Stillwater Triple Hybrid Power Plant Explained

Stillwater Triple Hybrid Power Plant
Country:United States
Location:Nevada
Coordinates:39.544°N -118.561°W

The Stillwater GeoSolar Hybrid Plant is a combined 61 MW solar energy and geothermal power plant in the U.S. state of Nevada. Located NE of Fallon, near Stillwater, the site includes a 26MW solar photovoltaic plant and a 2MW solar thermal plant that were added to a 33MW geothermal plant.

Overview

The project is a solar/geothermal plant and constructed by Enel Green Power. POWER Engineers Inc. provided detailed engineering services for the original binary geothermal plant as well as for the 2 MW Concentrating Solar Power (CSP) system. The total output of 15 GWh/month[1] from the plant was sold to NV Energy.[2] [3] [4] In summer, the PV plant produces more when the thermal plant is less efficient due to dry cooling in high temperatures.[5]

Geothermal plant

The plant entered into operation in 2001,[1] and revitalized in 2009.[6]

Solar photovoltaic plant

Covering, the plant has 89,000 polycrystalline silicon solar panels and has a generation capacity of 26 MW. The photovoltaic generation was designed to make up for the reduction in output from the geothermal plant due to high ambient temperatures during summer midday hours.[5]

Solar thermal plant

An additional 2 MWe (17 MWth) using concentrated solar power (CSP) in parabolic troughs began construction in 2014.[7] In addition to generating electricity, the CSP facility is expected to extend the life of the geothermal reservoir used for the geothermal portion of the facility.[5] The CSP plant became operational in 2015.[8]

External links

Notes and References

  1. Web site: Stillwater Facility, annual . Electricity Data Browser . . September 7, 2017.
  2. News: Harry Reid Announces the World's First Hybrid Solar-Geothermal Power Plant . Karoun . Demirjian . August 30, 2011 . . February 2, 2020.
  3. Web site: Enel Green Power Receives Approval for North America's First Renewable Hybrid Power Plant . Nathanael Baker . August 17, 2011 . November 3, 2012.
  4. News: Enel inaugurates Stillwater solar-geothermal hybrid project (update) . Steve Ranson . . May 3, 2012 . November 4, 2012.
  5. Web site: DiMarzio, Angelini, Price, Dhin, Harris . April 2015 . The Stillwater Triple Hybrid Power Plant - Integrating Geothermal Solar Photovoltaic and Solar Thermal Power Generation . live . https://web.archive.org/web/20160305204442/https://pangea.stanford.edu/ERE/db/WGC/papers/WGC/2015/38001.pdf . 2016-03-05.
  6. News: Pioneering project begins operation . Rob Sabo . May 7, 2012 . Northern Nevada Business Weekly . November 3, 2012.
  7. Web site: Concentrating Solar Power Projects - Stillwater GeoSolar Hybrid Plant - Concentrating Solar Power - NREL. www.nrel.gov . October 21, 2016. September 7, 2017.
  8. Web site: EGP-NA named GEA Honors 2015 Award Winner for First-of-Its-Kind Hybrid Plant . Enel Green Power .