South Attleboro station explained

Style:MBTA
South Attleboro
Address:1315 Newport Avenue
Borough:Attleboro, Massachusetts
Coordinates:41.8976°N -71.3558°W
Line:Attleboro Line (Northeast Corridor)
Connections: GATRA:
RIPTA:
Platform:2 side platforms
Tracks:2
Parking:579 spaces ($6.00 fee)[1]
Bicycle:2 spaces
Passengers:1,144 (weekday average boardings)
Pass Year:2018
Opened:July 30, 1990
Closed:February 26, 2021–May 20, 2024
Accessible:yes
Zone:7
Mapframe:yes

South Attleboro station is an MBTA Commuter Rail Providence/Stoughton Line station in Attleboro, Massachusetts. It is located under Newport Avenue (Route 1A) in the South Attleboro neighborhood, just north of the Rhode Island border. The station has two side platforms serving the two tracks of the Northeast Corridor, formerly connected by a footbridge to a park-and-ride lot; only the north platform is in use.

Construction of the station was approved in 1987 and completed the next year. Opening was delayed by a dispute between the Massachusetts Bay Transportation Authority (MBTA) and the Massachusetts Architectural Access Board (MAAB) because the station was not accessible. After the MBTA and MAAB reached an agreement on the length of accessible platforms, the station opened in July 1990. The footbridge was in poor condition by the 2010s, with two sets of stairs closed off. The MBTA issued a contract for design of station improvements, including a new footbridge with elevators, in 2020. The station was temporarily closed on February 26, 2021, due to structural deterioration. Demolition of the footbridge took place in 2023. The MBTA resumed limited service at the station on May 20, 2024.

Station design

South Attleboro station is located under the Newport Avenue (Route 1A) overpass at the far southern edge of Attleboro, just from the Rhode Island line. The station has two 780feet-long side platforms bracketing the two tracks of the Northeast Corridor; only the north platform is in use. At the west end of the low platforms are 60feet high-level "mini-high" platforms that provide accessible boarding. A footbridge with ramps and stairs formerly connected the south (northbound) platform to the southbound platform and the parking lot on the north side of the tracks. Pre-COVID, the 579-space parking lot filled before the end of the morning peak.

History

Former stations

The Boston and Providence Railroad (B&P) opened a new route from East Junction (near Hebronville in Attleboro) to Providence via Pawtucket in October 1847 to serve a new downtown Providence station.[2] There was no station at the modern site, which was not in a populated area during the 19th century; the nearest stations were at Hebronville to the east and to the west.[3] [4] The B&P was acquired in 1888 by the Old Colony Railroad, which was in turn acquired by the New York, New Haven and Hartford Railroad in 1893. The Massachusetts Bay Transportation Authority (MBTA) was formed in 1964 to subsidize suburban commuter rail operations; the line became the Providence/Stoughton Line. Hebronville closed before the MBTA era, while Pawtucket–Central Falls closed on February 20, 1981 when Rhode Island stopped its subsidies and service was cut back to .

Planning and construction

In August 1987, the MBTA approved plans to build a new station at South Attleboro to relieve crowding at Attleboro station.[5] Commuter service returned to Providence on February 1, 1988, but the Pawtucket/Central Falls station remained closed. The $3 million station was completed in September 1988; however, the Massachusetts Architectural Access Board (MAAB) refused to let the station open. The station did not meet state requirements for accessibility: the footbridge had only stairs and no ramps, and no high-level platforms had been built.[6]

The MBTA built ramps and "mini-high" platforms (short sections of high-level platforms) at an additional cost of $1 million in mid-1989. However, the station remained closed because the MAAB insisted on full-length high-level platforms, while the MBTA wished to only build the cheaper mini-high platforms. The MBTA's appeal of the MAAB ruling (which came two years before the Americans with Disabilities Act mandated accessibility nationwide) had system-wide implications, particularly for the then-inaccessible Green Line.[7]

After a judge ruled in favor of the MBTA, the two agencies reached an agreement in March 1990 under which existing mini-high platforms would be extended to long, and accessible platforms would be installed at all commuter rail stations by 1997 (which did not occur).[8] South Attleboro station ultimately opened on July 30, 1990.[9]

The MBTA began operating Providence– service for events at Gillette Stadium in 1997, with South Attleboro as one of the intermediate stops.[10] [11] South Attleboro station was the southern terminus of regular weekend service on the line until June 29, 2006, when Rhode Island began funding weekend service to .

Reconstruction

In the 2010 Northeast Corridor Master Plan, Amtrak indicated long-term plans to add two outer station sidings and high-level platforms to South Attleboro, allowing Amtrak trains to pass stopped MBTA trains.[12] More immediately, portions of the station were in poor condition, with a 2012 report indicating that two sets of stairs were closed due to rust damage. Although the station had mini-high platforms for level boarding, certain accessible-required elements such as tactile platform edges were missing.[13]

MBTA plans for a $4.9 million renovation, which would not have fixed the footbridge, were criticized by local officials in 2019.[14] That November, $4 million for design of a more extensive renovation was approved by the MBTA Fiscal Management Board.[15] The project will include full-length high-level platforms, a new footbridge with elevators, an improved bus stop, and changes to the parking lot. Design work began in April 2020 and was expected to last 18 months.[16] Some repairs were considered to be made in the interim.[17]

On February 26, 2021, the station was closed due to deterioration of the overpass.[18] By March 2021, the reconstruction was expected to cost $48 million, of which only $7 million had been funded; the existing station was expected to reopen in April.[19] [20] However, in May 2021 the MBTA indicated that the station would remain closed until the reconstruction project was complete.[21] Design reached 75% completion in September 2021 and 100% in April 2022.[22] [23] [24] By January 2023, funding for the station had not yet been approved.[25]

In July 2022, the MBTA indicated that the old footbridge would be removed that fall.[26] Early construction was expected to last through February 2023.[27] However, demolition work did not actually begin until April 17, 2023.[28] Only a small portion was removed before work was paused "due to procedural issues".[29] Demolition work resumed in late September and was completed on October 14.[30] [31]

The MBTA reopened the station with "limited peak-hour service" – three daily round trips using only the north platform – on May 20, 2024.[32] [33]

Bus connections

South Attleboro station is served by three local bus routes, which stop at the Bristol Place shopping center just to the east: Greater Attleboro Taunton Regional Transit Authority (GATRA) routes, and Rhode Island Public Transit Authority (RIPTA) routes .[34] [35]

By federal law, bus systems like RIPTA that receive federal funds usually cannot cross state lines; thus, despite demand, RIPTA previously could not run directly to the station. In 2009, the agency considered building a $300,000 bus turnaround for the 77 (now 1) route just over the Rhode Island border.[36] In 2013, RIPTA began a two-year-long systemwide reorganization; one specific objective of the project was to secure federal permission to run directly to South Attleboro.[37] RIPTA extended routes 1 and 35 to Bristol Place in June 2014.[38] GATRA service to Bristol Place was discontinued prior to 2012 due to low ridership, but resumed in 2015.[39]

External links

Notes and References

  1. Web site: South Attleboro . Massachusetts Bay Transportation Authority . October 12, 2020.
  2. Book: Boston's Commuter Rail: The First 150 Years . Humphrey . Thomas J.. Clark . Norton D. . Boston Street Railway Association . 1985 . 9780685412947 .
  3. Book: New topographical atlas of surveys: Bristol County, Massachusetts . Everts and Richards . 1895 . Town of Attleboro . 92–93 . 2452/206017 . Massachusetts State Archives.
  4. Book: Karr, Ronald Dale . The Rail Lines of Southern New England . 2 . Branch Line Press . 2017 . 9780942147124 . 176.
  5. News: MBTA to build police facility, South Attleboro rail station . Boston Globe . Peter J. . Howe . August 23, 1987 . 34 . Newspapers.com.
  6. News: T pressured to open all routes to accessible . Boston Globe . Jerry . Ackerman . March 8, 1989 . 1, 16 . Newspapers.com. (second page, third page)
  7. News: Forest Hills streetcar service on hold . Boston Globe . Jerry . Ackerman . May 29, 1989 . 18 . Newspapers.com.
  8. News: Accord should improve commuter rail access for the accessible by '97 . Boston Globe . Ronald . Rosenberg . March 31, 1990 . 40 . Newspapers.com.
  9. News: Starts and Stops: Old Colony line inspires a petition duel . Boston Globe . Ronald . Rosenberg . July 30, 1990 . 18 . Newspapers.com.
  10. News: [Advertisement] ]. Boston Globe . October 11, 1996 . 90 . Newspapers.com.
  11. News: If you're going to the game... . Boston Globe . September 14, 1997 . 64 . Newspapers.com.
  12. Web site: The Northeast Corridor Infrastructure Master Plan . Part II: page 7 . Amtrak . May 2010 . The NEC Master Plan Working Group.
  13. Web site: https://web.archive.org/web/20131016051431/http://srpedd.org/transportation/2012-documents/TPLANFINAL/chapter-10.pdf . October 16, 2013 . Commuter Rail . Southeastern Massachusetts Metropolitan Planning Organization and Southeastern Regional Planning and Economic Development District . 2012 . 2012 Regional Transportation Plan.
  14. News: Lawmakers want more repairs to South Attleboro train station . Jim . Hand . The Sun Chronicle . July 31, 2019.
  15. News: MBTA board OK's Attleboro commuter line electrification, South Attleboro Station upgrades . The Sun Chronicle . November 7, 2019 . Mia Ping-Chieh Chen.
  16. Web site: SWA Initiatives—May 2020 . May 26, 2020 . Laura . Brelsford . 8.
  17. News: South Attleboro rail overpass is safe, transportation chief says . Jim . Hand . The Sun Chronicle . January 9, 2020.
  18. Web site: Alerts: Commuter Rail . https://web.archive.org/web/20210108005901/https://www.mbta.com/alerts/commuter-rail . January 8, 2021 . February 26, 2021 . Massachusetts Bay Transportation Authority.
  19. Web site: Accessibility Improvements at South Attleboro Station: 30% Design – Virtual Public Meeting . March 4, 2021 . Massachusetts Bay Transportation Authority.
  20. Web site: Report from the General Manager . March 29, 2021 . Massachusetts Bay Transportation Authority . 19.
  21. Web site: System-Wide Accessibility Initiatives—May 2021 . May 24, 2021 . Laura . Brelsford . Massachusetts Bay Transportation Authority Department of System-Wide Accessibility . 7.
  22. News: Design plans nearing completion for overhaul of South Attleboro train station, official says . The Sun Chronicle . September 30, 2021 . Stella . Lorence . September 30, 2021.
  23. Web site: System-Wide Accessibility Initiatives—December 2021 . December 2021 . Massachusetts Bay Transportation Authority Department of System-Wide Accessibility . 7.
  24. Web site: System-Wide Accessibility Initiatives—May 2022 . May 2022 . Massachusetts Bay Transportation Authority Department of System-Wide Accessibility . 7.
  25. News: South Attleboro commuter rail station project still awaiting funding . Sun Chronicle . January 18, 2023 . George W. . Rhodes . January 23, 2023.
  26. Web site: South Attleboro Station Accessibility Improvements: Prerecorded Overview– 100% Design Update . July 2022 . Nayan . Naidoo . Massachusetts Bay Transportation Authority.
  27. South Attleboro Station Accessibility Improvements Project Construction Work to Take Place beginning This Fall 2022 . August 4, 2022 . Massachusetts Bay Transportation Authority.
  28. News: Demo work to start on dilapidated South Attleboro commuter rail station . George W. . Rhodes . April 16, 2023 . The Sun Chronicle . April 17, 2023.
  29. News: George W. . Rhodes . June 29, 2023 . Work stalls at closed MBTA station in South Attleboro . June 30, 2023 . The Sun Chronicle . en.
  30. News: George W. . Rhodes . September 18, 2023 . Demolition at South Attleboro MBTA commuter rail station now expected to be done by end of October . September 21, 2023 . The Sun Chronicle . en.
  31. News: South Attleboro train station demo done; MBTA looking for funding to rebuild . The Sun Chronicle . November 1, 2023 . George W. . Rhodes . November 25, 2023.
  32. Web site: Spring 2024 Transportation Schedule Changes . April 25, 2024 . Ryan . Coholan . 7 . Massachusetts Bay Transportation Authority.
  33. News: https://web.archive.org/web/20240426045800/https://www.wpri.com/news/local-news/se-mass/mbta-reopening-south-attleboro-train-station/ . April 26, 2024 . MBTA reopening South Attleboro train station . Paige . Messier . April 25, 2024.
  34. Web site: Statewide System Map . 22 April 2020 . Rhode Island Public Transit Authority . October 8, 2020.
  35. Web site: Routes . Greater Attleboro Taunton Regional Transit Authority . September 26, 2023.
  36. News: RIPTA buses may stop near Mass. trains . Providence Business Journal . December 24, 2009 . Barrett, Chris . 3 July 2014 . https://web.archive.org/web/20140703225934/http://www.pbn.com/RIPTA-buses-may-stop-near-Mass-trains,46942 . July 3, 2014.
  37. News: RIPTA prepares to reorganize routes to improve service . Providence Journal . May 21, 2013 . Landis, Bruce . July 8, 2014. https://web.archive.org/web/20190504222909/http://www.providencejournal.com/business/content/20130521-ripta-prepares-to-reorganize-routes-to-improve-service.ece. 4 May 2019.
  38. Book: Public Hearing & Comment Period Report: Rhode Island State Rail Plan . March 13, 2014 . 3 . State Planning Council Transportation Advisory Committee . October 8, 2020 . October 16, 2020 . https://web.archive.org/web/20201016223736/http://www.planning.ri.gov/documents/trans/Rail/Rail_Public_Hearing_Report_3_14.pdf . dead .
  39. News: GATRA shifts to meet needs of customers . March 9, 2016 . The Sun Chronicle . October 7, 2020.