Station Hill | |
Location: | Station Hill, Reading, England |
Coordinates: | 51.4576°N -0.9742°W |
Completion Date: | 2024 (first two phases) |
Architect: | CallisonRTKL and Gensler |
Owner: | Lincoln MGT |
Cost: | £750 million |
Map Type: | United Kingdom Reading Central |
Building Type: | Residential, Office, Retail and Lifestyle |
The Station Hill development is a ongoing redevelopment project in Reading, England. It occupies a site between Friar Street and Station Hill in the centre of Reading, and takes its name from the latter. The development is adjacent to Thames Tower and the Reading railway station.
As of 2022, construction has started. The eventual development will comprise up to of office space, 1,300 private and affordable homes, of new lifestyle-led retail and leisure space, including potential for a 200-bed hotel and later living accommodation, and a central 2acres piazza.November 2023.
A redevelopment of the land, then occupied by the disused Friars Walk shopping centre, bus station and former British Railways Western Tower offices, was initially proposed by Reading entrepreneur John Madejski, who bought the site in 2005.November 2023.
In 2012, the Station Hill project passed to a joint venture between Benson Elliot and Stanhope. In February, they released a new £400m plan to be displayed to the public.[1] After the exhibition at the Town Hall, the developers said that the plans had received a positive response.November 2023.
As of June 2018, Station Hill became a joint venture between Lincoln Property Company and MGT Investment Management (known as Lincoln MGT).[2] The BBC reported that the development was bought for close to £70 million from Sackville Developments.[3]
The development was split into three phases, with construction for the first two phases underway as of 2022 and the third having received outline planning permission. Phase one was due for completion in the fourth quarter of 2023 and phase two in early-2024.November 2023.