South Bellevue station explained

South Bellevue
Style:Sound Transit
Type:Link light rail station
Address:2704 Bellevue Way SE
Borough:Bellevue, Washington, U.S.
Coordinates:47.5864°N -122.1903°W
Structure:Elevated
Platform:1 island platform
Tracks:2
Train Operators:Sound Transit
Bus Stands:3
Bus Operators:Sound Transit Express, King County Metro
Bus Routes:4
Parking:1,500 stalls
Owned:Sound Transit
Mapframe:yes
Mapframe-Custom:
Shape:none
Line:none
Marker:rail-light
Zoom:15

South Bellevue station is an elevated light rail station located in Bellevue, Washington, United States, an eastern suburb of Seattle. It opened on April 27, 2024, as the western terminus of the 2 Line of Sound Transit's Link light rail system. The station has a park and ride garage with 1,500 stalls and bus service from King County Metro and Sound Transit Express.

The original park and ride opened on January 30, 1981, with 337 stalls to serve express routes between Downtown Seattle and Bellevue. It had low use for several years, but eventually reached capacity and was expanded to 419 stalls by the late 1990s. South Bellevue was included as the site of a light rail station in various proposals prior to the approval of East Link (now the 2 Line) in 2008. The park and ride lot closed in May 2017 to construction of the light rail station and a parking garage, which opened in 2021. Light rail service began in April 2024 with South Bellevue as the terminus of the initial phase of the 2 Line.

Location

South Bellevue station is situated on the east side of Bellevue Way near its interchange with Interstate 90 south of Downtown Bellevue. The light rail tracks and Bellevue Way form the boundary between the residential neighborhood of Enatai to the west and the Mercer Slough Nature Park to the east.[1] [2] The Mercer Slough includes freshwater wetlands, an education center, walking trails, a boat launch, and a blueberry farm.[3] [4] The town of Beaux Arts Village is located a NaNadj=midNaNadj=mid to the west;[1] the Bellefield office park and historic Frederick W. Winters House are both north of the station site.[5] [6]

According to 2013 data from the Puget Sound Regional Council, the area within NaNmiles of the station has a population of 1,708 people and no recorded jobs. The area is split between single-family homes in Enatai to the west and the protected areas of the Mercer Slough Nature Park to the east.[1] The Enatai neighborhood developed in the 1950s and 1960s using winding streets and landscaping to impede through traffic.[7] The city government's 2016 plan for the station area does not include land use changes for the neighborhood and calls for improved pedestrian and bicycling facilities. A high-occupancy vehicle lane on Bellevue Way is planned to be constructed to connect the station to Interstate 90.[2] The plan also proposed a residential parking zone with issued permits to prevent park-and-ride commuters from using street parking in the neighborhood.[2]

History

Park and ride

Metro Transit, the countywide bus operator for King County, began development of permanent park and ride lots in the 1970s and selected southern Bellevue as one of 18 potential markets.[8] Two sites along Bellevue Way at Southeast 27th Place and Southeast 30th Street were proposed in 1977 by Metro and the Washington State Department of Transportation (WSDOT).[9] The first site, a 12acres farm in the Mercer Slough on the east side of Bellevue Way, was selected for development of a 400-stall park and ride, which was downsized from 630 stalls after a request from the City of Bellevue.[10] The site's selection was criticized by a local community club, who were concerned with additional bus traffic and the aesthetics of the lot amongst farms and wetlands.[10] [11]

The South Bellevue Park & Ride opened on January 30, 1981, with 337 stalls and cost $2.3 million to construct using mitigation funds from the construction of Interstate 90.[12] [13] The lot served existing express routes that connected Bellevue to Downtown Seattle as well as a new route that spanned the entire Interstate 405 corridor from Aurora Village in Shoreline to the Southcenter Mall in Tukwila.[12] By the end of the year, a new turn lane and widened entrance were completed by Metro.[14] South Bellevue was described by The Seattle Times as "one of Metro's most dismal failures in attracting park and ride customers" due to its limited routes. Route 226, a major Seattle–Bellevue express service, was rerouted to South Bellevue in 1982 to encourage more use.[15] In 1983, an average of 39 stalls (11% of capacity) were used daily by commuters; the figure grew to 66 stalls (18%) the following year.[16] In the late 1980s and early 1990s, Metro used the park and ride as a terminus for free "shopper" buses serving the Bellevue Square shopping center and shuttles for major events in Downtown Bellevue and Seattle.[17]

In 1994, King County Metro added 108 stalls to the park and ride, which was regularly filled on weekdays.[18] An additional 50 stalls opened for use in May 1997 and was supplemented by a set of leased spaces at a nearby church parking lot.[19] A parking garage for the South Bellevue lot was proposed during the same time to meet projected demand but faced opposition from Bellevue mayor Ron Smith.[20] By 1999, the lot was used by a daily average of 574 vehicles—over the listed capacity—and drivers resorted to illegally parking along fire lanes or on grass.[21] [22] Metro also proposed repainting the parking lot to fit an additional 50 stalls, but the plan was rejected due to concerns about the width of modern vehicles.[23]

The opening of new park and ride lots in Eastgate and Issaquah in 2004 and 2006, respectively, were expected to ease overcrowding issues at South Bellevue.[24] [25] The South Bellevue park and ride remained filled on weekdays, with 107 percent of its listed 519 stalls used on an average weekday in late 2016.[26] [27] Approximately 44 percent of its users drove 5miles or more to access the lot according to a 2013 survey of recorded license plates.[28] As of 2017, South Bellevue Park and Ride was served by four Sound Transit Express routes and three King County Metro routes with connections to Downtown Seattle, the University District, Overlake, and Issaquah.[29] [30]

Light rail planning

The Forward Thrust plan for rapid transit, which was rejected by voters in 1968 and 1970, included a line from Seattle to Bellevue on the Interstate 90 corridor with a park and ride station serving Enatai.[31] [32] The second iteration of the plan 2.6miles spur line would have split off at Enatai to serve a station at Eastgate with a 1,200-stall parking garage.[33] [34] A light rail plan drafted by Metro and the Puget Sound Council of Governments in 1986 also included a South Bellevue station on its Seattle–Bellevue line, which continued onward to Bothell and Redmond.[35] [36] In 1990, Metro proposed a rapid transit station—either for a busway or light rail system—at the site of the South Bellevue park and ride as part of a long-range plan for Eastside transit.[37]

In 1995, the Regional Transit Authority (now Sound Transit) presented a $6.7 billion ballot measure that included a light rail line connecting Seattle to Bellevue and Overlake with a station serving South Bellevue.[38] [39] The proposal was rejected by voters, but the smaller Sound Move package passed in November 1996 to fund construction of a scaled-back Link light rail system with provisions for future expansions.[40] [41] In 2005, Sound Transit adopted a long-range plan with a designated Seattle–Bellevue–Overlake corridor for high-capacity transit that would use the Interstate 90 floating bridge.[42] A light rail extension was chosen the following year in lieu of a proposed bus rapid transit line, which would have been designed for conversion to rail at a later date.[43] The light rail project, named the East Link Extension, was part of the 2007 Roads and Transit ballot measure that was rejected by voters.[44] [45] A transit-only version of the ballot measure, named Sound Transit 2, was passed the following year with a station in South Bellevue on the Seattle–Overlake line.[46] [47]

The routing of the project's South Bellevue segment, generally between the East Channel Bridge and Main Street in Downtown Bellevue, was debated for several years by city officials and Sound Transit. An at-grade station at South Bellevue was initially endorsed by the city council in February 2009 and adopted by the Sound Transit Board in May with plans to further evaluate its placement.[48] [49] An alternate alignment on the Woodinville Subdivision or near I-405 was proposed in early 2010 by new councilmembers elected in November 2009 with support from Bellevue Square developer Kemper Freeman; the councilmembers in favor of the new alignment held a 4–3 majority.[50] [51] The concept eliminated the South Bellevue station and did not initially provide a replacement;[52] [53] a later version adopted by the city council as their locally preferred alternative in March 2010 included a station at the South Bellevue Way interchange with I-90.[54] [55]

The Sound Transit Board voted to continue analysis of the Bellevue Way routing while the city government prepared their own study of South Bellevue station alternatives that was published in July 2010.[56] [57] The study found that a station at the South Bellevue interchange would cost $170 million to $210 million—more than the baseline cost of $130 million for Sound Transit's alternative—and cause significant impacts to nearby areas, including Mercer Slough.[57] The city council remained split on the South Bellevue alignment until an additional study from the city found a $138 million cost increase.[51] [58] In July 2011, Sound Transit and the city government tentatively agreed to adopt the Bellevue Way and 112th Avenue alignment with additional noise and traffic mitigation for some neighborhoods.[59] The full memorandum of understanding was approved by both parties in November 2011 and the final routing was adopted in April 2013 with several cost-reducing design modifications.[60] [61] A lawsuit filed by residents in South Bellevue over the visual impacts of light rail construction was rejected by a U.S. District Court judge in 2013, allowing for plans to continue.[62]

Light rail design and construction

The first designs for South Bellevue station were released in late 2013; the city government also began planning for future development and construction mitigation around the station.[63] [64] The finalized design for the station, its public artwork, and a five-story parking garage were unveiled in November 2014.[65] As part of the project, Sound Transit also acquired 2acres of Mercer Slough Nature Park from the city government in exchange for additional land near the garage. The agency also paid for the restoration of a produce barn and public restrooms in the park.[6] The construction contract for the South Bellevue section, which comprised the station, 2.2miles of elevated trackway, and the parking garage, was awarded to a joint venture of Shimmick Construction and Parsons for $321 million in October 2016.[66] [67] The section also includes a crossing of the westbound lanes of Interstate 90 that uses a curved, 600feet balanced cantilever bridge built through form-traveler gantries.[68]

Utility relocation near the station area began in June 2016 with the removal of overhead lines by Puget Sound Energy.[69] The South Bellevue park and ride closed on May 30, 2017, for light rail construction at the site. Buses continued to serve Bellevue Way but were moved from the center island to on-street stops.[70] [71] To mitigate the loss of parking, Sound Transit leased 367 stalls from eight churches in Bellevue and Renton, added trips to other express routes, and directed users to other park-and-ride lots with spare capacity.[72] [73] An additional lot opened in January 2018 with 50 more stalls.[74] An earlier plan to build a satellite lot on Mercer Island was rejected following protests from residents who opposed the loss of parkland for the project.[75] A temporary lot was opened south of the station site in July to serve visitors to Mercer Slough Nature Park as part of Sound Transit's construction mitigation plan.[76] [77]

On-site construction began in June 2017 with the preparation of work areas and installation of fencing.[78] [79] The historic Frederick W. Winters House and blueberry farms in Mercer Slough Nature Park closed to visitors in October to prepare for light rail construction along Bellevue Way.[80] Utility relocation was completed in early 2018 and was followed by the start of column construction, which required long-term lane closures on Bellevue Way; the street was arranged to have two lanes open in the peak direction and one lane in each direction during mid-day.[81] The installation of precast concrete girders to support the trackway and platform at the station began in mid-July;[82] the parking garage was constructed in two phases, beginning with the north half in 2018.[83] In 2019, the parking garage was topped out and work on the station's elevators and escalators began;[79] Sound Transit also restored 6acres of wetlands in Mercer Slough Nature Park as part of mitigation for the project.[3] By the end of the year, the South Bellevue contract had reached 77 percent completion and tracks were installed on elevated sections.[84] The traction power substation to power the overhead lines for the light rail vehicles was delivered to the South Bellevue station site in April 2021.[85]

Sound Transit opened the bus loop and 1,500-stall parking garage at South Bellevue station on November 15, 2021, per an agreement with the city government to restore parking capacity sooner.[86] [87] Work continued on trackwork, the station platform, and various communications and electrical systems during the commissioning process.[88] The project reached substantial completion in August 2022; it had originally been scheduled to reach the milestone in January 2021, but was delayed due to the COVID-19 pandemic and a concrete workers' strike.[89] [90] During platform work that began in February 2023, a contractor discovered that the installed floor tiles at the station had come loose and posed a tripping hazard. Sound Transit later found that the tactile edge markers had not been rated for outdoor use and other tiles had buckled in hot weather, requiring full replacement. A $3 million contract was awarded to Balfour Beatty to demolish and replace the platform tiles, which began in September 2023.[91] [92]

Opening

South Bellevue station opened in on April 27, 2024, as the terminus of the 2 Line's initial segment, which runs north to Downtown Bellevue and east to Redmond Technology station.[93] [94] As part of the opening celebrations, the station hosted live music, pop-up exhibits from the Pacific Science Center, and a Port of Seattle firetruck. It was also the terminus of a shuttle to Bellevue Downtown station prior to the ribbon-cutting.[95] The shortened line, made necessary by construction issues on the Seattle–Bellevue section on Interstate 90, was announced in August 2023; the full line is anticipated to open in 2025.[96] Testing on the South Bellevue section began in November 2023.[97] The station is anticipated to have 4,500 daily boardings by 2030.[65]

Station layout

Platform
level
Eastbound 2 Line toward Redmond Technology (East Main)
Eastbound 2 Line toward Redmond Technology (East Main)
Street levelEntrance/Exit, bus bays, park and ride garage

South Bellevue station is located on the east side of Bellevue Way at an intersection with 112th Avenue Southeast, north of the street's interchange with Interstate 90.[6] [98] It includes an elevated light rail station, bus bays, a drop-off parking area, and an adjacent parking garage to the east.[99] The island platform is 35.5feet above street level and connected by a set of stairs, escalators, and elevators with no mezzanine.[100] [101] Two bus bays are located under the north half of the platform and also include layover parking for buses and paratransit vehicles;[102] [103] a third bay is on the northbound side of Bellevue Way.[104] [105] The parking garage is five stories tall and includes 1,500 vehicle stalls; its lower two levels are below street level.[100] Three access roads connect the garage and bus bays to Bellevue Way, including two with signalized intersections.[106] [107] A bicycle locker with 35 spaces is also available at the station.[104]

The station was designed by a joint venture of HNTB, Jacobs, and Mott MacDonald.[99] It features several pieces of public art that was funded by the "STart" program, which allocates a percent of construction costs for artwork.[65] The west side of the platform is shielded by 900feet of metal acoustic panels designed by Vicki Scuri that use repeated hexagonal patterns that reflect the seasonal leaf colors of the Mercer Slough;[65] [108] the northern half uses gold to reflect autumn, while the southern half uses green for spring.[109] The panels are made in Olympia with porcelain enamel on steel panels and are each 6feet tall.[110] [111] Artist Katy Stone designed metal screens for the garage facade that resemble ripples in water and metal sculptures on the garage roof that are inspired by cattails and reeds in the wind.[98] [99]

Services

The first phase of the 2 Line began service on April 27, 2024, with trains every 10 minutes for 16 hours a day on weekdays and weekends from South Bellevue station.[112] [113] During service disruptions, a shuttle bus is operated between 2 Line stations; at South Bellevue, it stops at bus bays 2 and 3.[114]

, the station is served by four bus routes operated by Sound Transit Express and King County Metro.[104] [115] Sound Transit Express routes 550 and 556 provide regional service to Downtown Seattle, Mercer Island, Downtown Bellevue, and the University District.[116] The two King County Metro routes provide local service that connects the station to Beaux Arts Village, Downtown Bellevue, Overlake, Factoria, and Eastgate.[117]

No changes to Sound Transit bus service are planned until the full 2 Line opens in 2025.[118] Sound Transit and King County Metro plan to truncate and restructure several routes around Eastside rail stations in 2025, including redirecting Issaquah's route to Downtown Seattle to instead serve Downtown Bellevue with a stop at South Bellevue station.[119] Several local Metro routes would be extended to South Bellevue station and provide connections to Renton, Newcastle, the Issaquah Highlands, and other parts of Bellevue.[120] [121]

External links

Notes and References

  1. Web site: Growing Transit Communities Oversight Committee . October 2013 . South Bellevue: Future Light Rail/Bus . The Growing Transit Communities Strategy . . dead . https://web.archive.org/web/20160825200805/http://www.psrc.org/assets/10119/South_Bellevue_SAP.pdf . August 25, 2016 . January 22, 2024.
  2. Web site: January 2016 . South Bellevue Station Area Plan . 7, 14–16, 22, 29 . City of Bellevue . January 22, 2024 . September 28, 2023 . https://web.archive.org/web/20230928221204/https://bellevuewa.gov/sites/default/files/media/pdf_document/EL-SouthBvue-StationAreaPlan-Final.pdf . live.
  3. News: Metzger . Katie . April 30, 2019 . Restoring and creating new wildlife habitat along East Link . The Platform . . January 22, 2024 . May 31, 2023 . https://web.archive.org/web/20230531105344/https://www.soundtransit.org/blog/platform/restoring-creating-new-wildlife-habitat-along-east-link . live.
  4. Web site: September 2016 . Mercer Slough Nature Park / Winters House fact sheet . City of Bellevue . January 22, 2024 . November 28, 2023 . https://web.archive.org/web/20231128231047/https://bellevuewa.gov/sites/default/files/media/pdf_document/EL-FactSheetMercSloughWintersHse-Sept2016.pdf . live.
  5. News: Stiles . Marc . August 26, 2016 . Construction will take its toll, but East Link is already a boost to Bellevue 7 years ahead of its launch . . subscription . January 22, 2024 . November 8, 2020 . https://web.archive.org/web/20201108091008/http://www.bizjournals.com/seattle/news/2016/08/26/construction-will-take-its-toll-but-east-link-is.html . live.
  6. News: Thompson . Lynn . August 15, 2016 . Neighbors worry about Mercer Slough amid East Link light-rail construction . A1 . . January 22, 2024 . July 11, 2017 . https://web.archive.org/web/20170711233526/http://www.seattletimes.com/seattle-news/eastside/neighbors-worry-about-mercer-slough-amid-east-link-light-rail-construction/ . live.
  7. News: Gensheimer . Jolene . May 21, 2010 . Enatai: Where the woods meet the water . The Seattle Times . dead . https://web.archive.org/web/20191122095424/http://old.seattletimes.com/html/realestate/2011896990_realneighborhood23.html . November 22, 2019 . January 22, 2024.
  8. News: Watts . Al . January 19, 1977 . Park-and-ride: A Star Is Born—at Last . D10 . Seattle Post-Intelligencer.
  9. News: March 16, 1977 . Hearing next week on Metro park-ride lot . H3 . The Seattle Times.
  10. News: Wilson . Marshall . August 15, 1979 . Pros and cons being weighed for park-and-ride transit log . H9 . The Seattle Times.
  11. News: June 27, 1979 . Group seeks re-evaluation of park-and-ride-lot plan . H3 . The Seattle Times.
  12. News: Wilson . Marshall . February 18, 1981 . Metro tries to break off Bellevue's love affair with car . G7 . The Seattle Times.
  13. November 16, 2021 . South Bellevue park-and-ride garage opens . Sound Transit . January 22, 2024 . September 27, 2023 . https://web.archive.org/web/20230927140829/https://www.soundtransit.org/get-to-know-us/news-events/news-releases/south-bellevue-park-ride-garage-opens . live.
  14. News: September 23, 1981 . Improvement work set for 2 park-and-ride lots . G3 . The Seattle Times.
  15. News: February 17, 1982 . Metro introducing Eastside transit center . F5 . The Seattle Times.
  16. News: Wilson . Marshall . July 18, 1984 . Survey indicates Eastsiders favor light rail transit over buses . F3 . The Seattle Times.
  17. News: Johnston . Steve . September 17, 1997 . Downtown Bellevue's free buses didn't fly . B4 . The Seattle Times.
  18. News: Johnston . Steve . October 24, 1996 . Metro has more riders than parking spaces . B3 . The Seattle Times.
  19. News: May 29, 1997 . More spaces added to park-and-ride lot . B3 . The Seattle Times.
  20. News: Calvan . Bobby . October 16, 1997 . Park-ride expansion ahead . B1 . The Seattle Times.
  21. News: Whitely . Peyton . September 9, 1999 . Fees at park-and-ride lots? One solution suggested to ease overcrowding at lots . B3 . The Seattle Times.
  22. News: Lindblom . Mike . February 21, 2000 . 1,000-car garage proposed for Eastgate park-ride lot . B3 . The Seattle Times.
  23. News: October 5, 1999 . City has ideas about how to handle congestion at Eastgate park & ride lot . B3 . The Seattle Times.
  24. News: Singer . Natalie . June 3, 2004 . Some relief near for I-90 park-and-ride hunt . A1 . The Seattle Times . January 22, 2024 . June 23, 2022 . https://web.archive.org/web/20220623042609/https://archive.seattletimes.com/archive/?date=20040603&slug=eastgate03e . live.
  25. News: Gaudette . Karen . February 8, 2006 . New lots will make it easier to park, ride . B3 . The Seattle Times . January 22, 2024 . November 27, 2022 . https://web.archive.org/web/20221127084950/https://archive.seattletimes.com/archive/?date=20060208&slug=parkers08e . live.
  26. News: Tsong . Nicole . February 21, 2009 . Not all aboard Bellevue Way rail proposal . A1 . The Seattle Times . dead . https://web.archive.org/web/20090430095434/http://seattletimes.nwsource.com/html/localnews/2008768906_bellevuelightrail21m.html . April 30, 2009 . January 22, 2024.
  27. Transit Route Facilities Group . January 2017 . King County Metro Transit Park & Ride Utilization Report, Fourth Quarter 2016 . 14 . King County Metro . January 22, 2024 . August 10, 2022 . https://web.archive.org/web/20220810221526/https://kingcounty.gov/~/media/depts/metro/accountability/reports/2016/2016-par16q4.pdf . live.
  28. Web site: February 2014 . Commuter Parking Needs Analysis Report . 21 . Bellevue Transportation Department . January 22, 2024 . August 12, 2023 . https://web.archive.org/web/20230812074629/https://bellevuewa.gov/sites/default/files/media/pdf_document/2014_2_26_commuterpkg_ver1.pdf . live.
  29. March 2017 . Metro Transit System: Northeast Area . King County Metro . dead . https://web.archive.org/web/20170611021013/http://kingcounty.gov/~/media/depts/transportation/metro/maps/system/03112017/metro-system-map-northeast.pdf . June 11, 2017 . January 22, 2024.
  30. Web site: Park & Ride Information . King County Metro . dead . https://web.archive.org/web/20160828142006/http://metro.kingcounty.gov/tops/parknride/ . August 28, 2016 . January 22, 2024.
  31. News: Conant . Mike . April 23, 1970 . Rapid Transit In a Nutshell . 19 . Seattle Post-Intelligencer.
  32. News: Lane . Bob . April 26, 1970 . Rapid Transit: How It Will Serve . B1 . The Seattle Times.
  33. News: Lane . Bob . April 30, 1970 . Buses Would Fill Time Gap of Rapid Transit . A5 . The Seattle Times.
  34. News: Lane . Bob . January 14, 1970 . Rapid-Transit Planners Find More Money, Restore 3 Sections . D6 . The Seattle Times.
  35. News: Hessburg . John . April 26, 1986 . Panel suggests waiting until 2000 for rail system . A3 . Seattle Post-Intelligencer.
  36. November 1986 . Multi-Corridor Project Summary Report . LRT Trunk Route Schematic . 44 . Municipality of Metropolitan Seattle, Puget Sound Council of Governments . 15608855.
  37. News: Haberstroh . Joe . September 28, 1990 . Metro faces tough transit choices . B3 . The Seattle Times.
  38. News: Schaefer . David . February 12, 1995 . On the right track? Questions, answers to the $6.7 billion proposal . A1 . The Seattle Times.
  39. Web site: February 1995 . The Regional Transit System Proposal: East King County . 5–6 . Central Puget Sound Regional Transit Authority . dead . https://web.archive.org/web/20150930200958/http://www.soundtransit.org/sites/default/files/documents/pdf/projects/planning/1995_plan_subarea_proposals.pdf . September 30, 2015 . January 22, 2024.
  40. News: Schaefer . David . Murakami . Kery . March 15, 1995 . Transit plan derailed: Pierce, Snohomish county voters say no to $6.7 billion proposal . A1 . The Seattle Times . January 22, 2024 . November 9, 2022 . https://web.archive.org/web/20221109085612/https://archive.seattletimes.com/archive/?date=19950315&slug=2110262 . live.
  41. News: Schaefer . David . November 6, 1996 . Voters back transit plan on fourth try . A1 . The Seattle Times . January 22, 2024 . November 30, 2020 . https://web.archive.org/web/20201130202730/https://archive.seattletimes.com/archive/?date=19961106&slug=2358535 . live.
  42. News: Hadley . Jane . July 8, 2005 . Board amends its I-90 plan . B2 . Seattle Post-Intelligencer.
  43. News: Lange . Larry . July 14, 2006 . Light rail chosen to link Seattle, Eastside . A1 . Seattle Post-Intelligencer.
  44. News: Bach . Ashley . October 16, 2007 . Transit package's Eastside benefits debated . B1 . The Seattle Times . dead . https://web.archive.org/web/20180127053029/http://old.seattletimes.com/html/politics/2003952771_elexprop1east16e.html . January 27, 2018 . January 22, 2024.
  45. News: Garber . Andrew . November 7, 2007 . Huge roads-transit plan gets trounced . A1 . The Seattle Times . January 22, 2024 . April 17, 2023 . https://web.archive.org/web/20230417070051/https://archive.seattletimes.com/archive/?date=20071107&slug=elexroadsandtransit07m . live.
  46. Web site: July 2008 . Sound Transit 2, A Mass Transit Guide: The Regional Transit System Plan for Central Puget Sound . 7 . Sound Transit . dead . https://web.archive.org/web/20161202004249/http://www.soundtransit.org/sites/default/files/documents/pdf/st2/transitexapansion/st2_plan_web.pdf . December 2, 2016 . January 22, 2024.
  47. News: Lange . Larry . November 5, 2008 . Sound Transit's package is passing; I-985 falling short . A14 . Seattle Post-Intelligencer . January 22, 2024 . April 16, 2012 . https://web.archive.org/web/20120416181516/http://www.seattlepi.com/local/article/Sound-Transit-s-package-is-passing-I-985-falling-1290519.php . live.
  48. News: Tsong . Nicole . February 25, 2009 . Bellevue envisions tunnel for light rail . B1 . The Seattle Times . dead . https://web.archive.org/web/20190719020454/http://old.seattletimes.com/html/localnews/2008782776_bellevuecouncil25m.html . July 19, 2019 . January 22, 2024.
  49. Web site: May 14, 2009 . Sound Transit Motion No. M2009-41 . Sound Transit . dead . https://web.archive.org/web/20170806101547/https://www.soundtransit.org/sites/default/files/documents/pdf/about/board/motions/2009/Motion_M2009-41.pdf . August 6, 2017 . January 22, 2024.
  50. News: Tsong . Nicole . January 26, 2010 . Bellevue urges new route for light rail . B1 . The Seattle Times.
  51. News: Tsong . Nicole . January 12, 2011 . Light-rail squabble fractures Bellevue council . A1 . The Seattle Times . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123061802/https://www.seattletimes.com/seattle-news/light-rail-fractures-bellevue-council/ . live.
  52. Web site: July 2011 . East Link Project Final Environmental Impact Statement Executive Summary . 26 . Sound Transit . January 22, 2024 . April 8, 2023 . https://web.archive.org/web/20230408152452/https://www.soundtransit.org/sites/default/files/documents/pdf/projects/eastlink/eis_2011/00_executivesummary.pdf . live.
  53. News: Lindblom . Mike . February 8, 2010 . Light-rail 'vision' favors big detour . A1 . The Seattle Times . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123061801/https://www.seattletimes.com/seattle-news/light-rail-vision-elevated-track-would-run-along-i-405/ . live.
  54. News: Hicks . Joshua Adam . March 11, 2010 . Bellevue City Council took messy route changing preference for light rail . Seattle Post-Intelligencer . January 22, 2024.
  55. July 29, 2010 . Bellevue's Preferred East Link Light Rail Route: B7–C9T–D2A . City of Bellevue . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123061802/https://bellevuewa.gov/sites/default/files/media/pdf_document/east_link_preferred_route_102610.pdf . live.
  56. News: Hicks . Joshua Adams . April 22, 2010 . Sound Transit names preferred light-rail routes for Bellevue . Bellevue Reporter . January 22, 2024 . January 14, 2024 . https://web.archive.org/web/20240114060317/https://www.bellevuereporter.com/news/sound-transit-names-preferred-light-rail-routes-for-bellevue/ . live.
  57. Web site: KPFF Consulting Engineers . July 2010 . South Bellevue Station Alternative Location Analysis . 1 . City of Bellevue Transportation Department . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123061803/https://bellevuewa.gov/sites/default/files/media/pdf_document/MOU-SoBvueStationAlternativeLocationAnalysis-KPFF-July2010.pdf . live.
  58. News: Ervin . Keith . July 7, 2011 . Talks aim to end feud over Bellevue light-rail line . B1 . The Seattle Times . dead . https://web.archive.org/web/20110810172404/http://seattletimes.nwsource.com/html/localnews/2015529667_bellevuerail07m.html . August 10, 2011 . January 22, 2024.
  59. News: Ervin . Keith . July 28, 2011 . Sound Transit approves East Link light-rail route . The Seattle Times . dead . https://web.archive.org/web/20180122181626/http://old.seattletimes.com/html/localnews/2015760617_soundtransit29m.html . January 22, 2018 . January 22, 2024.
  60. News: Gutierrez . Scott . November 17, 2011 . Light rail to Bellevue clears final hurdles . Seattle Post-Intelligencer . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123061802/https://www.seattlepi.com/local/transportation/article/Light-rail-to-Bellevue-clears-final-hurdles-2275231.php . live.
  61. News: Lindblom . Mike . April 22, 2013 . In historic step, Bellevue approves light-rail route . B1 . The Seattle Times . dead . https://web.archive.org/web/20160920181523/http://old.seattletimes.com/html/localnews/2020839687_bellevuelightrailxml.html . September 20, 2016 . January 22, 2024.
  62. News: Ervin . Keith . March 15, 2013 . Bellevue, Sound Transit, judge keep light-rail plan on track . The Seattle Times . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123063632/https://www.seattletimes.com/seattle-news/bellevue-sound-transit-judge-keep-light-rail-plan-on-track/ . live.
  63. News: Macz . Brandon . October 21, 2013 . Ad-hoc group to be formed to discuss East Link's South Bellevue Park and Ride improvements . Bellevue Reporter . January 22, 2024 . October 6, 2022 . https://web.archive.org/web/20221006131256/https://www.bellevuereporter.com/news/ad-hoc-group-to-be-formed-to-discuss-east-links-south-bellevue-park-and-ride-improvements/ . live.
  64. News: Macz . Brandon . December 11, 2013 . Council gets update on Bellevue light rail plans . Bellevue Reporter . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123070309/https://www.bellevuereporter.com/news/council-gets-update-on-bellevue-light-rail-plans/ . live.
  65. News: Macz . Brandon . November 11, 2014 . Sound Transit reveals 90-percent design for south Bellevue station . Bellevue Reporter . January 22, 2024 . October 6, 2022 . https://web.archive.org/web/20221006212706/https://www.bellevuereporter.com/news/sound-transit-reveals-90-percent-design-for-south-bellevue-station/ . live.
  66. News: December 7, 2016 . Sound Transit preps for major Bellevue work . Bellevue Reporter . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123064806/https://www.bellevuereporter.com/news/sound-transit-preps-for-major-bellevue-work/ . live.
  67. Web site: October 27, 2016 . Motion No. M2016-100 . Sound Transit . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123061801/https://www.soundtransit.org/st_sharepoint/download/sites/PRDA/FinalRecords/2016/Motion%20M2016-100.pdf . live.
  68. News: Lindblom . Mike . August 22, 2019 . The light-rail bridge being built in south Bellevue seems to soar unsupported over I-90. Here's why. . The Seattle Times . January 22, 2024 . September 28, 2023 . https://web.archive.org/web/20230928113438/https://www.seattletimes.com/seattle-news/transportation/the-light-rail-bridge-being-built-over-i-90-seems-to-hang-in-midair-with-no-support-heres-why/ . live.
  69. News: June 23, 2016 . Project updates: Puget Sound Energy to continue utility work on Bellevue Way this weekend . Sound Transit . January 22, 2024 . February 9, 2024 . https://web.archive.org/web/20240209054646/https://www.soundtransit.org/get-to-know-us/news-events/project-updates/puget-sound-energy-to-continue-utility-work-bellevue-way . live.
  70. News: May 30, 2017 . South Bellevue Park and Ride closed for next 5 years . . January 22, 2024 . November 27, 2022 . https://web.archive.org/web/20221127085054/https://www.kiro7.com/news/eastside-news/south-bellevue-park-and-ride-closed-for-next-5-years/527890520/ . live.
  71. News: April 18, 2017 . South Bellevue Park-and-Ride scheduled to close May 30, 2017 . Sound Transit . January 22, 2024 . November 27, 2022 . https://web.archive.org/web/20221127085037/https://www.soundtransit.org/get-to-know-us/news-events/project-updates/south-bellevue-park-ride-scheduled-to-close-may-30-2017 . live.
  72. News: Lindblom . Mike . May 8, 2017 . Park-and-ride closure in Bellevue: Commuters angry, feeling stranded . A1 . The Seattle Times . January 22, 2024 . August 31, 2017 . https://web.archive.org/web/20170831225321/http://www.seattletimes.com/seattle-news/transportation/huge-park-and-ride-closure-in-bellevue-leaves-angry-commuters-feeling-stranded/ . live.
  73. News: Metzger . Katie . January 5, 2017 . Sound Transit's South Bellevue parking mitigation plan could displace commuters . Bellevue Reporter . January 22, 2024 . January 1, 2024 . https://web.archive.org/web/20240101045255/https://www.bellevuereporter.com/news/sound-transits-south-bellevue-parking-mitigation-plan-could-displace-commuters/ . live.
  74. News: January 2, 2018 . New park-and-ride option in south Bellevue to serve 50 vehicles . Bellevue Reporter . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123044147/https://www.bellevuereporter.com/news/new-park-and-ride-option-in-south-bellevue-to-serve-50-vehicles/ . live.
  75. News: Thompson . Lynn . December 22, 2014 . After Mercer Island uproar, city may abandon parking plan . A1 . The Seattle Times . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123061802/https://www.seattletimes.com/seattle-news/after-mercer-island-uproar-city-may-abandon-parking-plan/ . live.
  76. News: Macz . Brandon . January 28, 2015 . Sound Transit lays out mitigation plans for East Link operations . Bellevue Reporter . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123073314/https://www.bellevuereporter.com/news/sound-transit-lays-out-mitigation-plans-for-east-link-operations/ . live.
  77. News: July 25, 2017 . Project updates: Temporary parking lot to open for Mercer Slough Park users . Sound Transit . January 22, 2024 . February 9, 2024 . https://web.archive.org/web/20240209054701/https://www.soundtransit.org/get-to-know-us/news-events/project-updates/temporary-parking-lot-to-open-mercer-slough-park-users . live.
  78. News: May 30, 2017 . Project updates: South Bellevue Construction Update . Sound Transit . January 22, 2024 . February 9, 2024 . https://web.archive.org/web/20240209054606/https://www.soundtransit.org/get-to-know-us/news-events/project-updates/south-bellevue-construction-update . live.
  79. News: July 22, 2019 . Project updates: Construction progress update (photos!) . Sound Transit . January 22, 2024 . February 9, 2024 . https://web.archive.org/web/20240209054529/https://www.soundtransit.org/get-to-know-us/news-events/project-updates/construction-progress-update-photos . live.
  80. News: September 27, 2016 . Winters House to close Oct. 1 for Sound Transit construction in Bellevue . Bellevue Reporter . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123042645/https://www.bellevuereporter.com/news/winters-house-to-close-oct-1-for-sound-transit-construction-in-bellevue/ . live.
  81. News: April 9, 2018 . Project updates: Bellevue Way SE traffic configurations . Sound Transit . January 22, 2024.
  82. News: July 19, 2018 . Project updates: Nighttime girder installation, weekday construction traffic impacts, and reminder of ongoing closures . Sound Transit . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123041147/https://www.soundtransit.org/get-to-know-us/news-events/project-updates/alert-nighttime-girder-installation-weekday-0 . live.
  83. Web site: July 11, 2019 . Progress Report: Link Light Rail Program, May 2019 . 58 . Sound Transit . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123045811/https://www.soundtransit.org/sites/default/files/documents/may-2019-link-progress-report.pdf . live.
  84. Web site: February 12, 2020 . Agency Progress Report: Capital Programs, December 2019 . 69 . Sound Transit . January 22, 2024 . February 9, 2024 . https://web.archive.org/web/20240209054600/https://www.soundtransit.org/sites/default/files/documents/2019-q4-agency-progress-report.pdf . live.
  85. News: April 6, 2021 . Project updates: Overnight I-90 off ramps to Bellevue Way SE closures . Sound Transit . January 22, 2024 . September 18, 2021 . https://web.archive.org/web/20210918203942/https://www.soundtransit.org/get-to-know-us/news-events/project-updates/overnight-i-90-ramps-to-bellevue-way-se-closures . live.
  86. News: Cunningham . Rachelle . November 15, 2021 . South Bellevue park-and-ride garage opens . The Platform . Sound Transit . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123061801/https://www.soundtransit.org/blog/platform/south-bellevue-park-ride-garage-opens . live.
  87. News: November 16, 2021 . First piece of East Link opens: Bellevue garage . . subscription . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123061801/https://www.djc.com/news/co/12144575.html . live.
  88. Web site: February 4, 2022 . Agency Progress Report: Capital Programs, December 2021 . 35–37 . Sound Transit . January 22, 2024 . February 20, 2022 . https://web.archive.org/web/20220220014618/https://www.soundtransit.org/sites/default/files/documents/agency-progess-report-capital-program-december-2021.pdf . live.
  89. Web site: January 6, 2023 . Agency Progress Report: Capital Programs, November 2022 . 26, 35 . Sound Transit . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123060917/https://www.soundtransit.org/sites/default/files/documents/agency-progress-report-capital-program-november-2022.pdf . live.
  90. Web site: October 5, 2022 . Agency Progress Report: Capital Programs, August 2022 . 36 . Sound Transit . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123060855/https://www.soundtransit.org/sites/default/files/documents/agency-progress-report-capital-program-august-2022.pdf . live.
  91. Web site: November 9, 2023 . Motion No. M2023-102 . 1–2 . Sound Transit . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123060855/https://www.soundtransit.org/st_sharepoint/download/sites/PRDA/FinalRecords/2023/Motion%20M2023-102.pdf . live.
  92. News: Lindblom . Mike . September 20, 2023 . Bellevue light-rail line isn't open yet, but something's already broken . The Seattle Times . January 22, 2024 . September 29, 2023 . https://web.archive.org/web/20230929130700/https://www.seattletimes.com/seattle-news/transportation/south-bellevue-light-rail-isnt-open-yet-but-somethings-already-broken/ . live.
  93. News: Sires . Cameron . April 27, 2024 . Long-awaited Bellevue-to-Redmond light rail line opens for riders . Bellevue Reporter . April 27, 2024.
  94. News: Belman . Brooke . August 24, 2023 . Get ready for new Link service on the Eastside next spring . The Platform . Sound Transit . August 24, 2023 . August 25, 2023 . https://web.archive.org/web/20230825002228/https://www.soundtransit.org/blog/platform/get-ready-new-link-service-eastside-next-spring . live.
  95. News: Sires . Cameron . April 27, 2024 . Long-awaited Bellevue-to-Redmond light rail line opens for riders . Bellevue Reporter . April 27, 2024.
  96. News: Lindblom . Mike . August 24, 2023 . Eastside-only light rail should open in March, Sound Transit says . The Seattle Times . August 24, 2023 . August 24, 2023 . https://web.archive.org/web/20230824234912/https://www.seattletimes.com/seattle-news/transportation/eastside-only-light-rail-should-open-march-2024-sound-transit-says/ . live.
  97. October 31, 2023 . Pre-revenue testing begins Nov. 1 on East Link . Sound Transit . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123062818/https://www.soundtransit.org/get-to-know-us/news-events/news-releases/pre-revenue-testing-begins-nov-1-east-link . live.
  98. Web site: South Bellevue Station FAQs . City of Bellevue . January 23, 2024 . October 3, 2023 . https://web.archive.org/web/20231003080144/https://bellevuewa.gov/city-government/departments/transportation/projects/east-link-light-rail/station-frequently-asked-questions/south-bellevue-station-faqs . live.
  99. News: Minnick . Benjamin . January 25, 2021 . Sound Transit sets fall opening for 1,500-stall south Bellevue garage . Seattle Daily Journal of Commerce . subscription . January 22, 2024 . January 23, 2024 . https://web.archive.org/web/20240123045811/https://www.djc.com/news/co/12137877.html . live.
  100. Web site: Jackson . Matthews . January 21, 2016 . Land Use Division Staff Report: East Link South Bellevue Segment . 13 . City of Bellevue Development Services Department . January 23, 2024 . June 15, 2023 . https://web.archive.org/web/20230615073947/https://bellevuewa.gov/sites/default/files/media/pdf_document/14-134626%20LD%20East%20Link%20South%20Bellevue%20Segment%20Final%20Staff%20Report.pdf . live.
  101. Web site: September 2021 . South Bellevue Station: Vertical circulation . Sound Transit . January 23, 2024 . October 19, 2021 . https://web.archive.org/web/20211019001220/https://oohsteastlinkconnect.blob.core.windows.net/media/Default/maps/03_South%20Bellevue_Vertical_SM.pdf . live.
  102. Web site: Sound Transit . June 20, 2014 . South Bellevue Design & Mitigation Permit Application for East Link Light Rail Project From I-90 to SE 4th Street, including South Bellevue Station . 5 . City of Bellevue . January 23, 2024 . January 23, 2024 . https://web.archive.org/web/20240123082347/https://bellevuewa.gov/sites/default/files/media/pdf_document/EL_LRCAC-App-SouthBvue-DMP-June2014.pdf . live.
  103. Web site: November 2014 . South Bellevue Station – Platform and Grade Level Plans . 11 . Sound Transit . January 23, 2024 . January 23, 2024 . https://web.archive.org/web/20240123084941/https://www.soundtransit.org/sites/default/files/documents/pdf/projects/eastlink/WEB_SoBel_90perc_Nov2014.pdf . live.
  104. Web site: Stops and stations: South Bellevue Station . Sound Transit . January 23, 2024 . February 9, 2024 . https://web.archive.org/web/20240209054647/https://www.soundtransit.org/ride-with-us/stops-stations/south-bellevue-station . live.
  105. News: November 5, 2021 . Routes 550 and 556 will serve South Bellevue Garage starting on Nov. 13 . Sound Transit . GovDelivery . January 23, 2024.
  106. HJH Final Design Partners . November 3, 2014 . East Link: South Bellevue to Overlake Transit Center Final Design, E320 90% Open House Roll Plot . Sound Transit . January 23, 2024 . September 15, 2015 . https://web.archive.org/web/20150915222557/http://www.soundtransit.org/sites/default/files/documents/pdf/projects/eastlink/E320_90pct_Open_House_Roll_Plot_1_03052015_rdced.pdf . live.
  107. February 2014 . South Bellevue Station – Landscape Plan . 9 . Sound Transit . City of Bellevue . January 23, 2024 . June 3, 2023 . https://web.archive.org/web/20230603015722/https://bellevuewa.gov/sites/default/files/media/pdf_document/EL-LRPCAC-PresentationST-E320LandscapeBldgHgts091714.pdf . live.
  108. Web site: System expansion: South Bellevue Station . Sound Transit . January 23, 2024 . February 9, 2024 . https://web.archive.org/web/20240209054715/https://www.soundtransit.org/system-expansion/south-bellevue-station . live.
  109. Web site: Scuri . Vicki . July 7, 2016 . South Bellevue Station: Final Designs . Vicki Scuri Siteworks . January 23, 2024 . January 23, 2024 . https://web.archive.org/web/20240123084056/https://vickiscuri.blog/2016/07/07/south-bellevue-station-final-designs/ . live.
  110. Web site: Scuri . Vicki . South Bellevue Station . . January 23, 2024 . June 8, 2023 . https://web.archive.org/web/20230608152855/https://www.codaworx.com/projects/south-bellevue-station-sound-transit/ . live.
  111. News: Stirling . Shirley . September 8, 2023 . Dofflemyer Point lighthouse history revealed . . January 23, 2024 . September 22, 2023 . https://web.archive.org/web/20230922115424/https://www.thejoltnews.com/stories/dofflemyer-point-lighthouse-history-revealed,12140 . live.
  112. News: Lindblom . Mike . February 15, 2024 . Sound Transit sets a date for Bellevue-Redmond trains . The Seattle Times . February 15, 2024.
  113. News: Lindblom . Mike . April 26, 2024 . Your how-to guide for the new Eastside light rail line . The Seattle Times . April 27, 2024.
  114. Web site: May 24, 2024 . Link Shuttle buses have replaced the 2 Line from South Bellevue Station to Redmond Technology Station until further notice. Updates to follow when available. . Sound Transit . dead . https://web.archive.org/web/20240524182118/https://www.soundtransit.org/ride-with-us/service-alerts/link-shuttle-buses-have-replaced-2-line-south-bellevue-station-to . May 24, 2024 . May 24, 2024.
  115. News: November 5, 2021 . Service alert: ST Express routes 550 and 556 will serve South Bellevue Garage starting on Nov. 13 . Sound Transit . dead . https://web.archive.org/web/20211118173649/https://www.soundtransit.org/ride-with-us/service-alerts/st-express-routes-550-556-will-serve-south-bellevue-garage-starting-nov . November 18, 2021 . January 23, 2024.
  116. September 2023 . Sound Transit current service . Sound Transit . January 23, 2024 . January 28, 2024 . https://web.archive.org/web/20240128213227/https://www.soundtransit.org/sites/default/files/documents/st-current-service-map.pdf . live.
  117. September 2023 . Metro Transit System: Northeast Area . King County Metro . January 23, 2024 . January 23, 2024 . https://web.archive.org/web/20240123091642/https://kingcounty.gov/en/-/media/king-county/depts/metro/maps/system/09022023/metro-system-map-ne . live.
  118. Web site: October 2023 . 2024 Service Plan: Phase One – Rail Service Plan Draft . 18–20, 36 . Sound Transit . January 23, 2024 . February 9, 2024 . https://web.archive.org/web/20240209054602/https://www.soundtransit.org/sites/default/files/documents/2024-service-plan-phase-one-rail-service-plan-draft.pdf . live.
  119. Web site: 2022 . East Link Connections: Sound Transit Express Route 554 – Phase 3 . King County Metro . January 23, 2024 . January 23, 2024 . https://web.archive.org/web/20240123093023/https://kingcounty.gov/en/legacy/depts/transportation/metro/programs-projects/fares-routes-and-service/-/media/depts/metro/programs-projects/link-connections/east-link/route-maps/554.pdf . live.
  120. January 4, 2022 . Phase 3: New Route 203 . King County Metro . January 23, 2024 . January 23, 2024 . https://web.archive.org/web/20240123093024/https://kingcounty.gov/en/legacy/depts/transportation/metro/programs-projects/fares-routes-and-service/-/media/depts/metro/programs-projects/link-connections/east-link/route-maps/203.pdf . live.
  121. February 9, 2022 . Phase 3: Route 240 Current and Proposed Routing . King County Metro . January 23, 2024 . February 9, 2024 . https://web.archive.org/web/20240209055139/https://kingcounty.gov/en/legacy/depts/transportation/metro/programs-projects/fares-routes-and-service/-/media/depts/metro/programs-projects/link-connections/east-link/route-maps/240.pdf . live.