St. Croix Crossing Explained

Bridge Name:St. Croix Crossing
Official Name:St. Croix Crossing
Carries:4 lanes of
Crosses:St. Croix River
Locale:Oak Park Heights, Minnesota and St. Joseph, Wisconsin
Maint:MnDOT and WisDOT
Design:Extradosed bridge
Below:150 feet
Open:August 2, 2017
Toll:None
Coordinates:45.0422°N -92.7849°W

The St. Croix Crossing is an extradosed bridge that spans the St. Croix River, between Oak Park Heights, Minnesota and St. Joseph, Wisconsin. Connecting Minnesota State Highway 36 and Wisconsin State Highway 64, the bridge carries four lanes of traffic (two lanes in each direction), and includes a bike/pedestrian path on the north side.[1]

History

MnDOT, WisDOT, and the Federal Highway Administration were seeking a replacement for the nearly 90 year old Stillwater Bridge, which was frequently congested, inadequate for modern traffic, and was deteriorating from its age. The St. Croix River Crossing Project called for the construction of a new four-lane bridge less than a mile downriver, followed by the conversion of the Stillwater Bridge to pedestrian and bicycle use. Originally, construction of this bridge was planned to start in 2024, but legislation was passed requiring the Department of Transportation to address aging bridges by 2018, and the start date was moved up to 2013.[2] However, on March 11, 2010, a federal judge ruled that the government had violated its rules in approving the bridge design, which sent the process back to an earlier stage.[3] Because the bridge traverses the Saint Croix National Scenic Riverway, construction could only proceed following federal legislation which granted an exemption to the Wild and Scenic Rivers Act.[4]

The extradosed bridge design results in fewer piers compared to a box girder bridge, improving maritime navigation and reducing environmental impact. While compared to a traditional cable-stayed bridge, tower height is lower and thus does not overwhelm the scenery of the Saint Croix riverway.[5] [6]

Construction on the bridge began with the piers in 2014. The bridge was opened to vehicle traffic following a ribbon-cutting ceremony on August 2, 2017.[7] [8]

See also

Notes and References

  1. Web site: St. Croix Crossing. August 2, 2017. Minnesota Department of Transportation. PDF. August 3, 2017.
  2. Web site: St. Croix River Crossing Project: Revised Construction Dates . PDF. June 2008 . Minnesota Department of Transportation.
  3. Web site: Plans for new St. Croix bridge headed back to drawing board . March 2010 . Minnesota Public Radio.
  4. News: Obama gives his approval to bridge across St. Croix River. Star Tribune. 2017-08-06.
  5. Web site: ST. CROIX CROSSING BRIDGE . Ames Construction . 6 January 2023.
  6. Web site: MnDOT St. Croix Crossing extradosed bridge . Youtube . Minnesota Department of Transportation . 6 January 2023.
  7. Web site: St. Croix Crossing Background . Minnesota Department of Transportation . August 2, 2017 . August 3, 2017.
  8. News: Thousands celebrate as new St. Croix River bridge opens, Lift Bridge closes. Star Tribune. 2017-08-06.