Hami–Zhengzhou UHVDC Transmission Project | |
Country: | China |
Province: | Yunnan, Guangdong |
Direction: | west-east |
Start: | Hami, Xinjiang |
Through: | Xinjiang, Gansu, Shaanxi, Ningxia, Shanxi and Henan provinces |
Finish: | Zhengzhou, Henan |
Owner: | State Grid Corporation of China |
Operator: | Northwest China Grid Company |
Substation Manufacturer: | ABB |
Construction: | 2012 |
Est: | January 2014 |
Type: | overhead transmission line |
Current Type: | Ultra HVDC |
Length Km: | 2210 |
Capacity: | 8,000 MW |
Dc Voltage: | ±800 kV |
Poles No: | 2 |
The Southern Hami–Zhengzhou UHVDC is an ultra high-voltage direct current power transmission line from the north-west to central China.
It is the first ultra high-voltage project implemented by the Northwest China Grid Company, a subsidiary of the State Grid Corporation of China.[1] Construction started on 13 May 2012. It went into operation in January 2014.[2] Expected cost was 23.4 billion yuan.
The line was designed and built by several different Chinese companies. Converter transformers and components were supplied by ABB Group,[3] by XD Group,[4] and by Siemens AG.[5]
The transmission line starts at the Hami Nanhu converter station next to the Dananhu Power Station in Xinjiang and runs through Xinjiang, Gansu, Shaanxi, Ningxia, Shanxi and Henan provinces to Zhengzhou converter station in Henan.[6] Its total length is . The line operates at ±800 kV voltage and is designed to have a transmission capacity of 8,000 MW, the highest in the world.