Terminal Skypark Komuter station explained

Style:KTM
Terminal Skypark
Type: Commuter rail station
Address:Sultan Abdul Aziz Shah Airport Terminal 3, Subang, Selangor
Country:Malaysia
Line: (KTM Komuter)
Platform:2 side platforms
Tracks:2
Owned:Keretapi Tanah Melayu

Terminal Skypark Komuter station is a newly completed KTM Komuter limited express station located in Subang, Selangor, Malaysia. It was opened on 1 May 2018.

The station serves the Subang Skypark Terminal (Terminal 3) of the Sultan Abdul Aziz Shah Airport, providing the airport with a rail connection to Kuala Lumpur and the rest of Klang Valley.

The station is the terminus of the, which shares tracks with the Port Klang Line between KL Sentral station and Subang Jaya station before branching off towards the airport.[1] [2]

Location

The station is located immediately across the Subang Airport Highway from Subang Skypark. An open-air car park sits directly in front of the station. Passengers going from the airport building to the station were required to cross a pedestrian bridge and walk through a portion of the car park.

Layout

In contrast to most KTM Komuter stations which are on ground level, Terminal Skypark station is elevated; the ticketing counter and control facilities are on ground level but the train platforms are one floor above ground. This, as well as the Sungai Gadut station, are the only 2 elevated stations in the Komuter system.

Toilets and a surau are available on the ground floor.

The station has two side platforms along two railway tracks. Platform 1 is for trains terminating at the station, while Platform 2 is for trains heading towards Subang Jaya and KL Sentral.

Feeder buses

Since 9 June 2022 buses now stop in front of the station entrance.[3] [4]

Route No.OriginDestinationViaConnecting to
772 Terminal Skypark
(Subang Skypark)
Pasar SeniJalan Lapangan Terbang Subang
Ara Damansara
Setia Jaya
Lebuhraya Persekutuan
Asia Jaya
KL Gateway-Universiti
Jalan Pantai Baharu
Abdullah Hukum
Jalan Bangsar
Bank Rakyat-Bangsar
T804
T804 Terminal Skypark
(Subang Skypark)
Kwasa SentralJalan Lapangan Terbang Subang
Jalan Sungai Buloh
772

Gallery

Skypark Terminal linkway

References

3.1343°N 101.5554°W

Notes and References

  1. News: Work on railway line from Subang airport to KL Sentral has begun. Menon. Priya. The Star (Malaysia). 8 August 2014. 30 April 2016.
  2. Web site: Projek Landasan Keretapi dari Subang ke Terminal Skypark Subang. Land Public Transport Commission of Malaysia. ms. Railway Project from Subang to Subang Skypark Terminal.
  3. Web site: Ekstra Penjimatan . www.ktmb.com.my . 25 April 2023 . https://web.archive.org/web/20220609132602/https://www.ktmb.com.my/assets/pdf/2022/skyparklink-new-fare-2022.pdf . June 9, 2022 . ms . 2022 . live.
  4. Web site: 772 . 9 June 2022.