H. C. Stülcken Sohn Explained

H. C. Stülcken Sohn
Fate:Merged
Foundation:1846
Defunct:1966
Location:Hamburg, Germany
Industry:Shipbuilding
Num Employees:~1,600

H. C. Stülcken Sohn (also known as Stülcken-Werft) was a German shipbuilding company located in Hamburg and founded in 1846 by Heinrich Christoph Stülcken.[1] [2] [3]

During World War I the company built one single U-boat for the Kaiserliche Marine, the U-157, which under command of the famous Max Valentiner undertook the longest cruise in the war from November 27, 1917 to April 15, 1918, a total of 139 days. During World War II the company built 24 VIIC U-boats for the Kriegsmarine. The company used slave labour of the Neuengamme concentration camp with its own subcamp.

After the war the company constructed several vessels for the Bundesmarine. In the 1950s the company developed the so-called Stülcken derrick, a lifting device for very heavy cargo.

In 1966 the company was absorbed by Blohm + Voss.

Ships built by H. C. Stülcken Sohn (selection)

Civilian ships

Navy training ship

Naval ships

Frigates

Destroyers

Auxiliary

Submarines (U-boats)

External links

Notes and References

  1. MARCHTALER, H. VON (1940): Hundert Jahre Stülcken-Werft 1840–1940. 261 p., Hamburg (Druck v. Broschek & Co.).
  2. HIEKE, E. (1955): H. C. Stülcken Sohn. Ein deutsches Werftschicksal. Hanseatischer Merkur, Hamburg, Veröffentlichungen der Wirtschaftsgeschichtlichen Forschungsstelle, Bd. 14: 374 p.
  3. ANONYMOUS (1964): H.C. Stülcken, Shipyard and Mechanical Workshop. Hamburg.