Spearhead-class expeditionary fast transport explained

The Spearhead-class expeditionary fast transport (EPF) is a United States Navy–led shipbuilding program to provide a high-speed, shallow draft vessel intended for rapid intra-theater transport of medium-sized cargo payloads. The EPFs can reach speeds of 35-, and allow the rapid transit and deployment of conventional or special forces, equipment and supplies.[1] [2]

The vessels are a part of Military Sealift Command's Sealift Program.[3] The class was previously designated as "Joint High Speed Vessel (JHSV)", and redesignated in September 2015.[4]

Capabilities

The EPF is able to transport U.S. Army and U.S. Marine Corps company-sized units with their vehicles, or can be reconfigured to become a troop transport for an infantry battalion.[1]

The EPF has a flight deck for helicopters and a load ramp that will allow vehicles to quickly drive on and off the ship. The ramp is suitable for the types of austere piers and quay walls common in developing countries. EPF has a shallow draft (under 15feet).[1]

The EPF is an aluminum twin-hull catamaran shell containing four diesel engines, rudimentary facilities for up to 40 crew members, and 312 airline-style passenger seats, with an expansive flight deck on the top. The rest of the vessel is a convertible 20000ft2 mission bay that can be loaded to carry any cargo.[5] Vehicles and cargo are loaded and unloaded by a ramp that can support up to 100 tons of weight. Although designed for a military crew of 46, the ships usually have a crew of 26. The passenger room contains reclining seats with overhead televisions and racks for weapons and equipment.[6] Each vessel has 104 permanent berthing spaces. Without resupply, it can support 312 embarked personnel for four days, or 104 personnel for 14 days.

The design is a derivative of the Hawaii Superferry, also built by Austal USA.[7]

The EPF has a greater level of comfort for the crew than larger Navy ships. The stateroom-style berthing areas for the ship's crew have private features including toilet stalls, outlets, air conditioning, and thermostats. People being transported are less well catered for. They may live in "hot racking"-style living arrangements of available berthing bunks if necessary. There is no ship's store in the typical Navy sense of the term, but the ship's captain may unlock the "slop chest" and sell ship's coins and other ship-specific paraphernalia on a case-by-case basis.[8]

The ship is unstable in rough seas and at high speeds. At 10 knots in calm sea states the hull can roll up to four degrees to each side, while conventional ships would roll very little. This increases if the ship goes faster or in rougher conditions, raising the possibility of seasickness. To achieve its top speed the ship has to be traveling in waters not exceeding sea state 3, waves up to 1.25m (04.1feet) high. At sea state 4 it can travel at up to 15 knots, at only 5 knots in sea state 5, and has to hold position in any higher sea state. This reflects the ship's purpose of operating close to shore rather than in "blue water".[9]

, an EPF costs $180 million to build and has an annual operating cost of $26 million.

Other roles

The U.S. 4th Fleet has expressed interest in using the EPF as a low-cost ship for performing drug interdiction missions around Central and South America. U.S. Southern Command is experiencing a shortage of Coast Guard cutters available to interdict drug runners due to ship age and budget cuts. In May 2013, HSV-2 Swift conducted a drug interdiction patrol, showing that an aluminum catamaran was capable of performing the role. An EPF is capable of embarking a Coast Guard Law Enforcement Detachment (LEDET).

The EPF has no weapons or defensive systems to fulfill combat missions, but the Navy is looking to expand its roles to include re-supplying special operations forces and conducting humanitarian assistance missions.[10] Chief of Naval Operations Jonathan Greenert has suggested using the ships as a cheaper way to perform counter-piracy missions to free up blue-water combatants.[11] Offensive armament and defensive measures against pirates would be handled by a security team on board, and an EPF's speed would also be a good defense against an attack by pirates.[12]

After various tests to explore the EPF's suitability to perform different missions, the ship was found to perform its primary role of intra-theater transport effectively, but had extreme difficulty in carrying out other suggested missions. When performing at-sea transfers of equipment with a Mobile Landing Platform (MLP), the EPF ramp used for vehicle transfers could not effectively operate with it in open ocean sea states of 2–3, and was determined to only be able to work in calm sea states found in protected harbors, an unacceptable constraint for operational deployment. The Navy has been aware of the current ramp's limitations and is developing one for use in up to sea states 3–4. When deploying a SEAL Delivery Vehicle (SDV), the EPF's stern-mounted crane could launch it in up to sea state 3 conditions, but support surface craft were needed to get divers into the underwater vehicle, which could only be launched in sea state 2.[9]

Electronic systems

The electronic systems for this class are provided by General Dynamics Mission Systems. The infrastructure integrates the ship's electronic systems including: computing environment, internal and external communications, electronic navigation, aviation and armament systems, remote surveillance system, plus the entertainment & training system.[13] The same General Dynamics OPEN CI is used on the, also built by Austal USA.[14]

Amphibious assault

Marine Corps General John M. Paxton, Jr. called the EPF "a very capable ship" for certain missions, but cites several deficiencies as a substitute amphibious assault ship, including inability to operate in difficult sea states, survivability in contested waters, lack of a well deck to launch amphibious vehicles, and lack of "splash capability" to drive vehicles off the ramp into the sea.[15] The ship has been rejected as a platform on which to base MV-22 Ospreys due to its weight, and potential flight deck damage from engines during take-off and landing.[16]

The USMC is investigating changes to the EPF ramp to enable the "splash capability" for placing Amphibious Combat Vehicles into the water near the shore.[17] A single EPF could carry and deploy 20 to 30 ACVs.[18] [19]

Expeditionary Medical Ship

Beginning with EPF-14, the ships will be designated as EPF Flight II, with increased health services capabilities while still maintaining most of the original mission of the ship.[20] The Flight II variant is designed to bring enhanced medical capabilities at the request of Combatant Commanders, and allows patients to recover onboard rather than in a higher-level facility. They can respond faster, and to more places than the Navy's larger, slower and unarmed hospital ships.[21] The EPF Flight II design includes upgrades to the medical facilities for resuscitation and surgery, enhanced support of V-22 flight operations, and enhanced launch and recovery of 11-meter rigid inflatable boats.[22]

In January 2023, the Navy announced that three Expeditionary Medical Ships (EMS) had been approved in the 2023 military budget. They will be Bethesda, Balboa, and the to-be-named T-EMS-3. These are planned to be about 118m (387feet) versus the earlier ships 103m (338feet), and have a draft of 4.5m (14.8feet) for operations in "austere ports". The EMS will have four operating rooms and 124 medical beds, separated into acute care, acute isolation, ICU, and ICU isolation spaces.[23] Two 11-meter rigid-hulled inflatable boats allow for the transfer of patients from other ships or water rescue; the flight deck has room for a single V-22, or an H-53 or H-60 helicopter. is planned for delivery by December 2026.[24]

Program

The EPF program combines the Army's Theater Support Vessel (TSV) program, dating from 2004, with the Navy and Marine Corps High Speed Connector (HSC), requirement dating from 2004.[25] [26] The EPF program received Milestone A approval in May 2006. The Navy awarded Phase One preliminary design contracts in early 2008, and a detail design and construction contract in the 4th Quarter of FY08.[1] The Navy's Program Executive Office, Ships will conduct acquisition for both the Army and Navy, but each service will fund its own ships. After delivery, each service will be responsible for manning, maintaining, and providing full lifecycle support for its vessels.[1]

, the lead ship in the class, was launched in September 2011 and delivered to the Navy in early 2012.[27] The Navy expected to purchase 23 EPF vessels over 30 years.[28] On 2 May 2011, all Army JHSVs were transferred to the Navy.[29] In June 2011, Austal was awarded construction contracts for EPF-6 and EPF-7.[30] In February 2012, Austal was awarded construction contracts for EPF-8 and EPF-9.[31] On 5 December 2012, the first ship in the class, USNS Spearhead, was delivered to Military Sealift Command in Mobile, Alabama. On 10 December 2012, the Navy awarded its final option under its current contract, and ordered EPF-10.[32]

In April 2013, the EPF program was added to the remit of the Littoral Combat Ship Council, so that the capabilities of both ship types could be considered together.[33] In 2014, the USN considered outsourcing the management of the fleet, but concluded that the ships would continue to be manned by civil service mariners.[34]

Funding for the construction of an eleventh EPF was appropriated by Congress in the FY 2015 National Defense Authorization Act.[35] In May 2016, the procurement of long-lead-time material and initial engineering support for the Expeditionary Fast Transport (EPF) 12, formerly Joint High Speed Vessel 12, was announced under the Naval Sea Systems Command's contracting activity. In September 2016, Austal was awarded a contract to design and construct EPF-11 and EPF-12.[36] In February 2018, Navy Secretary Richard V. Spencer announced the name of T-EPF-12 as Newport.[37]

Congress allocated money for a 13th Expeditionary Fast Transport (EPF) in the FY 2018 budget, and a 14th EPF in the FY 2019 budget.[38] In October 2018, the navy awarded Austal a $57.8 million order to fund the procurement of long lead-time materials, which included diesel engines, water jets and reduction gears, for the construction of the 13th EPF.[39] In December 2018, the navy awarded Austal a $40.4 million order to fund the procurement of long lead-time materials, which included diesel engines, water jets and reduction gears, for the construction of the 14th EPF.[40]

In March 2019, the Navy awarded Austal a $262 million contract for the design and construction of two additional Expeditionary Fast Transport Ships, EPF-13 and EPF-14. This follows the long lead-time materials contracts awarded in October 2018, of $57.8M for EPF-13, and $40.4M in December 2018 for EPF-14. Construction of EPF-13 is scheduled to begin in late 2019, and EPF-14 is to follow in the middle of 2020.[41] In February 2021, the U.S. Navy awarded Austal a $235 million contract for the detailed design and construction of EPF-15. EPF-15 will include enhanced medical capability.[42]

Austal USA secured a contract from the US Department of Defense to carry out the detailed design, procurement, production implementation, and demonstration of autonomous capability in EPF-13.[43]

History

In June 2011, a fifty-ton module was damaged at the Austal shipyard in Mobile during the construction of USNS Choctaw County.[44]

In 2013 a Frost & Sullivan report predicted that sales could be made to APAC countries.[45]

During operations in 2015, the first ship of the class, USNS Spearhead, experienced bow damage from rough seas requiring more than a half-million dollars (USD) to repair. It was determined that a design change that Austal recommended to the Navy late in the design phase to save weight, has resulted in a weakened bow structure. The first five ships in the class will require additional work done to improve the superstructure, at a cost of $350k-$1.2M each. The remaining ships which are still various stages of construction will require upgrading following construction as well.[46] [47]

Derivatives

HSSV

In early 2014, Austal announced it had been awarded a $124.9 million contract for two High Speed Support Vessels (HSSV) for a foreign customer, later revealed to be the Royal Navy of Oman. The HSSV has a similar catamaran hull design as the EPF and supports naval operations including helicopter operations, rapid deployment of military personnel and cargo, and search and rescue missions. It is 72.5m (237.9feet) long and can travel at 35 knots. An HSSV has a crew of 69 personnel with 69 berths, can seat another 250, and has a cargo capacity of 320 tonnes (350 short tons). Both are to be delivered by 2016.[48]

Austal launched the first HSSV, RNOV Al Mubshir, in October 2015 at its Henderson, Western Australia facility.[49] [50] It was delivered to Oman in May 2016.[51]

Ships in class

ShipLaid downLaunchedDeliveredStatus
Flight I
22 July 201012 September 20115 December 2012Currently inactive[52]
8 November 20111 October 20126 June 2013Currently inactive[53]
3 May 20125 June 201321 March 2014In service[54] [55] [56]
[57] 20 May 201316 January 201415 September 2014Inactive[58]
10 March 201430 September 201413 April 2015In service[59] [60]
2 December 201419 May 201514 January 2016In service[61]
31 July 201520 January 201624 June 2016In service[62]
29 March 201617 September 201621 April 2017In service[63] [64]
18 January 20177 June 201719 December 2017In service[65] [66]
26 September 20171 March 201815 November 2018In service[67] [68]
9 August 201813 November 201810 December 2019In service[69] [70]
29 January 201920 February 20203 September 2020In service[71] [72]
21 January 202113 November 202116 February 2023In service[73] [74]
Flight II
26 January 202220 March 202311 January 2024In service[75]
27 June 2023Under construction[76]
Under construction[77] [78] [79]
Expeditionary Medical Ship
Awarded[80] [81] [82]
Awarded[83] [84]
(T-EMS-3)Awarded[85]

Related/similar projects

The Army and Navy have been operating HSVs for some time, including;

Other ships of note;

See also

External links

Notes and References

  1. Web site: Joint High Speed Vessel (JHSV) . . 12 March 2010.
  2. Web site: Joint High Speed Vessel (JHSV) . GlobalSecurity . 12 March 2010.
  3. Web site: Archived copy . 11 January 2016 . 29 August 2007 . https://web.archive.org/web/20070829061246/http://www.msc.navy.mil/inventory/inventory.asp?var=PM5 . deviated .
  4. http://www.navytimes.com/story/defense/2015/09/03/navy-ship-designations-jhsv-mlp-afsb-joint-high-speed-vessel-afloat-forward-staging-base-mobile-landing-platform-mabus-greenert/71642184/ A New Class of Ship – 'Expeditionary Support'
  5. https://www.wired.com/2011/09/pickup-truck-of-the-sea/ Navy's Newest Ship Is Pickup Truck of the Sea
  6. http://www.stripes.com/news/navy-explores-new-roles-with-first-in-class-usns-spearhead-1.279984 Navy explores new roles with first-in-class USNS Spearhead
  7. http://www.gao.gov/pdfs/GAO-10-388SP?source=ra#page=82 . GAO-10-388SP. Joint High Speed Vessel (JHSV) . Defense Acquisitions: Assessments of Selected Weapon Programs . . March 2010 . 77–78.
  8. https://www.govinfo.gov/app/details/USCODE-2022-title46/USCODE-2022-title46-subtitleII-partG-chap111-sec11103 46 USC 11103, Slop chests
  9. News: DOT&E: JHSV Effective at Intra-Theater Transport But Challenged in Other Missions . Eckstein . Megan . 16 October 2015 . usni.org . USNI . 16 October 2015.
  10. Web site: Navy Considers JHSV for Special Operations Missions . DoD Buzz . 26 March 2014 . Kris . Osborn.
  11. News: Retiring frigates may leave some missions unfilled . 26 July 2014 . . 14 August 2022.
  12. http://www.navytimes.com/article/20140506/NEWS04/305060075/USNS-Spearhead-returns-from-maiden-deployment USNS Spearhead returns from maiden deployment
  13. General Dynamics Advanced Information Systems to Integrate Ship Mission System for Austal Joint High Speed Vessel (JHSV) ]. General Dynamics . 17 November 2008.
  14. News: Expeditionary Fast Transport (EPF) - General Dynamics Mission Systems. General Dynamics Mission Systems. 2016-12-09.
  15. http://news.usni.org/2014/10/02/usmcs-paxton-potential-marine-deployments-lcs-jhsv-carry-risks USMC's Paxton: Potential Marine Deployments On LCS And JHSV Carry Risks
  16. http://news.usni.org/2015/01/13/sna-surface-leaders-make-case-modified-littoral-combat-ship SNA: Surface Leaders Make the Case for the Modified Littoral Combat Ship
  17. News: Freedberg Jr. . Sydney J. . 16 April 2014 . Marines Seek New Tech To Get Ashore Vs. Missiles; Reinventing Amphib Assault . breakingdefense.com . Breaking Media, Inc. . 16 April 2014.
  18. http://www.marinecorpstimes.com/article/20140625/NEWS04/306250073/Amos-rejects-recent-critique-amphibious-combat-vehicle Amos rejects recent critique of amphibious combat vehicle
  19. http://www.nationaldefensemagazine.org/blog/lists/posts/post.aspx?ID=1559 Future Marine Corps Missions Depend on New Ship-To-Shore Connectors
  20. Web site: New Details of Austals EPF Hospital Ship Emerge. 5 March 2021.
  21. Web site: Speedy 'Ambulance Ships' a High Priority for Navy Medicine, Admiral Says. military.com. 21 April 2021. 21 April 2021.
  22. Austal USA Engineering Team Recognized by Mobile Area Council of Engineers . Austal USA . 4 February 2022 . 6 February 2022.
  23. Web site: Staff . Naval News . 2023-05-13 . SECNAV Names US Navy's First-in-Class Expeditionary Medical Ship . 2023-05-15 . Naval News . en-US.
  24. Web site: These Speedy New Navy Medical Ships Are Designed with the Pacific in Mind. military.com. 17 January 2023. 18 January 2023.
  25. Web site: Objective Theater Support Vessel (OTSV) . GlobalSecurity . 12 March 2010.
  26. Web site: High Speed Connector (HSC) . GlobalSecurity . 12 March 2010.
  27. Web site: Navy's First Joint High-Speed Vessel Christened . NNS110917-10 . Laura M. . Seal . Navy News Service . US Navy . 17 September 2011 . 23 September 2011 . https://web.archive.org/web/20110924003313/http://www.navy.mil/search/display.asp?story_id=62792 . 24 September 2011 . live.
  28. News: Brumley . Jeff . Unusual ship visits Mayport after 6-month deployment to African waters . . 5 October 2011.
  29. Army Transfers High Speed Vessels to Navy . . 384-11 . 5 May 2011.
  30. Web site: Navy Awards Construction Contracts for JHSV 6, 7 . NNS110701-10 . Navy News Service . US Navy . 1 July 2011 . 28 February 2012 . https://web.archive.org/web/20110713210232/http://www.navy.mil/search/display.asp?story_id=61377 . 13 July 2011 . live.
  31. News: Navy orders more JHSVs from Austal . . 27 February 2012 . 28 February 2012 . https://web.archive.org/web/20120228054222/http://www.upi.com/Business_News/Security-Industry/2012/02/27/Navy-orders-more-JHSVs-from-Austal/UPI-56631330360157/ . 28 February 2012 . live.
  32. News: Navy Exercises Tenth JHSV Construction Option . Marine Log . 20 December 2012 . 21 December 2012 . https://web.archive.org/web/20130116115558/http://www.marinelog.com/index.php?option=com_content&view=article&id=3376:navy-exercises-tenth-jhsv-construction-option&catid=1:latest-news&Itemid=195 . 16 January 2013 .
  33. Web site: LCS council adds new member . Christopher P. . Cavas . Navy Times . 5 April 2013.
  34. News: Military Sealift Command News: CIVMARs To Operate JHSV . Hooper . Craig . 3 June 2014 . nextnavy.com . Craig Hooper . 3 June 2014.
  35. Web site: Navy-Gains-Ship-15-Growlers-Defense-Bill. https://wayback.archive-it.org/all/20141217061225/http://www.defensenews.com/article/20141212/DEFREG/312120029/Navy-Gains-Ship-15-Growlers-Defense-Bill. 17 December 2014. defensenews.com. 12 December 2014. 14 December 2014. dead. (Note: URL has been excluded from the Wayback Machine)
  36. Austal Awarded new A$434 Million US Navy Contract. Austal . 16 September 2016.
  37. Web site: Secretary of the Navy Names Navy's Newest Expeditionary Fast Transport Ship. navy.mil. 13 February 2018. 14 February 2018.
  38. Web site: Navy takes step forward on new Austal transport ship. 19 October 2018.
  39. Web site: U.S. NAVY CONTRACTS AUSTAL TO ORDER MATERIALS FOR EPF 13 . Austal . 18 October 2018 . 16 November 2018.
  40. Web site: U.S. NAVY CONTRACTS AUSTAL TO ORDER MATERIALS FOR EPF 14 . Austal . 3 December 2018 . 4 December 2018.
  41. Web site: AUSTAL AWARDED A$369 MILLION U.S. NAVY CONTRACT. Austal USA . 26 March 2019 . 28 March 2019.
  42. Austal Receives Contract Award for EPF 15 from US Navy . Austal USA . 28 February 2021 . 1 March 2021.
  43. Web site: White. Ryan. A Big Step for US Navy Unmanned Programs: Unmanned EPF Apalachicola - Naval Post. 8 June 2021. 2021-06-09. en-US.
  44. News: Christopher P. . Cavas . JHSV Module Damaged at Ala. Shipyard . https://webarchive.loc.gov/all/20180228040413/https://www.defensenews.com/story.php?i%3D6817725%26c%3DSEA%26s%3DTOP . 28 February 2018 . . 14 June 2011 . 15 June 2011 . dead .
  45. Joint High-Speed Vessels May Answer the Changing Logistics Needs of Navies, Finds Frost & Sullivan . . . 20 May 2013 .
  46. Web site: New Navy Ships Have Trouble Surviving the High Seas. bloomberg.com. 14 January 2016.
  47. Yar! The Navy Is Fixing Its Busted High-Speed Transport Ships. Wired. wired.com. 20 January 2016. 21 April 2021.
  48. http://www.navyrecognition.com/index.php?option=com_content&task=view&id=1889 Austal contract for two 72m High Speed Support Vessels is for the Royal Navy of Oman
  49. http://www.spacewar.com/reports/Austal_launches_Oman_Navy_support_ship_999.html Austal launches Oman Navy support ship
  50. Austal's quick delivery Ships Monthly February 2016 page 14
  51. http://www.austal.com/news/austal-delivers-first-high-speed-support-vessel Austal Delivers First High Speed Support Vessel
  52. Web site: [{{Naval Vessel Register URL|id=EPF1}} Spearhead]. Naval Vessel Register. 18 January 2023.
  53. Web site: [{{Naval Vessel Register URL|id=EPF2}} Choctaw County ]. Naval Vessel Register. 25 August 2016.
  54. Web site: [{{Naval Vessel Register URL|id=EPF3}} Millinocket ]. Naval Vessel Register. 25 August 2016.
  55. Secretary of the Navy Names Joint High Speed Vessel USNS Millinocket . . 438-12 . 30 May 2012.
  56. Web site: Future USNS Millinocket (JHSV 3) completes builder's sea trials . 20 December 2013.
  57. Web site: Fourth Joint High Speed Vessel Named . . 235-10 . 26 March 2010 . 26 March 2010.
  58. Web site: [{{Naval Vessel Register URL|id=EPF4}} Fall River ]. Naval Vessel Register. 24 May 2023.
  59. Web site: [{{Naval Vessel Register URL|id=EPF5}} Trenton ]. Naval Vessel Register. 25 August 2016.
  60. Secretary of the Navy Names Multiple Ships . 12 April 2013 . 237–13 . U.S. Department of Defense . 24 June 2015.
  61. Web site: [{{Naval Vessel Register URL|id=EPF6}} Brunswick ]. Naval Vessel Register. 25 August 2016.
  62. Web site: [{{Naval Vessel Register URL|id=EPF7}} Carson City ]. Naval Vessel Register. 25 August 2016.
  63. Web site: [{{Naval Vessel Register URL|id=EPF_8_4501}} Yuma ]. Naval Vessel Register. 2 June 2017.
  64. Navy Names Multiple Ships . 6 June 2013 . 415–13 . U.S. Department of Defense . 24 June 2015.
  65. Web site: [{{Naval Vessel Register URL|id=EPF9}} City of Bismarck ]. Naval Vessel Register. 25 August 2016.
  66. Navy Accepts Delivery of USNS City of Bismarck. NNS171219-13. U.S. Navy. 19 December 2017. 20 December 2017.
  67. Web site: [{{Naval Vessel Register URL|id=EPF10}} Burlington]. Naval Vessel Register. 2 March 2018.
  68. Navy Accepts Delivery of USNS Burlington . 15 November 2018 . U.S. Navy . 16 November 2018.
  69. Web site: [{{Naval Vessel Register URL|id=EPF11}} Puerto Rico ]. Naval Vessel Register. 25 August 2016.
  70. Navy Marks Milestones for Two Expeditionary Fast Transports . 19 January 2017 . NNS170119-03 . U.S. Navy . 20 January 2017.
  71. Web site: [{{Naval Vessel Register URL|id=EPF12}} Newport]. Naval Vessel Register. 2 March 2018.
  72. Navy Accepts Delivery of USNS Newport . 3 September 2020 . U.S. Navy . 3 September 2020.
  73. Web site: [{{Naval Vessel Register URL|id=EPF13}} Apalachicola ]. Naval Vessel Register. 1 March 2021.
  74. Navy Accepts Delivery of USNS Apalachicola . 16 February 2023 . U.S. Navy . 16 February 2023.
  75. Web site: [{{Naval Vessel Register URL|id=EPF14}} Cody ]. Naval Vessel Register. 17 January 2024.
  76. Web site: [{{Naval Vessel Register URL|id=EPF15}} Point Loma ]. Naval Vessel Register. 22 July 2024.
  77. Web site: [{{Naval Vessel Register URL|id=EPF16}} Lansing ]. Naval Vessel Register. 22 July 2024.
  78. Web site: 2023-10-03 . Austal USA Cuts Aluminum on Final USN EPF . 2023-10-04 . MarineLink . en.
  79. SSECNAV Del Toro Names Navy’s Newest Expeditionary Fast Transport Ship Lansing; Invites Governor of Michigan to Serve as Sponsor. United States Navy. 22 July 2024. 22 July 2024.
  80. Web site: [{{Naval Vessel Register URL|id=EMS1}} Bethesda]. Naval Vessel Register. 22 July 2024.
  81. Austal USA Receives Expeditionary Medical Ship (EMS) Contract Award From U.S. Navy . 21 December 2023. 22 July 2024.
  82. SECNAV Names Navy's First-in-Class Expeditionary Medical Ship after National Naval Medical Center Bethesda. United States Navy. 15 May 2023. 15 May 2023.
  83. Web site: [{{Naval Vessel Register URL|id=EMS2}} Balboa]. Naval Vessel Register. 22 July 2024.
  84. SECNAV Del Toro Names Future Medical Ship USNS Balboa (EMS 2) . Navy Medicine . 27 December 2023 . 6 November 2023.
  85. Web site: [{{Naval Vessel Register URL|id=EMS3}} No Name]. Naval Vessel Register. 22 July 2024.