South Crofty is a metalliferous tin and copper mine located in the village of Pool, Cornwall, England. An ancient mine, it has seen production for over 400 years, and extends almost two and a half miles across and 3000feet down and has mined over 40 lodes. Evidence of mining activity in South Crofty has been dated back to 1592, with full-scale mining beginning in the mid-17th century. The mine went into serious decline after 1985 and eventually closed in 1998. After several changes of ownership, South Crofty is owned by Cornish Metals Inc, which is working to re-open the mine, as of November 2022,[1] having received a permit for dewatering the mine.

History

South Crofty Mine, at Pool between Camborne and Redruth, is an ancient tin mine. For several centuries its shallow workings exploited copper rather than the deeper tin mineralisation. References implying mining, rather than streaming, occur in the area as early as 1592, and clearly by the mid-17th century mining was well established. During this period part of the mine which today is known as South Crofty was then called Penhellick Vean. The first really significant developments came in 1710 when Francis Bassett obtained a lease of Penhellick Vean and a drainage adit was begun. Over the next twenty years these shallow workings (less than 40m (130feet) deep) produced copper of great value and made the fortune of the Bassett family. Following the opening of the numerous copper mines on Anglesey, which occurred in the 1770-1780 period, most of the mines around South Crofty closed down.

19th century

By 1822, copper ore was being raised at a new mine in the area, East Wheal Crofty, which by 1833 included Penhellick Vean. Mining depths were now or more, and throughout the 1830s a substantial investment was undertaken to improve the mine including a rail link; so much that by 1842 East Wheal Crofty was regarded as a 'model' mine. This state of affairs did not last however, and by 1863 part of the property was for sale. The remainder of the mine, now at least deep, was renamed South Wheal Crofty which, with the deletion of 'Wheal', has been the name ever since.[2]

The mine now faced one of its most far-reaching changes. In the 1860s, South Wheal Crofty was still almost entirely a copper mine but by 1873, after a substantial investment in new dressing machinery, the mine was - financially at least - dependent upon tin. Copper remained significant until 1880, when shallow reserves were exhausted. The mine was now operating at the 260fathom level, where only tin was found. The collapse of the tin price affected South Wheal Crofty both directly (loss of revenue) and indirectly, via increased pumping costs as neighbouring mines closed down. In February 1896 mining was suspended and the mine flooded.

In 1899, further backing was obtained and South Crofty gradually reopened, and acquired the adjacent New Cooks Kitchen mine. Improvements were made in the mine and the deepening of Robinsons Shaft commenced in 1903. The mine returned to profit and in 1906 a new era began, with the incorporation of South Crofty Limited.

20th century

By 1908, the Robinsons Shaft had been sunk to the 205fathom level and work had begun on a second new shaft at New Cooks Kitchen. Increasing use was made of rock drills and, by 1910, the mine operated profitably hoisting 60,000 tons of ore annually. By 1914, the works were down to .[3]

For the next 70 years South Crofty continued to modernise and expand. As nearby mines closed, they were acquired by South Crofty to supplement its ore reserves at depth. The major purchase was of Dolcoath mine in 1936. Ore production, which had not exceeded 75,000 tons a year since 1906, was increased to 92,000 tons in 1959 following improvements in both mine and mill. Production exceeded 100,000 tons in 1968 for the first time.

Black tin production was steady at between 500 and 800 tons a year from 1907 to 1956, excluding a break in production during the tin price slump of the early 1920s. Wolframite and arsenic was also produced at the mine, the former accounting for around 50 tons to 150 tons between 1907 and 1956, and the latter between 500 tons and 1000 tons between 1907 and 1919, declining to 100 tons by 1956.[4]

In 1967, South Crofty Ltd became a wholly owned subsidiary of Siamese Tin Syndicate Ltd and Siamese Tin's subsidiary, St Piran Ltd. This change of ownership was the start, in 1969, of a £1 million programme to increase ore hoisting capacity and to make substantial improvements to the mill. By 1975 the mill was processing more than 200,000 tonnes of ore (including some from Pendarves mine) to yield around 1,500 tonnes of tin concentrate.

In mid-1982, the company was acquired from St Piran by Charter Consolidated, which subsequently disposed of 40% of its holdings to Rio Tinto Zinc (RTZ). These holdings were vested in a new holding company, Wheal Crofty Holdings Ltd, with the same balance of ownership. Then in 1984 RTZ acquired Charter's 60% interest and South Crofty became part of Carnon Consolidated Ltd.

In October 1985, the price of tin dropped dramatically on the world markets following the collapse of the International Tin Agreement. Carnon rationalised the operations, involving closure of the Pendarves mine which had supplied ore to the South Crofty mill. With a diminishing ore supply, this mill was progressively shut and by 1988 all South Crofty ore was trucked for processing at Wheal Jane.

As well as a reduction in manpower, the mines were rationalised and a programme of modernisation, started by RTZ before the price crash, was stepped up. This was made possible by the co-operation and financial support of the Department of Trade and Industry (DTI) in the form of loans for the capital improvement. The majority of this capital was put into the South Crofty mine. In addition, RTZ also provided a loan to fund the operating losses.

Carnon became privately owned in June 1988 when the business and assets of the group were purchased from RTZ through a management buy-out. A trust was established for the benefit of the employees who received twenty per cent of the equity. Carnon Holdings Limited, was incorporated at this time.

In February 1991 the DTI stopped support of capital projects. The company substantially reduced labour costs which coupled with a small rise in the tin price allowed the mine to continue operating at a small loss. The losses were funded through the sale of surplus land and redundant assets. The mine produced about 1,900 tons of black tin in 1993 which was shipped to a smelter in Malaysia. In 1994 South Crofty was purchased by Crew Natural Resources of Canada; at this time the mines' identified and inferred reserves were expected to allow it to continue working for at least ten years. The New Roskear shaft took over from the Robinson Shaft as the secondary access shaft of access.

However, after several more years of depressed tin prices, South Crofty Ltd announced in August 1997 that closure was imminent, and after further attempts at the time to keep the mine open, closure was completed by March 1998.

21st century

In March 2001, a new locally formed company named Baseresult Holdings Ltd. bought the mine with the stated aim of re-opening it.[5] In the same year the company started refurbishment of the New Cooks Kitchen section of the mine. By 2003 an underground refurbishment of the Tuckingmill Decline and Old Engine shaft was under way, and later that year access was mined into New Cooks Kitchen Deep Adit level from the Tuckingmill Decline. The refurbishment of the New Cooks Kitchen section was completed in October 2003 and opened to the public for tours.

In 2004, mining commenced at the 10fathom level drilling a crosscut north from the Tuckingmill Decline to New Cooks Kitchen Shaft. In 2006, equipment from the dormant Wheal Jane processing plant was purchased, and although some of this was outdated, it was planned that some elements would be refurbished at South Crofty to be used in the new mill adjacent to the decline entrance.

Local support for the mine was mixed, although nearly 2,000 people attended an Open Day in support of the mine on 8 July 2006. However others, including local councillor and former miner Mark Kaczmarek, believed that it was time to redevelop the site. A local regeneration company, CPR Regeneration, set up in 2001, actively opposed the reopening of the mine. CPR wished to develop the South Crofty site, initially for a leisure centre, but latterly for a housing and business park. In 2003, 2006, and 2007 CPR threatened Baseresult with a Compulsory Purchase Order of the site.

South Crofty cited the reason for delays in re-commencing mining as the repeated demand by Cornwall Council for Review of Mineral Planning Permissions (ROMPs), which the Council first requested in 2002. After three further reviews submitted by Baseresult in 2002, 2004 and 2005, the Council finally granted permission for the mine in September 2006. One month later CPR Regeneration announced that they would be applying for a Compulsory Purchase Order, and published plans for a multimillion-pound development of 150acres including the South Crofty site. However, by March 2012, CPR Regeneration had ceased operational activity.[6]

In November 2007, a new company named Western United Mines Limited was formed to own and operate the mine. The previous owner of the mine, Baseresult Holdings Ltd. was the majority shareholder of the new company alongside Casserite LP, an investment vehicle acting for Galena Asset Management, a subsidiary of commodity trading company Trafigura. By this time the mine was employing 26 people and total capital investment to re-open the mine was forecast to reach £9 million by June 2008, with the anticipation of its reopening at the end of 2009 after further investment of £50 million. The owners of the mine stated that it had the "potential for a mining life of eighty years".[7] [8]

On 28 November 2007, the owners of the mine successfully challenged the regeneration plan developed by Kerrier District Council for the area around the surface workings. Crofty Developments Ltd., a partner of Western United Mines appealed to the High Court on the basis that it had not been involved in the consultation process.[9]

The price of tin increased from below $4,000/tonne in 2002 to over $17,000/tonne in March 2010,[10] and the economic viability of the South Crofty mine, with identified and inferred reserves of about 50,000 tonnes of tin (in 1994[11]) had improved considerably.

In May 2011, a Canadian company, Celeste Copper Corporation,[12] entered into an earn-in agreement to acquire up to a 100% interest of the property and assets of the mine.[13]

By 2012, the area covered by South Crofty extended over the setts of some 34 former mines,[14] and Celeste Copper Corporation estimated that there were about 7.95 million tonnes of tin in the mine, valued at £1.5 billion ($2.4 billion). The company said it planned to start pumping out the shallower workings in the Dolcoath section in 2013 at a cost of £2.6 million.[15] However, in November 2012, UNESCO called for a halt on work to reopen the mine until "an assessment had been made of the project's impact" because it said it had not been consulted before planning consent was granted in 2011. South Crofty is located within the Cornwall and West Devon Mining Landscape which had been designated as a World Heritage Site by UNESCO in 2006.[16]

In June 2013 the South Crofty site was placed into administration.[17]

In October 2015 a local newspaper again raised the idea that the mine could be reopened.[18]

In March 2016 it was revealed that the Canadian company Strongbow Exploration had acquired, from administration, a 100% interest in the South Crofty Tin Project and associated mineral rights in Cornwall.[19]

In April 2017 Strongbow announced that it has filed an NI 43-101 Technical Report and Preliminary Economic Assessment for the South Crofty mine.[20]

In October 2017, following successful water treatment trials, Strongbow announced that it had received a dewatering permit from the UK Environment Agency allowing the discharge of up to 25,000 cubic metres of treated water per day into the Red River. The granting of this permit means South Crofty is fully permitted to work towards a production decision.[21] By early 2018 the funding was in place for the construction of a water treatment plant with work commencing that spring.[22] Test drilling commenced in June 2020,[23] and the next month Strongbow was renamed as Cornish Metals Inc.[1]

Cornish Wrestling

Cornish wrestling tournaments were held at South Crofty Mine for prizes.[24]

Mineral Statistics

From Robert Hunt's Mineral Statistics of the United Kingdom.[25]

Tin Production (1855-1996)!Year(s)!Black (Tons)!Value (£)
18551.9087.60
18560.3016.00
18570.8056.60
18584.10226.20
1859..204.80
18601.70107.30
18610.8047.60
18621.9093.80
18631.70282.50
18641.30904.30
18652.301,008.40
18661.00227.70
18675.60755.60
18684.801,179.00
18697.402,056.20
187010.703,144.40
187118.006,471.60
187263.607,030.50
1873207.0014,188.80
1874180.308,624.80
1875163.407,182.60
1876144.205,397.30
1877136.601,070.40
1878173.506,120.00
18791.201,346.00
1880..1,138.00
1881117.706,076.00
1882120.306,977.00
1883154.407,505.00
1884169.607,143.00
188591.804,073.00
188699.005,402.00
1887125.307,967.00
1888125.508,248.00
1889122.106,673.00
1890147.408,152.00
1891184.809,900.00
1892203.1011,107.00
1893258.8013,313.00
1894307.0013,148.00
1895251.0010,001.00
189634.001,083.00
1898..72.00
1899..142.00
19004.20306.00
1901158.4010,758.00
1902296.0021,831.00
1903348.6027,341.00
1904275.3020,272.00
1905291.4022,397.00
1906153.8014,606.00
1907228.5022,530.00
1908434.1033,554.00
1908432.00..
1909682.8052,421.00
1909696.00..
1910631.5056,619.00
1910630.00..
1911677.6076,234.00
1911677.00..
1912624.8081,562.00
1912628.00..
1913629.4078,612.00
1913633.00..
1914581.9053,045.00
1914644.00..
1915690.4064,884.00
1915628.00..
1916696.5063,325.00
1916607.00..
1917695.1083,781.00
1917610.00..
1918625.15114,092.00
1918581.00..
1919546.0077,724.00
1919546.00..
1920589.00..
1923406.00..
1924669.00..
1925746.00..
1926694.00..
1927808.00..
1928795.00..
1929795.00..
1930670.00..
1931113.00..
1932645.00..
1933645.00..
1934643.00..
1935673.00..
1936677.00..
1937-1938no-details..
1940no-details..
1941728.00..
1942633.00..
1944711.00..
1945no-details..
1948no-details..
1950no-details..
1961-1969no-details..
19701,110.00..
19711,195.00..
19721,571.00..
1974954.00..
19751,424.00..
19762,200.00..
19771,553.00..
19781,536.00..
1980no-details..
19831,308.00..
19841,817.00..
1985no-details..
19922,044.30..
19932,235.50..
19941,918.70..
19952,304.00..
19962,255.00.
Employment (1878-1996)!Year(s)!Total!Overground!Underground
187820211389
1879652342
1880974552
18811225567
18821496980
18831637192
18841607684
18851014952
18861226656
18871426874
18881316467
18891276265
18901346173
18911456481
18921707496
189322381142
189420075125
18951566888
18961367
18971477
189833..
1899541
1900734825
19011839093
190222697129
1903289126163
1904312123189
1905290118172
1906322144178
1907476222254
1908510240270
1909567240327
1910553221332
1911583207376
1912622242380
1913620245375
1914592....
1914594241353
1915548....
1915548227321
1916525....
1916527229298
1917519....
1917511218293
1918464215249
1918464215249
1919482230252
1919482226256
1920471226245
19211096445
192214410539
1923336171165
1924439217222
1925446222224
1926440213227
1927442207235
1928456207249
1929454207247
1930340170170
19311136944
1932275144131
1933296151145
1934337163174
1935369172197
1936385176209
1937410191219
1938433194239
1940392193199
1941345196149
1942371189182
1943427198229
1944438207231
1945403221182
1948331209122
1950331209122
1975601....
1976677....
1977697....
1978677....
1979677....
1980608....
1981624....
1982590....
1992212....
1993244....
1994275....
1995324....
1996270....

See also

External links

Notes and References

  1. Web site: Cornish Metals – new name for new mining hopes. Cornish Stuff. 2020-07-10. 2022-11-08.
  2. For information on the mines known as East, North and South Wheal Crofty in the 19th century, see T. A. Morrison, Cornwall's Central Mines. The Northern District, 1810-1895 (Penzance: Alison Hodge, 1980), pp. 256-284.
  3. Barton, D. B. (1963) The Mines of West Cornwall, 52 pp.
  4. Dines, H. G. (1956) The Metalliferous Mining Region of South-West England, 326 pp.
  5. News: Tensions over Cornish tin mine's reopening . The Guardian. 2012-12-12. Crace. John . London . 2008-02-13.
  6. Web site: CPR Regeneration: regenerating Camborne, Pool and Redruth in Cornwall. Cprregeneration.co.uk. 2012-12-12.
  7. Web site: NEW MINING COMPANY IS FORMED . South Crofty website . 2 November 2007 . 12 December 2012 . dead . https://web.archive.org/web/20090616094426/http://www.southcrofty.co.uk/html/wum_pr_1.HTM . June 16, 2009 . (archived)
  8. http://news.bbc.co.uk/1/hi/england/cornwall/7074562.stm Tin mine aims to re-open in 2009: BBC News website
  9. Web site: Council faces £100,000 write-off. November 28, 2007. News.bbc.co.uk.
  10. London Metal Exchange Cash Price, LME Price graph for tin
  11. Web site: USGS Tin Mineral Yearbook 1994. Reserve statement. 6. Minerals.usgs.gov. 14 August 2019.
  12. Celeste Copper Corporation is listed on the TSX Venture Exchange in Calgary, Canada. In November 2012 the company changed its name to Celeste Mining Corp.: Web site: Celeste Copper Announces Name Change to Celeste Mining.. 29 November 2012. 2012-12-12.
  13. Web site: Updated Dolcoath Resource Estimation South Crofty Mine. Celeste Copper Corporation. 17. 2012-12-12.
  14. Web site: South Crofty Mine . Western United Mines Limited. 2012-12-12.
  15. News: South Crofty tin valued at '£1.5bn'. BBC News – Cornwall. 2012-12-12. 2012-10-24.
  16. News: Unesco calls for South Crofty mining halt. BBC News. 2012-12-12. 2012-11-05.
  17. News: South Crofty tin mine goes into administration. BBC News. 2013-06-26. 2014-03-16.
  18. Web site: Hopes high that tin mining could resume at South Crofty | Western Morning News . www.westernmorningnews.co.uk . 13 January 2022 . https://web.archive.org/web/20151008131614/http://www.westernmorningnews.co.uk/Hopes-high-tin-mining-resume-South-Crofty/story-27932774-detail/story.html . 8 October 2015 . dead.
  19. Strongbow to Acquire the South Crofty Tin Project, Cornwall, UK. Strongbow Exploration. Inc. March 17, 2016. GlobeNewswire.com. 14 August 2019.
  20. Strongbow Files South Crofty Tin Project NI 43-101 Technical Report and PEA on SEDAR. Strongbow Exploration. Inc. April 3, 2017. GlobeNewswire.com. 14 August 2019.
  21. Strongbow's South Crofty Receives Water Discharge Permit British Tin Project Fully Permitted for Production Decision. Globenewswire.com. 23 October 2017. 18 April 2018.
  22. Web site: STRONGBOW ANNOUNCES CLOSING OF $7.17 MILLION NOTE FINANCING FROM, AND GRANT OF ROYALTY OPTION TO, OSISKO GOLD ROYALTIES. Strongbow Exploration Inc.. 29 January 2018. Cornish Metals.
  23. Web site: Strongbow starts drilling at South Crofty. Cornish Stuff. 2020-06-23. 2020-07-19.
  24. The Cornish Telegraph, 22 August 1907.
  25. Book: Burt . Roger . Mining in Cornwall and Devon: Mines and Men . Burnley . Ray . Gill . Michael . Neill . Alasdair . 2014 . University of Exeter Press . 978-0-85989-889-8 . en.