Cook",[13] a TV adaptation of the short story by Agatha Christie and the first episode of the 1989 ITV series. Having been set in the 1930s[14] Art Deco period and external shots of Hercule Poirot's fictional residence Whitehaven Mansions being filmed at Florin Court,[15] the station assists in maintaining the authenticity of the programme and was built within a year of Florin Court.