Interstate 405 (Oregon) Explained

State:OR
Type:I
Route:405
Alternate Name:Stadium Freeway No. 61
Map Custom:yes
Map Notes:A map of central Portland with I-405 highlighted in red
Length Mi:4.25
Established:1958[1]
Spur Of:5
Spur Type:I
Direction A:South
Terminus A: in Portland
Junction:
  • in Portland
  • in Portland
Direction B:North
Terminus B: in Portland
Counties:Multnomah
Previous Type:OR
Previous Route:402
Next Type:OR
Next Route:410

Interstate 405 (I-405), also known as the Stadium Freeway No. 61,[2] is a short north–south Interstate Highway in Portland, Oregon. It forms a loop that travels around the west side of Downtown Portland, between two junctions with I-5 on the Willamette River near the Marquam Bridge to the south and Fremont Bridge to the north.

The Stadium Freeway was envisioned in the 1940s and 1950s by the state government and was added to the Interstate Highway system in 1958. Construction began in 1963, utilizing a trench with extensive landscaping and frequent overpasses, and was the most expensive freeway project in state history at a cost of $121 million. Hundreds of buildings were demolished to make way for the freeway, which displaced approximately 1,100 households.

The southernmost section of I-405 opened on October 26, 1965, and was followed by extensions in 1966 and 1969. The final section, including the Fremont Bridge, opened in November 1973. Plans for a spur freeway, I-505, were cancelled in 1978 following public opposition; its interchange with I-405 was subsequently reused for a 1988 realignment of U.S. Route 30 (US 30), which runs concurrent with I-405 across the Fremont Bridge to I-5.

Route description

I-405 begins at a three-way stack interchange with I-5 and Harbor Drive on the south side of Downtown Portland near the South Waterfront neighborhood. I-5 continues northeast from the interchange to the Marquam Bridge to East Portland and south towards South Portland, passing under the Ross Island Bridge. I-405 travels northwest along the foothills of the Southwest Hills, traveling around the urban campus of Portland State University and passing the end of the South Park Blocks. It begins a short concurrency with US 26.[3]

US 26 splits from I-405 at an interchange north of Montgomery Street, traveling via the Vista Ridge Tunnels onto the Sunset Freeway towards the western suburbs of Portland. I-405 then turns northeast and narrows to four lanes as it travels through the east edge of the Goose Hollow neighborhood, passing the Multnomah County Central Library, Lincoln High School, and Providence Park, home of several local soccer teams. The below-grade freeway is connected to the neighborhood and the western fringe of downtown by a series of ramps that lead to Salmon and Taylor streets. At Yamhill and Morrison streets, I-405 crosses under bridges carrying MAX Light Rail trains, which continues west towards Beaverton and east to Downtown Portland.[4]

I-405 intersects Burnside Street and turns due north as it climbs out of the below-grade trench, running parallel to 15th and 16th avenues. After an interchange with Glisan Street, the freeway becomes elevated and passes over cross-streets in the Pearl District, including those carrying the tracks of the Portland Streetcar's NS Line. A streetcar maintenance barn and railyard is located under the freeway between Marshall and Overton streets.[5] [6] At the northwest edge of Downtown Portland, I-405 intersects US 30, which continues northwest along a short freeway into the Northwest Industrial Area that was originally intended for the cancelled I-505.[7] [8]

I-405 and US 30 become concurrent as they cross over the Willamette River on the eight-lane Fremont Bridge, a steel tied-arch bridge that carries southbound traffic on its upper deck and northbound traffic below.[9] The double-decker freeway continues northeast over the Union Pacific Railroad's Albina railyard and Interstate Avenue, a part of Route 99W that also carries the MAX Yellow Line. The northern terminus of I-405 is at a stack interchange with I-5 in the Eliot neighborhood; US 30 continues southeasterly onto I-5 for a short distance before beginning a concurrency with I-84. A set of ramps continue northeast from the interchange to Legacy Emanuel Hospital along the alignment of the cancelled Rose City Freeway.[10]

I-405, also designated as Stadium Freeway No. 61,[2] is the shortest Interstate freeway in the Portland area, at 4.2miles. It has a posted speed limit of 50mph because of the short distance between interchanges and high volume of merging traffic.[11] The highway is maintained by the Oregon Department of Transportation (ODOT), who conduct an annual survey of traffic volume that is expressed in terms of annual average daily traffic (AADT), a measure of traffic volume for any average day of the year. The busiest section of I-405 is at Burnside Street, which carried a daily average of 131,400 vehicles in 2018; and the least-trafficked section, at Southwest Broadway, carried 84,400 vehicles.[12] [13] The freeway had an estimated 8 hours of northbound congestion and 11.8 hours of southbound congestion in 2017, with average speeds of 22.8mph for northbound traffic and 23.8mph for southbound traffic during weekday afternoon rush hours.[11] TriMet operates one bus route on I-405, Line 24, which uses the Fremont Bridge as a connection between Slabtown and Legacy Emanuel Hospital.[14]

History

Planning and routing dispute

Highway planner Robert Moses was commissioned by the city government in 1943 to envision a program of public improvements that would begin after the end of World War II to provide employment for returning soldiers.[15] Among these were a network of "thruways" for Portland, including a downtown loop consisting of the Foothills Thruway (later forming I-405) and the East-Side Thruway (later I-5), connected by a northern crossing of the Willamette River.[16] [17] The Foothills Thruway would run along Northwest 24th Avenue and terminate at two intersections with Harbor Drive at the Ross Island Bridge to the south and the new Willamette River bridge to the north.[16] [18] A city study released in June 1955 proposed the construction of several freeways in downtown Portland, including the Sunset Freeway and Stadium Freeway—later combined to form I-405.[7] [19] The northern crossing would use the double-decker Fremont Bridge,[20] which had been proposed earlier as part of U.S. Route 99W in the 1920s but defeated in public referendums.[21] [22]

The federal Bureau of Public Roads included the Stadium Freeway in its 1955 recommendation for a national system of expressways that were later funded by the Federal-Aid Highway Act of 1956.[23] [24] The 3.8miles freeway was estimated to cost $71 million in 1958 dollars (equivalent to $ in dollars) and would be funded primarily by the federal government under the Interstate Highways program.[25] [26] The Oregon Highway Division studied a set of five alternate routes for the freeway, designated as Interstate 405 by the federal government in 1958,[1] [27] with input from the city government over potential impacts to the west side of the central business district.[28] The southern section from the Marquam Bridge to US 26 near Southwest Jefferson Street was split into two options: the Clay–Market route, following Clay and Market streets to the north of Portland State College; and the Foothills route, which would curve along the southwest side of an urban renewal area with a depressed roadway.[29] [30] The northern section from US 26 to the Fremont Bridge was split into three options: an elevated freeway between 15th and 16th avenues proposed by the city; an elevated freeway between 18th and 19th avenues; and a depressed roadway between 21st and 22nd avenues.[28] [31]

The city government, Portland State College, and downtown business groups lobbied in support of the Clay–Market route,[32] [33] producing their own study that claimed it would preserve downtown property values.[34] The Oregon State Highway Commission and Bureau of Public Roads preferred the Foothills route because it had $4 million (equivalent to $ in dollars) in cost savings compared to the Clay–Market route.[29] The Oregon chapter of the American Institute of Architects and several industry groups recommended a delay in deciding the route based on potential damage to the cityscape caused by the designs in both options.[35] [36] By late May, a total of 389 households and 37 businesses had been relocated in anticipation of the freeway project, while 47 buildings had been demolished.[37] The state highway commission hosted a public hearing in June 1960 to hear testimony from 300 people at Portland's Public Auditorium.[38] The commission adopted the Foothills route and 15th–16th elevated freeway for I-405 on July 8, which would cost an estimated $75.7 million to construct (equivalent to $ in dollars).[39] The Portland City Council then voted on July 14 to approve the general route endorsed by the state highway commission.[40]

Property acquisition and Foothills construction

The state government began negotiations to acquire property along the Stadium Freeway's future right of way in October 1960, later requesting federal funds to aid the city government with relocating an estimated 1,100 households affected by planned demolitions.[41] [42] An estimated 554 buildings with 1,668 residential units were in the right of way for the freeway,[39] including a school, several churches, and a recently completed synagogue for Congregation Shaarie Torah.[43] [44] In 1963, the owner of the Carlton Hotel, a long-term care home with 139 elderly residents, appealed the condemnation and planned demolition of the building to make way for the Stadium Freeway.[45] The state government agreed to assist in relocating the residents to a new building,[46] but its lack of a fire sprinkler system mandated for recipients of state welfare forced the eviction of 80 residents from the Carlton Hotel.[47] [48] Further planning work was delayed by a dispute with the city government and Bureau of Public Roads over the location of ramps and interchanges in early 1961, which were resolved with formal federal approval in August.[27] [49] The state highway commission approved the designation of Highway No. 61 for the Stadium Freeway on December 8, 1961.[50]

In February 1962, the Portland City Council postponed its decisions on closing streets for freeway construction and ratification of an agreement with the state highway commission on maintenance of ramps and overpasses after protests from local residents, who described I-405 as a "gigantic monstrosity" and the "West Side Suicide".[51] [52] The state highway commission halted its property acquisition negotiations the following month while awaiting the city council's approval of the agreement and other plans, which were required under federal law.[53] The protests coincided with the growing opposition to other freeway projects in the Portland area, including the Laurelhurst Freeway (I-205), at the onset of the region's freeway revolts.[7] [54] A pair of downtown businessmen formed the Citizens for Sane Freeways Committee and attempted to lobby the Bureau of Public Roads to adopt Harbor Drive as its route for I-405, but they were rejected because it did not meet modern freeway standards. The group later circulated a public petition with 3,000 signatures opposing the construction of the 13th–14th avenues section of the freeway between US 26 and Burnside Street.[55] [56] [57] On March 22, the city council voted unanimously to approve its agreements with the state highway commission after a four-hour public hearing with 35 speakers, allowing the state government to resume property acquisition.[58] [59]

The Stadium Freeway project was divided into several stages to reduce long-term disruption to cross-town access, beginning with the trenched roadway in the Foothills area with 19 overpasses and working northward.[60] [61] The project required the demolition of 282 homes, 138 businesses, and 131 apartment buildings, costing $25 million (equivalent to $ in dollars) in condemnations and land purchases.[62] The state highway commission awarded the first construction contract for the Stadium Freeway project in August 1963, accepting a $4.4 million bid (equivalent to $ in dollars) from the Donald M. Drake Company to build the 1.08miles section from the Ross Island Bridge to Southwest Broadway with connections to the Marquam Bridge and the new freeway which became I-5.[63] Construction began with utility relocation and the construction of temporary street detours in October 1963, ahead of work on the Vista Ridge Tunnels (part of US 26), which began the following month.[64] [65] Demolition and site clearing began by the end of 1963, with the St. Joseph's Catholic Church (built in 1887)[66] among the oldest buildings to be demolished for the project;[67] [68] other buildings were saved from demolition and moved to new locations, including the two-story Century Building (which suffered fire damage during its month-long move),[69] the former home of territorial governor George Law Curry,[70] and St. Helen's Hall at Trinity Episcopal Cathedral.[71] [72] The broadcast studios of KGW-TV were also demolished for the project, requiring a $865,000 settlement from the state government for its property.[73] [74]

The Stadium Freeway's first completed overpass, carrying Southwest 4th Avenue, opened to traffic in March 1965 and replaced a temporary crossing that had been in use since May 1964.[75] The not-yet-complete freeway was used as the boundary between the state's 1st and 3rd congressional districts following a special redistricting vote by the state legislature in May 1965.[76] The first section of I-405, between the Ross Island Bridge and Southwest Broadway, opened to traffic on October 26, 1965, two months later than scheduled and at a cost of $5.5 million (equivalent to $ in dollars).[77] [78] The delay was attributed to heavy rains that prevented painting of lane markings and to a failed shipment of raised pavement markers.[79] Excavation of the second section, also under the direction of the Drake Company, began in September 1965.[80] It opened in September 1966, extending I-405 from Broadway to Southwest Montgomery Street near the Vista Ridge Tunnel.[81] The Marquam Bridge opened a month later, granting access to East Portland via new ramps from I-405 to I-5.[82]

Northern section and cancelled extensions

Construction of the third phase of I-405, covering 1.17miles between Montgomery and Johnson streets, began in July 1966 under a $12.3 million contract (equivalent to $ in dollars)—the largest to be awarded by in the state highway commission's history.[83] [84] It included 22 overpasses to reduce disruption to the street grid and 55 retaining walls, which were covered by planted trees, shrubs, and ivy to beautify the freeway.[62] [85] An estimated 1000000cuyd of dirt were excavated for the project and reused to fill industrial sites on the Willamette River.[7] [86] The freeway's overpasses were opened to traffic in October 1968, but completion of the lanes and ramps was delayed over heavy rains that disrupted grading and installation of guardrails and signs.[87] The Montgomery–Johnson section was opened to traffic on February 25, 1969, after an additional two-month delay because of snowy and icy weather.[7] [88] It coincided with the opening of the Vista Ridge Tunnels, which provided a connection to the Sunset Freeway (US 26) and replaced an earlier street.[89] [90]

The tied arch design of the Fremont Bridge was approved by the state government, city council, and Bureau of Public Roads in May 1966.[91] The costlier design was recommended by the Portland Art Commission after public outcry over the perceived "ugliness" of the Marquam Bridge and the initial cantilever design for the Fremont Bridge.[92] [93] Construction began in late 1968 and was originally estimated to cost $22.4 million (equivalent to $ in dollars) until later design changes caused its total cost to reach $50 million (equivalent to $ in dollars).[62] [94] The Fremont Bridge and I-5 interchange opened on November 15, 1973, at a final cost of $82 million (equivalent to $ in dollars).[7] [95] I-405 cost a total of $121 million to construct (equivalent to $ in dollars), making it the most expensive freeway project in Oregon on a per-mile basis.[7]

The northern section included construction of stub ramps to two future freeway extensions: the Industrial Freeway (I-505) from the west end of the Fremont Bridge and the Rose City Freeway from the I-5 interchange at the east end of the bridge. I-505 was approved by the federal government in 1969 and was planned to begin construction shortly after the bridge opened, but was halted by lawsuits from neighborhood activists.[96] [97] The project was cancelled in 1978 and the ramps were reused for an expressway section of US 30 connecting to Yeon Avenue, which opened in 1988.[98] [99] The Rose City Freeway remained part of a long-term freeways plan from the city government, but was later cancelled because of a lack of funding.[100] [101] The unused ramps were instead redirected to Kerby Avenue to serve the expanded Legacy Emanuel Hospital with approval from the city council in 1974 despite protests from local residents, which stalled the project for several years.[102] [103] The ramps were opened in 1979 with limited access to nearby streets as a compromise for the neighborhood.[104] [105]

Later developments

In August 2009, the entirety of I-405 with the exception of the Fremont Bridge was completely repaved for the first time by ODOT.[106] The bridge itself was repaved in August 2011.[107] ODOT began a year-long project to repair and replace expansion joints on elevated sections of the freeway in March 2019 because of extended deterioration of the structure.[108]

In 1998, Mayor Vera Katz proposed capping the southwest portion of I-405 to create space for parks, housing, and offices.[109] [110] A similar proposal was suggested by the Portland Art Commission in 1964, but not studied until the adoption of the 1972 Downtown Plan.[111] [112] Plans to cap portions of I-405 have been made by grassroots organizations since the 2000s, aiming to mitigate the effects of the freeway and create new development in northwestern Portland.[113] [114] A 200feet bridge, named Ned Flanders Crossing for The Simpsons character Ned Flanders,[115] was built to create a pedestrian and bicycle connection across I-405 between two sections of Northwest Flanders Street in Northwest Portland.[116] Construction on the bridge began in June 2020 and it opened a year later at a cost of $9.5 million.[117] [118]

Notes and References

  1. Web site: November 10, 1958 . Correspondence, A. E. Johnson and W. C. Williams . 2–3 . . AASHTO Route Numbering Archive . April 2, 2021 .
  2. Web site: 2020 . 2020 Cross Reference Table of Highway Route Number to State Highway Number . 1 . Oregon Department of Transportation . March 31, 2021 .
  3. Oregon Department of Transportation . April 2019 . Oregon 2019–2021 Official State Map . Portland and Vicinity . Oregon Department of Transportation . March 6, 2021 .
  4. . 2017 . Morrison–Yamhill MAX Improvements . TriMet . April 21, 2019 . April 22, 2019 . https://web.archive.org/web/20190422061054/https://trimet.org/alerts/morrisonyamhill/img/Morrision-Yamhill-ImprovementsMap.pdf . dead .
  5. News: Stewart . Bill . August 2, 2000 . New barn for Portland Streetcar is a bit off track . B3 . .
  6. TriMet . Portland City Center . TriMet . April 21, 2019 .
  7. Kramer . George . May 2004 . The Interstate Highway System in Oregon: A Historic Overview . 65–68 . Oregon Department of Transportation . . April 21, 2019 .
  8. News: Federman . Stan . February 9, 1987 . Mild days aid work on roads . B3 . The Oregonian .
  9. Web site: ODOT History Committee . January 2009 . Oregon on the Move: A History of Oregon's Transportation Systems . 67 . Oregon Department of Transportation . May 6, 2021 .
  10. Book: November 1976 . Fremont Bridge Access Study: Draft Environmental Impact Statement . 1 . . . March 29, 2021 .
  11. Web site: December 2018 . Portland Region 2018 Traffic Performance Report . 47–51 . Oregon Department of Transportation . April 1, 2021 .
  12. Web site: October 2019 . 2018 Transportation Volume Tables . 86 . Oregon Department of Transportation . March 31, 2021 .
  13. Oregon Department of Transportation . 2019 . Oregon State Highway System Traffic Flow Map 2018 . Portland . Oregon Department of Transportation . March 31, 2021 .
  14. News: Theen . Andrew . March 1, 2019 . 1st TriMet bus line ever across Fremont Bridge will link NW Portland with eastside . The Oregonian . April 21, 2019 .
  15. News: Nokes . Richard . November 10, 1943 . Moses Proposes $75,000,000 Postwar Works for City . 1 . The Oregonian .
  16. Book: Moses, Robert . Robert Moses . November 10, 1943 . Portland Improvement . 32, 34 . Multnomah County . . April 2, 2021 .
  17. News: Mesh . Aaron . November 4, 2014 . Feb. 4, 1974: Portland kills the Mount Hood Freeway... . . April 21, 2019 .
  18. News: Nokes . Richard . November 14, 1943 . City Planners Pleased Over Moses Program; Definite Action Pledge . 12 . The Oregonian .
  19. News: Shoemaker . Mervin . June 29, 1955 . Plan Given For Traffic Of Future; Baldock Proposal Centers On City Freeway System . 1, 33 . The Oregonian .
  20. News: Ewing . Paul F. . January 8, 1954 . Fremont Bridge Studied . 11 . The Oregonian .
  21. News: January 19, 1930 . New Span To Be Sought . 9 . The Oregonian .
  22. News: May 17, 1930 . Span and Pension Lose . 5 . The Oregonian .
  23. Book: 1955 . General Location of ⁠National System of Interstate Highways . 71 . . 4165975 . . March 30, 2021 .
  24. Weingroff . Richard F. . 1996 . Federal-Aid Highway Act of 1956: Creating The Interstate System . Public Roads . 60 . 1 . Federal Highway Administration . March 30, 2021 .
  25. News: Harvey . Paul W. Jr. . January 24, 1958 . U.S. Highway Standards Up State's Costs . A7 . . . . March 30, 2021 .
  26. News: Edwards . Herman . March 9, 1958 . Big Changes Hinge on Routing of East Bank Freeway . 31 . The Oregonian .
  27. News: August 20, 1961 . New Portland Freeway to Collect Downtown Traffic . 5 . . Newspapers.com . March 30, 2021 .
  28. News: Edwards . Herman . January 18, 1959 . Highway Commission to Air Federal Network for Portland . 28 . The Oregonian .
  29. News: January 29, 1960 . Freeway Report Shuns Choice Of Specific City Route; Portland Selection Not Made . 1 . The Oregonian .
  30. News: Johnson . Jalmar . June 3, 1960 . Many Pitfalls Confront Cities In Planning Freeway Systems . 26 . The Oregonian .
  31. News: February 7, 1960 . Factual State Study Airs West Portland Highway Locations . 33 . The Oregonian .
  32. News: April 23, 1960 . Downtowners To Fight For Clay-Market Route . 5 . The Oregonian .
  33. News: March 8, 1960 . Portland State College Joins Group Favoring Clay-Market Freeway Route . 1 . The Oregonian .
  34. News: McKean . Doug . July 5, 1960 . Decision On Stadium Freeway Location Due Thursday . sec. 3, p. 8 . .
  35. News: June 10, 1960 . Architects Urge Delay In Selection Of Freeway . 20 . The Oregonian .
  36. News: July 7, 1960 . Portland Groups Seek Stadium Freeway Delay . 1 . The Oregonian .
  37. News: May 26, 1960 . Delay Seen On Freeway . 12 . The Oregonian .
  38. News: June 14, 1960 . New Freeway Decision Set For July 7–8 . The Oregonian .
  39. News: Edwards . Herman . July 8, 1960 . State Picks Route Site In Foothills . 1 . The Oregonian .
  40. News: March 23, 1962 . City Council OKs Stadium Freeway Job . 1 . The Oregon Journal .
  41. News: September 30, 1960 . Negotiations To Start On Foothills Property . 11 . The Oregonian .
  42. News: June 6, 1961 . Schrunk To Ask U.S. For Relocation Help . sec. 1, p. 12 . The Oregon Journal .
  43. News: January 27, 1962 . Church Buildings Face Wrecking For Freeway . 9 . The Oregon Journal .
  44. News: July 9, 1960 . Proposed freeway would obliterate new synagogue . 8 . . . Newspapers.com . April 2, 2021 .
  45. News: Davenport . Marge . July 26, 1963 . Freeway Plan Dooms 'Home' For 139 Old-Timers . 3 . The Oregonian .
  46. News: August 27, 1964 . Old Folks Hotel Row Settled . 1 . The Oregon Journal . United Press International .
  47. News: Davenport . Marge . November 18, 1964 . Welfare Regulations To Leave 90 Carlton Residents Out . 6 . The Oregon Journal .
  48. News: Thompson . Peter . January 27, 1965 . Oldsters Evicted From Hotel . 6 . The Oregon Journal .
  49. News: Zaitz . Clarence . May 21, 1961 . Red Tape Holding Up Road Plans . sec. 1, p. 3 . The Oregon Journal .
  50. News: December 9, 1961 . New State Highway Engineer Got Start In '22 . 8 . The Oregonian .
  51. News: February 17, 1962 . Bean Suggests Public Decide Freeway Route . 1, 6 . The Oregonian .
  52. News: February 24, 1962 . City Delays Route Vote . 11 . The Oregonian .
  53. News: Edwards . Herman . March 3, 1962 . Right-Of-Way Acquisitions Come To Halt . 1 . The Oregonian .
  54. News: Edwards . Herman . March 11, 1962 . New Freeway Sparks Grim City 'Revolt' . 1, 43 . The Oregonian .
  55. News: Ostergren . Jack . March 10, 1962 . Stadium Freeway Route Hit . 10 . The Oregon Journal .
  56. News: March 16, 1962 . Town Topics: Freeway Hearing Row Seen . 4 . The Oregon Journal .
  57. News: March 20, 1962 . 3,000 Petitioners Ask Stadium Freeway Shift . 8 . The Oregon Journal .
  58. News: Edwards . Herman . March 23, 1962 . Council Gives Green Light To Stadium Freeway; Witnesses Fight Hard for Route . 1, 20 . The Oregonian .
  59. News: March 24, 1962 . State To Resume Buying Properties For Freeway . 5 . The Oregonian .
  60. News: February 2, 1969 . Street work: West side mess May have relief . 1 . The Oregonian .
  61. News: May 9, 1963 . Freeway System To Help Untie Traffic . H15 . The Oregonian .
  62. News: Federman . Stan . February 23, 1969 . 'Concrete Monster' Caps Lengthy Dispute . 17 . The Oregonian .
  63. News: October 10, 1963 . Work Slows On 2 Streets . 27 . The Oregonian .
  64. News: Edwards . Herman . October 13, 1963 . Earth-Moving Equipment Starts Gouging Out Bypass Road For Freeway Construction . 40 . The Oregonian .
  65. News: November 16, 1963 . Work Starts On Tunnels . 8 . The Oregonian .
  66. News: Staihar . Janet . August 24, 1963 . Road To End German Catholic Church . 5 . The Oregonian .
  67. News: February 3, 1964 . New Route Cuts Swath Through Old Portland . 35 . The Oregonian .
  68. News: Ostergren . Jack . June 3, 1964 . Two New Freeways Stir Fuss; Home, Business Site 'Gobbling' Protested . 2 . The Oregon Journal .
  69. News: September 11, 1964 . Short-Circuit Causes $12,000 Fire In Portland's 'Moving' Building . 3 . The Oregon Journal .
  70. News: Rocchia . Andy . July 1, 1964 . Traffic Tieups, Trees And Trepidation Involved In House Relocation . 5 . The Oregon Journal .
  71. News: August 18, 1964 . Portland Firemen, Police Help St. Helen's Hall Move . 12 . The Oregonian .
  72. News: March 24, 1964 . Tenants Will use Building On Move . 1 . The Oregon Journal .
  73. News: November 7, 1964 . County Writes Largest Check . 4 . The Oregonian .
  74. News: June 7, 1965 . KGW Radio, Television Using Modern Broadcasting Center . 10 . The Oregon Journal .
  75. News: March 2, 1965 . Overpass To Open . 4 . The Oregon Journal .
  76. News: Hughes . Harold E. . May 26, 1965 . Legislature Fixes Congressional Boundaries; Vote Ends Five-Day Deadlock . 1 . The Oregonian .
  77. News: Long . James . October 26, 1965 . Stadium Freeway Stretch Opens; Few Cars On Hand For 'Rites' . 1 . The Oregon Journal .
  78. News: October 24, 1965 . Freeway Link Opens Tuesday, Easing Downtown Bottleneck . 1 . The Oregonian .
  79. News: October 15, 1965 . No 'Buttons,' No Freeway . 1 . The Oregonian .
  80. News: September 17, 1965 . South On-Off Freeway Lanes Slated For Use Next Month . 40 . The Oregonian .
  81. News: September 2, 1966 . New Freeway Section Ready . 25 . The Oregonian .
  82. News: October 5, 1966 . New Bridge Deck Opened . 1 . The Oregonian .
  83. News: July 30, 1966 . New Freeway Enters Phase Three . sec. 2, p. 4 . The Oregonian .
  84. News: June 3, 1966 . Stadium Freeway Contract 'Largest' . 13 . The Oregonian .
  85. News: June 13, 1966 . Road Crews Beautify Portland Approaches . 32 . The Oregonian .
  86. News: August 7, 1965 . $70 Million 'Cut' Tears City...Provides Fill For New Site . 1 . The Oregon Journal .
  87. News: October 4, 1968 . Completion Delayed On Freeway Section . 16 . The Oregonian .
  88. News: January 18, 1969 . Road Not To Open . 16 . . Associated Press . Newspapers.com . April 21, 2019 .
  89. News: Crick . Rolla J. . February 25, 1969 . Sections Of Sunset, Stadium Freeways Open . 6 . The Oregon Journal .
  90. News: February 21, 1969 . Motorists Cautioned About Freeway . 22 . The Oregonian .
  91. News: May 10, 1966 . Fremont Bridge Wins U.S. Okay . 17 . The Oregonian .
  92. News: Painter . John Jr. . August 26, 1965 . Beauty-Budget Battle Flares Anew As City Council Studies Bridge Designs . 27 . The Oregonian .
  93. News: Edwards . Herman . February 18, 1963 . City, State Officials Seek Esthetic Style For Fremont Bridge . 12 . The Oregonian .
  94. News: Federman . Stan . March 29, 1968 . Design Changes Hike Bridge Complex Cost . 23 . The Oregonian .
  95. News: November 16, 1973 . Fremont Bridge opens with wheeze . 22 . The Oregonian .
  96. News: January 15, 1970 . Canada, Japan Mills To Provide Majority Of Fremont Bridge Steel . 12 . The Oregonian .
  97. News: Pintarich . Paul . November 14, 1973 . Fremont Bridge only 'sure thing' in NW Portland traffic pattern . F4 . The Oregonian .
  98. News: Mantia . Patty . December 12, 1978 . I-505: the little freeway that wasn't . B7 . The Oregonian .
  99. News: Federman . Stan . May 5, 1988 . Summer 1988 to be fairly free of road hassles . C2 . The Oregonian .
  100. News: September 9, 1971 . Freeway squabble triggers City Hall row . 25 . The Oregonian .
  101. News: Hortsch . Dan . December 15, 1976 . Fremont Bridge ramps provoke discussion . E8 . The Oregonian .
  102. News: Noles . BJ . January 17, 1974 . Council OKs Flint-Kerby off-ramp . 1 . The Oregonian .
  103. News: January 5, 1977 . Metro roundup: Planning panel weighs Fremont ramp options . C1 . The Oregonian .
  104. News: September 12, 1979 . New Look . E8 . The Oregonian .
  105. News: Williams . Linda . January 22, 1981 . Full use of bridge offramps urged . B1 . The Oregonian .
  106. News: Redden . Jim . July 28, 2009 . Repaving will close I-405 . . April 21, 2019 .
  107. News: July 21, 2011 . Portland traffic: Month of Fremont Bridge upper-deck closures starts this weekend . The Oregonian . April 5, 2021 .
  108. Web site: I-405: Ramps Project . Oregon Department of Transportation . April 5, 2021 .
  109. News: Parente . Michele . July 14, 1998 . Katz's idea for I-405 cap splits council . B2 . The Oregonian .
  110. News: Learn . Scott . September 28, 2000 . Committee says I-405 cap possible in five years . A1 . The Oregonian .
  111. News: April 17, 1964 . 'Roof' Road Proposed . 4 . The Oregon Journal .
  112. News: Learn . Scott . April 5, 1999 . Katz appoints team to study how to cap I-405 . C2 . The Oregonian .
  113. News: Mehlhaf . Nina . February 25, 2015 . Grassroots support for building I-405 freeway cap . . August 16, 2015 .
  114. News: Slovic . Beth . May 25, 2012 . Could capping Interstate 405 be in Portland's future? Portland City Hall roundup . The Oregonian . April 21, 2019 .
  115. News: Ramakrishnan . Jayati . September 9, 2021 . Neighborinos say 'hi-diddly-ho' to new Ned Flanders Crossing in NW Portland . The Oregonian . September 9, 2021 .
  116. News: VanderHart . Dirk . August 22, 2016 . A New Bike/Pedestrian Bridge Is Coming to NW Portland—And Spurring Some Debate . Portland Mercury . April 21, 2019 .
  117. News: Ding . Jaimie . January 24, 2021 . I-405 reopens after Flanders Crossing installation; pedestrian, bike bridge to open this spring . The Oregonian . March 29, 2021 .
  118. News: Swindler . Samantha . June 4, 2021 . Flanders Crossing, a new bicycle and pedestrian bridge over I-405, opens in Northwest Portland . The Oregonian . June 4, 2021 .