Sonoma–Marin Area Rail Transit Explained

Sonoma–Marin Area Rail Transit
Start:Larkspur
End:Sonoma County Airport (IOS)
Stations:12 (+4 planned)
Daily Ridership:
Ridership2:
Open: (preview service)[1]
(full service)
Event1label:SMART District Established
Event1:2002
Owner:NWP
SMART
Operator:Sonoma–Marin Area Rail Transit District
Depot:SMART Rail Operations Center
Stock:18 Nippon Sharyo DMU
Linelength:45miles (operational)
70miles (mandated)
Tracks:single (85%) with passing sidings[2]
Speed:38.50NaN0 (average)
79mph (top)

Sonoma–Marin Area Rail Transit (SMART) is a rail line and bicycle-pedestrian pathway project in Sonoma and Marin counties of the U.S. state of California. When completed, the entire system will serve a 70miles corridor between Cloverdale in northern Sonoma County and Larkspur Landing in Marin County. In, the system had a ridership of, or about per weekday as of .

The first phase of the system, a 43miles segment between Northern Santa Rosa and downtown San Rafael, opened to public preview and excursion services (as far south as Marin County Civic Center) on June 29, 2017.[3] Regular service began on August 25, 2017, after the Federal Railroad Administration (FRA) gave the final approval for the positive train control (PTC) system.[4] The southern 2miles of the line was completed to Larkspur with service commencing on December 14, 2019.

History

Background and formation

The last passenger rail service along the Northwestern Pacific Railroad south of Willits was discontinued in 1958 as automobile travel along U.S. Route 101 in California increased in popularity.

The SMART District was established by state legislation in 2002.[5] Previously disused station buildings were repaired in anticipation of reestablished rail service in Healdsburg and Windsor, and Cloverdale's depot was constructed in 1998.[6]

Environmental impact report

Mitigation of environmental impacts was studied and summarized in a report issued in June 2006.[7] The recommended remedies, which were certified without challenge, included silencing of some train horns in quiet zones[8] and replacement of certain wetland ditches.

On October 10, 2013, SMART announced that it had obtained more than 56acres of an area in Novato known as the “Mira Monte Marina.” The purpose of this purchase is to restore the area and preserve tidal wetlands and habitat, which is all a part of SMART's environmental mitigation program. According to SMART General Manager Farhad Mansourian, “This will not only address the 2.2acres of project impacts that were determined through the environmental review process for the next stage of construction, but ensures a local source for potential future mitigation needs for the rail and pathway project.”[9]

Funding

The project is funded by federal, state, regional and local allocations including bridge tolls, dedicated sales tax revenues, and fares. The capital cost of track rehabilitation for the full 70-mile line, signals, railcars, etc. was estimated to be about $450 million in 2008 ($ adjusted for inflation). By 2019, development of the line from Airport Boulevard in Santa Rosa to the San Rafael Transit Center totaled $448 million and the estimated cost to complete the legislated system had increased to $944 million.[10]

In November 2006, Measure R, a proposal for funding though an increase in sales taxes, received a combined 65.3% "yes" vote in the two-county District, with 70.1% in favor in Sonoma County and 57.5% in favor in Marin County. Because it lacked the 2/3 supermajority needed for passage, that measure failed.[11]

Measure Q, similar to Measure R, was approved on November 4, 2008. It received a combined vote of 69.5% in the two counties (73.5% approval in Sonoma County and 62.6% in Marin County).[12] It provides funding for the project through a quarter-cent sales tax in both counties set to expire in 2029. This funding was initially thought sufficient to bring the line to completion by 2014. However, the economic downturn reduced the tax base, resulting in a plan to build the project in phases. The tax was expected to generate $890 million over its lifetime; the first decade brought in $289 million, well short of estimates.[13]

In March 2020, SMART went back to the voters with Measure I to extend the sales tax, not scheduled to expire until 2029, for an additional thirty years; the measure ultimately failed.[14]

Bond issues

The SMART Board authorized the sale of bonds in late 2011; proceeds were placed into an escrow account until the effort to repeal the sales tax was resolved.[15]

In May 2012, SMART issued nearly $200 million in bonds to fund construction. The bonds will be paid off with the Measure Q quarter-cent sales tax revenue.[16]

Initial operating segment track rehabilitation

In January 2012, SMART completed final negotiations to start rebuilding the 43miles Initial Operating Segment (IOS) between Airport Blvd Santa Rosa and the Civic Center Station in San Rafael at a cost less than originally budgeted.[17] The segment was completed jointly by Stacy & Witbeck and Herzog Contracting Corp.[18] In 2012, SMART announced that it was adding two stations to the Initial Operation Segment: in north Santa Rosa, near Coddingtown, and in Novato at Atherton Avenue.[19]

The Puerto Suello Hill Tunnel in San Rafael was rehabilitated for service[20] and the 111-year old fixed span Haystack Bridge was replaced with a newer movable bascule bridge. Concrete ties were installed along the line to facilitate running up to and several spur lines were removed to adhere to federal safety standards. Businesses may connect a switch and spur to the line by purchasing the equipment for about $300,000.[21]

The first phase of construction does not include the complete parallel pedestrian and bicycle path.[22]

Delayed start of service

Scheduled passenger service, already delayed from an originally estimated 2014, had long been expected for late 2016.[23] [24] [25] This resulted from lack of tax revenues due to the economic downturn, which also led to the project opening in phases.

As late 2016 approached, the agency further delayed opening the IOS between Northern Santa Rosa and Downtown San Rafael until "late spring 2017."[26] A crankshaft failure on a diesel engine used in the near-identical Nippon Sharyo diesel multiple unit trains operating in Toronto necessitated all of SMART's cars to be recalled for crank replacements, according to SMART management. The agency additionally had been experiencing problems with warning systems at some grade crossings, and had not fully completed its approval process with the Federal Railroad Administration. The 2017 California floods caused damage to the Puerto Suello Hill Tunnel, further delaying testing of the line.[27]

Preview service and excursion trips timed with the Marin County Fair began on June 29, 2017, with free fares as far south as Marin Civic Center. Full service commenced on August 25, 2017.[28]

Larkspur segment

The cost to San Rafael of the Andersen Drive crossing of the Larkspur to San Rafael segment is significant. The street was extended by San Rafael in the mid-1990s to cross the tracks on a "temporary road". In July 1997, the California Public Utilities Commission informed the city that by the time SMART planned to operate on the section, the city had to build and pay for restoring the crossing. The estimated cost for that was $6 million in 2012.[29]

In 2010, the agency received a federal earmark of $2.5 million for technical, environmental and engineering design on the segment. Later in 2010, the revamped California Park Tunnel — 30feet wide, 25feet tall, and 1100feet long — was opened to pedestrian traffic. The revamping was done at a cost of $28 million, paid equally by Marin County and SMART. The tunnel is used both for the rail right of way between Larkspur and San Rafael and by bicycles and pedestrians.

In May 2013, the SMART board approved a resolution designating the San Rafael to Larkspur link as its "preferred alternative". The agency submitted a letter to the Federal Transit Administration, and on September 24, 2013, SMART was accepted into its "Small Starts" program.[30] The FY2016 Federal Budget included the funds to construct the Larkspur Extension under the Small Starts Program.[31] Construction contracts were awarded to a joint venture of Stacy and Witbeck and Herzog Contracting Corporation at a cost of $36.3 million,[32] and work commenced by late 2017 with an expected opening of late 2019.[33] In April 2018, SMART was awarded a $22.5 million federal grant for the extension.[34] Final costs for the extension are estimated to total $55.4 million.[35] Train control and crossing system testing along the extension began in August 2019[36] and was completed by the end of October, whereupon driver training began. Revenue service commenced on December 14, 2019.[37]

Construction of the Novato Downtown station began significantly after work began on the initial operating segment. It was partially constructed by the system's opening, but the station opened with the Larkspur extension.

2019 service disruptions

Service was cancelled on October 28[38] and 29,[39] 2019 due to preemptive power shutoffs affecting crossings throughout the system. Partial service as far north as Downtown Santa Rosa was established on October 30, and the following day full service was restored with free rides offered through November 6 to give transportation options to those affected by the Kincade Fire.[40] According to Farhad Mansourian, the service disruptions had not impacted testing of the Larkspur extension and Downtown Novato station.[41]

Service gaps existed during the weekends of November 2019 between Petaluma to Novato–Hamilton as testing for the Downtown Novato station commenced. A bus bridge was provided from both stations with a transfer at San Marin.[42]

2020–22 operational changes

SMART initiated a schedule with 8 weekday round trips and no weekend service amid the COVID-19 pandemic.[43] [44] The agency planned to only resume 13 round trips on weekdays in an effort to lower costs with reduced ridership and an uncertain tax base. In May 2021, service increased to 13 weekday round trips and 6 Saturday round trips. In September 2021, after receiving $3.2 million in federal stimulus funds, SMART indicated it would restore pre-pandemic schedules in 2022.[45]

In May 2020, the agency acquired control of freight operations along the line from the Northwestern Pacific Railroad. The $4 million purchase of rolling stock, track rights, and other properties was funded by the state.[46] The agency took ownership of freight operations and of trackage north of Healdsburg in July 2021.[47] Sunday service resumed on May 1, 2022.[48]

North of Santa Rosa

By 2018, the 3miles extension was expected to cost $55 million: $20 million from Road Repair and Accountability Act funds, $30 million in Regional Measure 3 funds, and a $5 million federal grant.[49] By November 2019, the cost estimate had increased to $65 million with construction starting in 2020.

The route north of Santa Rosa to Cloverdale was intended to open with the initial segment, but lack of funding delayed this segment. By May 2019, the estimated cost to complete the system to Cloverdale and Healdsburg was $364 million. A letter to the city of Healdsburg in 2020 estimated the cost of reconstructing the Russian River bridge, building a new station, and rehabilitating the line at $32 million.[50] The 2018 California State Rail Plan based its projections on service to Cloverdale station by 2027.[51]

Work on the extension to Windsor, funded by a bridge toll, was temporarily suspended in 2021.[52] The lawsuit was dismissed in January 2023, freeing up $40 million for SMART, and the agency received a $34 million state grant in February.[53] At that time, SMART intended to wait until June 2023 to determine whether it would have sufficient funding to combine a further extension to Healdsburg with the completion of the Windsor extension. If the full $113 million in additional grants is received, Windsor service would begin in 2025 or 2026, and Healdsburg service by 2027.[54] On July 5, 2023, a grant was awarded by the California Transportation Commission, funded by the Road Repair and Accountability Act also known as SB1. This grant awards SMART $30 million to fund extensions to Windsor and Healdsburg.[55]

Expansion

Several services have been envisioned to expand the system. Additional infill stations serving Santa Rosa[56] or Fulton[57] may be added in the future.

In 2019, SMART released a study on the possibility of extending service along SMART (formerly NWP) owned and operated freight tracks between Ignacio and Schellville (near Sonoma), into Napa or Solano counties. Funding for the study was provided by the state in response to chronic flooding along the State Route 37 corridor. Not being member counties of the Sonoma–Marin Area Rail Transit District, a new funding mechanism would have to be established before service commenced. This line would allow the train to connect with the passenger ferry in Vallejo or the Amtrak station in Suisun City.[58], planners expect this rail link to be reactivated for service after 2040,[59] and the 2019 study expected construction time between four and six years. Estimated at $1 billion, work on this link would not begin until after the initial 70-mile system was operational.[60]

Also proposed is extending SMART north beyond Cloverdale to Ukiah or the planned NWP terminus in Willits, where it would connect with the California Western Railroad and its tourist services.[61] A proposal to expand service to the East Bay over a rebuilt Richmond–San Rafael Bridge was named a Finalist in the Transformative Projects Process of the Metropolitan Transportation Commission's Plan Bay Area 2050.[62]

System details

Rail corridor and freight

The SMART District provides passenger service on the historic Northwestern Pacific right-of-way, which roughly parallels US Highway 101[63] and is owned by the SMART District from Healdsburg to Larkspur. There are 24 bridges in the segment from San Rafael to Santa Rosa,[64] as well as 63 at grade crossings (with the possibility of adding more).[65] A positive train control system, as mandated by the FRA for passenger services with grade crossings, was implemented for the length of the service corridor for customer and pedestrian safety.[66]

The Northwestern Pacific Railroad corridor is also used by North Coast Railroad Authority (NCRA) freight services.[67] Freight operator NWP Co began to serve businesses along the SMART right-of-way between Lombard (at the Napa River) and Windsor in 2011.[68] SMART absorbed the NWP operations in 2020.

In December 2014, rains washed away some of the train track beds near Petaluma at Ely Road. A photo of the spot in December showed the tracks hidden beneath feet of water. A spokesperson for SMART said that "Trains are not running yet, so this is something we will pay attention to."[69] In 2021, the agency was awarded a grant to help fund improvements in freight infrastructure, including new sidings and repairing the bridge over the Petaluma River.[70]

SMART acquired 88 miles of right-of-way from NCRA in March 2021, with operating rights transferred on July 26, 2021. NWP continued operating freight service under contract.[71]

Stations

See main article: List of Sonoma–Marin Area Rail Transit stations. Many of the station platforms are located near historic depots in city centers. However, SMART does not directly use these,[72] and all stops use newly constructed 48inches high-floor platforms to allow level boarding onto and off of the train and provide accessibility.[73] A gauntlet track is used at all stations north of the freight interchange at Ignacio to allow freight trains to pass while bringing passenger trains up to the platform edge.[74] Stations typically include a small shelter with a peaked roof and a bench for seating; they also feature light poles, signs, and garbage cans.[75] Original plans called for ten stations in the initial operating segment (IOS) with five more in a second phase. A further station was added in Novato's downtown district late in construction of the IOS,[76] and did not open with the system's inauguration.

Rolling stock

The SMART fleet consists of nine two-car Nippon Sharyo DMU trainsets. Each DMU car is powered by a Cummins QSK19-R diesel engine. The vehicles, designed specifically for SMART and another transit service, the Union Pearson Express in Toronto, Ontario, Canada, are slope-nosed and self-propelled by diesel engines that meet stringent "Tier 4" EPA requirements. For regular service, SMART runs DMUs in pairs or triplicate.[77] Trains may be as long as station platforms provided there are cabs facing the outer ends.[78] Each two-car train has room for over 300 passengers.[79]

The diesel multiple unit trainsets were ordered from Sumitomo Corporation of America / Nippon Sharyo at a cost of $46.7 million, or $6.67 million for each two car set. They were delivered to Rochelle, Illinois, for assembling, and then sent to the Transportation Technology Center in Pueblo, Colorado, for testing. Under the contract, additional railcars may be ordered at a cost of $2.9 million per individual car.[80] The first trainset arrived in Cotati, California, on April 7, 2015.[81] The original order was for fourteen cars in seven two car trainsets, but on July 30, 2015, the state of California announced an $11 million grant to SMART to finance the purchase of three additional cars to be added to the fleet, allowing for three trainsets to be run with three cars, with an increase in capacity of 130 passengers over a two car trainset.[82] [83] In April 2016, SMART's general manager negotiated with CalSTA and Nippon Sharyo to adjust the order so SMART will receive two more full trainsets in place of the extra cars, bringing their fleet size to the required nine trainsets needed for service to Cloverdale. They will be painted in a McGlashan green livery.

A July 2016 fire aboard one of Toronto's Nippon Sharyo units revealed a design flaw in the engine's crankshaft that would result in premature wear; SMART decided to delay operations until the engines could be serviced to correct the problem.[84] All trains were refurbished at SMART's rail center by April 2017.[85]

Four additional cars, numbered 115 through 118, were delivered to SMART in 2018. The four cars were damaged during shipping in a freight collision while en route to SMART. The agency did not accept the cars as delivered, and Nippon Sharyo dispatched a team to California to assess the damage and plan for repairs.[86]

Fleet!Year!Numbers!Model!Notes
2014-2015101-114A/B car
2018115-118A/B cardamaged in delivery

Bicycle and pedestrian pathway

In the original sales tax expenditure plan, $90 million was allocated for a bike/pedestrian path along the line for recreation and to enhance connections between stations and the developing network of bicycle-pedestrian pathways.[87] As a result of the Great Recession of 2008, SMART changed its plans for the construction of the bicycle-pedestrian pathway as well as the rail project. Current SMART pathway construction focuses on bridging gaps between existing bicycle-pedestrian pathways, providing access to stations and serving potential high-use areas.[88] A number of segments are being constructed in partnership with local jurisdictions.[89] For example, SMART has obtained a grant for pathway construction in Rohnert Park and is seeking grants to fund additional segments. As of February 2019, was completed with the majority of funding coming from local jurisdictions.[90]

Operations

Trains operate 19 round trips on weekdays. Southbound service begins at 4:30 A.M. with a final train at 6:37 P.M. while northbound service runs from 6:06 A.M. to 8:29 P.M. There are five round trips on weekends with the first train (southbound) departing at 7:35 A.M. and the final train (northbound) leaving at 6:39 P.M.[91] According to the schedule, a train takes 1 hour 19 minutes to travel the route, an average of . As a Class 4 railroad, passenger speeds are limited to .

Fares

The system operates with fare zones and a proof-of-payment system with the San Francisco Bay-area Clipper card serving as a payment method. Tickets may also be purchased using the SMART eTickets mobile app. There are five zones in the initial opening segment which will expand to seven when service to Cloverdale is established.[92] Zone ticketing requires little infrastructure at the stations but can be expensive for passengers making a short trip that crosses a zone boundary.

Fares start at $1.50 for a ride within one zone, with an additional $1.50 added for entering each new zone. Once a daily fare of $15 is reached (the maximum round-trip fare), no additional fares will be assessed for further travel that day. Transfers from Santa Rosa CityBus, Sonoma County Transit, Petaluma Transit, and Golden Gate Transit will receive a $1.50 reduction in fare per transfer ($0.75 for discounted tickets).[93] A specialty Discount Clipper card or the SMART phone app, can be used for discounted fares of up to 50% for children, senior citizens, low income, and persons with disabilities. The Discounted fare is $0.75 plus $0.75 per zone[94] A monthly pass is also sold for $135 ($67.50 for eligible riders) which grants the bearer 31 days of unlimited travel from the date of first use. A Special Weekender Pass is offered on Saturdays for $10 ($5 for eligible riders) that offers unlimited rides for the day. Parking is $2 daily or $20 for a monthly pass at stations, with no overnight parking.[95]

SMART train service was free of charge during the preview service period and the opening day of full service. After opening day, SMART fares were half price through Labor Day, September 4, 2017. Regular fares were charged beginning on September 5.[96] The October 2017 Northern California wildfires and 2019 California wildfires prompted the agency to provide free limited service for evacuees.

Additional services

Excursion trains may be run for special events, such as the Marin County Fair.[97]

Until 2017, the Sonoma Raceway operated a race-day excursion service that used right-of-way owned by SMART, though not on the mainline tracks and using Amtrak equipment. A minimal platform had been constructed nearby.[98]

Ridership

SMART was the first Bay Area transit agency to match its pre-pandemic ridership; 2023 ridership of 750,016 was 4% above 2019 ridership. However, daily ridership was still below the 5,100 originally projected.[99] As of, weekday ridership was .

Governance

The Sonoma–Marin Area Rail Transit District is a special-purpose district consisting of Sonoma and Marin Counties. The Board of Directors represent the various cities and transit agencies served along the main line. The twelve members consist of:

In January 2011, General Manager Lilian Hames, who had led the project for a decade, resigned amid ongoing concern about the project's financial challenges and the necessity to build it in phases.[100] David Heath, the Chief Financial Officer, took over management duties until the appointment later that year of Farhad Mansourian as acting General Manager. In August 2011, Mansourian was appointed permanent General Manager, assuming both financial and general management responsibilities for the project.[101]

For many years, Mansourian was Director of Public Works for Marin County, and his combined annual compensation from SMART ($346,000) and Marin County pension ($148,000) raised some questions initially.[102] SMART board members said that the threat of a SMART repeal effort made bringing a general manager from an out-of-state rail system to the San Francisco Bay Area even more costly. They concluded that Mansourian's demonstrated abilities during his temporary assignment coupled with his knowledge of California's permitting requirements and successful delivery of complex public works projects in Marin County made him the best candidate.[103]

The official color of SMART is McGlashan green,[104] after former Marin county supervisor Charles McGlashan, a SMART proponent who died suddenly of a heart attack in 2011.[105]

See also

External links

Notes and References

  1. News: Prado. Mark. SMART offers free 'preview' service starting Thursday. June 28, 2017. Marin Independent Journal. June 26, 2017.
  2. News: Arnold. Mike. Marin Voice: SMART's single-track design comes with consequences. December 9, 2016. Marin Independent Journal. December 8, 2016.
  3. Web site: SMART PREVIEW: TAKE A RIDE WITH US. SMART. June 7, 2017 . June 29, 2017.
  4. News: Tips for Riding SMART Train Before Service Begins Aug. 25. Press Democrat. August 17, 2017.
  5. Web site: Assembly Bill 2224. December 5, 2011.
  6. News: Mason. Clark. Cloverdale's vision to link downtown to train depot. 13 June 2016. The Press Democrat. Sonoma Media Investments. 15 July 2010.
  7. Web site: Final Environmental Impact Report: Sonoma-Marin Area Rail Transit . https://web.archive.org/web/20080826013429/http://www.sonomamarintrain.org/index.php/docs/eir/#FEIR . dead . August 26, 2008 . . June 2006 . November 17, 2012 .
  8. Web site: Final Rule on the Use of Locomotive Horns at Highway-Rail Grade Crossings. Federal Railroad Administration. December 5, 2011. dead. https://web.archive.org/web/20111209213708/http://www.fra.dot.gov/rpd/freight/1318.shtml. December 9, 2011.
  9. Web site: SMART to preserve Mira Monte Marina. July 18, 2014.
  10. News: Fixler . Kevin . SMART officials discuss bid to seek sales tax renewal as soon as March 2020 . 29 May 2019 . The Press Democrat . 23 May 2019.
  11. Web site: Sonoma County Ballot Measures . Ballotpedia . July 21, 2014.
  12. News: Jim Doyle. North Bay rail plan OKd, BART extension losing. San Francisco Chronicle. November 6, 2008. December 5, 2011.
  13. News: Fixler . Kevin . SMART takes steps toward building campaign for early sales-tax renewal in March 2020 . 8 July 2019 . The Press Democrat . 6 July 2019.
  14. News: Garofoli . Joe . Marin, Sonoma county voters say no to SMART train tax measure . 4 March 2020 . San Francisco Chronicle . 3 March 2020.
  15. News: Ted Appel. SMART authorizes sale of $191 million in bonds. Press Democrat. November 16, 2011. December 5, 2011. dead. https://web.archive.org/web/20111120004057/http://www.watchsonomacounty.com/2011/11/transportation/smart-authorizes-sale-of-191-million-in-bonds/. November 20, 2011.
  16. News: SMART progresses on several fronts. Press Democrat. May 30, 2012.
  17. Douglas John Bowen. SMART picks contractors for Phase 1 rail start. November 6, 2012. Railway Age. January 6, 2012.
  18. News: Sonoma-Marin Area Rail Transit commuter line opens. September 9, 2017. Metro Report International. August 29, 2017.
  19. News: As other cities add SMART stations . Lois Pearlman . Argus-Courier . January 20, 2012 .
  20. News: Prado. Mark. Puerto Suello Hill Tunnel for commute rail delayed. June 11, 2016. Marin Independent Journal. Digital First Media. March 18, 2015.
  21. News: Brown. Matt. SMART leaves businesses out of loop. June 5, 2017. The Press Democrat. May 20, 2014.
  22. Web site: SMART skips bike path in first phase of construction . Derek Moore . The Press Democrat . January 12, 2012 . April 1, 2012 . dead . https://web.archive.org/web/20120423002210/http://www.watchsonomacounty.com/2012/01/transportation/smart-skips-bike-path-in-first-phase-of-construction/ . April 23, 2012 .
  23. Web site: Smart Train & Pathway Project Overview. February 2016. February 11, 2016. dead. https://web.archive.org/web/20160208052032/http://main.sonomamarintrain.org/wp-content/uploads/2016/02/Project-Overview-Feb-2016-English.pdf. February 8, 2016.
  24. News: Quackenbush. Jeff. Santa Rosa to San Rafael in half-time on SMART. April 16, 2016. The North Bay Business Journal. Sonoma Media Investments. March 25, 2016.
  25. News: Prado. Mark. SMART begins talking rail schedule as service set to begin later this year. April 16, 2016. Marin Independent Journal. April 14, 2016.
  26. Web site: CA: SMART Start to be Delayed Until Late Spring 2017; Engines Being Rebuilt. Mass Transit. October 17, 2016. December 2, 2016. https://web.archive.org/web/20161022184256/http://www.masstransitmag.com/news/12269794/smart-start-to-be-delayed-until-late-spring-2017-engines-being-rebuilt. October 22, 2016.
  27. News: Prado. Mark. Landslide risk in San Rafael halts SMART testing. June 6, 2017. Marin Independent Journal. April 3, 2017.
  28. Web site: Smart Train Service Between Marin, Sonoma County To Start Aug. 25. KPIX 5 CBS San Francisco. August 17, 2017 . CBS Broadcasting, Inc.. August 18, 2017.
  29. News: Dick Spotswood . San Rafael's mistake is keeping SMART from reaching Larkspur . . March 25, 2012 .
  30. News: SMART seeks funding for San Rafael to Larkspur train segment . Marin Independent Journal . Mark Prado . May 20, 2013.
  31. News: Mark Prado. Funding for SMART Larkspur extension in congressional budget. Marin Independent Journal. December 16, 2015. February 11, 2016.
  32. News: SMART TO BEGIN LARKSPUR EXTENSION CONSTRUCTION. June 22, 2017. SMART. June 21, 2017.
  33. News: Prado. Mark. SMART Larkspur extension costs rise as feds demand more money. April 12, 2018. Marin Independent Journal. November 8, 2017.
  34. SMART secures funding from the Federal Transit Administration for the Larkspur extension . Sonoma-Marin Area Rail Transit . April 9, 2018.
  35. News: Fixler . Kevin . Sonoma-Marin commuter train's cost to reach Windsor rises to at least $65M . 11 December 2019 . The Press Democrat . North Bay Business Journal . 18 November 2019.
  36. News: Houck . Kristina . SMART Train To Test New Route To Larkspur . 17 September 2019 . Patch . 21 August 2019.
  37. News: Houston . Will . SMART train service to Larkspur begins Dec. 14 . 5 December 2019 . Marin Independent Journal . 4 December 2019.
  38. Web site: Service Advisory: All Trains Canceled for Monday, October 28 . October 27, 2019 . SMART . 30 October 2019.
  39. Web site: Service Advisory: All Trains Canceled for Tuesday, October 30 . October 28, 2019 . SMART . 30 October 2019.
  40. News: Smart Train Service Running On Limited Schedule Wednesday Through Nov. 6. . October 30, 2019 . Bay City News Service . SFGate . October 29, 2019.
  41. News: Houston . Will . SMART offers free rides as full service returns . 31 October 2019 . Marin Independent Journal . 30 October 2019.
  42. News: Houston . Will . SMART to close stations, sound train horn for Novato testing . 8 November 2019 . Marin Independent Journal . 7 November 2019.
  43. News: SMART Train Expands Cancellations, 4 Weekday Trains Suspended In Coronavirus Response . June 23, 2020 . KPIX . CBS . March 18, 2020.
  44. News: Fixler . Kevin . SMART adopts trimmed budget, approves east side Petaluma station . September 8, 2021 . Press Democrat . June 22, 2020.
  45. News: SMART to restore full train service with $3M stimulus funds . Marin Independent Journal . September 3, 2021 . Will . Houston . September 8, 2021.
  46. News: Houston . Will . CA: SMART to acquire North Bay freight operation . Marin Independent Journal . May 20, 2020.
  47. News: SMART takes ownership of North Bay freight hauling . Marin Independent Journal . July 12, 2021 . Will . Houston . September 8, 2021.
  48. Web site: Schedules . https://web.archive.org/web/20220503235809/https://www.sonomamarintrain.org/schedules-fares . May 3, 2022 . Sonoma–Marin Area Rail Transit . April 28, 2022.
  49. News: SMART to begin work on extension of commuter rail to Windsor. Press Democrat. September 19, 2018. Kevin. Fixler.
  50. News: Fixler . Kevin . SMART to hold listening forum for Healdsburg as north county presses for timeline . 25 September 2020 . Press-Democrat . 22 September 2020.
  51. Web site: 2018 California State Rail Plan (Draft). CalTrans. September 23, 2019. https://web.archive.org/web/20180129160329/https://dot.ca.gov/californiarail/docs/CSRP_PublicReleaseDraft_10112017.pdf. January 29, 2018.
  52. News: Joe . Mathews . How the SMART train is building a new Northern California . San Francisco Chronicle . September 3, 2022 . September 2, 2022 .
  53. Web site: Harden . Olivia . 2023-02-10 . Public transit from SF to wine country is becoming a reality . 2023-02-11 . SFGATE . en-US.
  54. News: SMART receives additional $34 million through state during a week of good news for the passenger train . Andrew . Graham . February 2, 2023 . The Press Democrat.
  55. Web site: Rail News - California awards SMART $30 million to complete two extensions. For Railroad Career Professionals . 2023-07-11 . Progressive Railroading . en.
  56. News: Fixler . Kevin . Supervisors at odds over location of proposed 3rd Santa Rosa SMART station . 17 September 2019 . Press Democrat . 10 September 2019.
  57. News: Supes Approve Study For Another Sonoma County SMART Station . 15 December 2019 . Bay City News . Patch . 9 October 2019.
  58. Web site: 2018 California State Rail Plan (Draft). CalTrans. November 7, 2017.
  59. News: Quackenbush . Gary . SMART train system details roll-out to Windsor, Healdsburg, Cloverdale, Sonoma . November 2, 2018 . North Bay Business Journal . October 30, 2018.
  60. News: Fixler . Kevin . Marin-to-Solano SMART extension estimated at $1B . 7 May 2019 . Marin Independent Journal . 5 May 2019.
  61. Web site: Fixler . Kevin . North Coast trail bill re-imagines SMART rail operations extending into Mendocino County . www.pressdemocrat.com . September 2, 2018 . The Press Democrat . September 21, 2018.
  62. Web site: PROJECT PERFORMANCE ASSESSMENTAttachment B: Finalists from Transformative Projects Process . mtc.ca.gov . METROPOLITAN TRANSPORTATION COMMISSIONASSOCIATION OF BAY AREA GOVERNMENTS . 23 May 2019.
  63. Web site: What is SMART. September 25, 2008.
  64. News: Fimrite. Peter. SMART train launches North Bay preview, but opening still unclear. June 29, 2017. SF Chronicle. June 28, 2017.
  65. News: Santa Rosa's gamble on Coddingtown rail crossing pays off. The Press Democrat. McCallum. Kevin. September 15, 2016. September 19, 2016.
  66. News: SMART Train Looking for a Windsor Stop. June 15, 2016. KSRO. April 14, 2016.
  67. Web site: North Coast Railroad Authority Homepage. October 1, 2008.
  68. Web site: SMART White Paper #14: Freight Trains and Passenger Trains, July, 2008. https://web.archive.org/web/20100613023224/http://sonomamarintrain.org/userfiles/file/14_whitepaper_freight.pdf. dead. June 13, 2010. September 28, 2008.
  69. Web site: Rains expose possible issue along SMART tracks. Freedman. Wayne. December 30, 2014. ABC 7 News. en-US. July 30, 2016.
  70. News: SMART awarded grant for Black Point Rail Bridge project . 10 February 2021 . Progressive Railroading . 5 February 2021.
  71. News: SMART Adds Freight to its Service Mix . Marybeth . Luczak . July 13, 2021 . Railway Age.
  72. News: Brown. Matt. SMART platform designs generate little fanfare. June 10, 2016. The Press Democrat. Sonoma Media Investments. September 23, 2014.
  73. Web site: Mansourian . Farhad . Sonoma–Marin Area Rail Transit District PASSENGER RAIL SERVICE NOVATO TO SUISUN CITY . SMART . 10 May 2019.
  74. Web site: 2019 Strategic Plan . Sonoma-Marin Area Rail Transit . November 2019 . 7.
  75. Web site: SMART settles on more classic station design. February 19, 2015 .
  76. News: Prado. Mark. SMART OKs rail stop in downtown Novato. June 9, 2016. Marin Independent Journal. Digital First Media. April 8, 2016.
  77. News: Morris. J.D.. SMART expands capacity with a three-car train running four round trips daily. December 1, 2017. The Press Democrat. November 29, 2017.
  78. News: SMART passenger seating fails initial safety test . Bob Norberg . . Santa Rosa, CA . February 19, 2013.
  79. Web site: Smart Train Vehicle Fact Sheet .
  80. Web site: SMART Passenger Vehicles . September 21, 2011 . October 30, 2011.
  81. News: Jeffrey Schaub. Sonoma, Marin County Residents Get First Glimpse Of SMART Commuter Train In Cotati. May 26, 2015. KPIX-TV CBS SF Bay Area. April 7, 2015.
  82. News: Guy Kovner . SMART secures $11 million grant to purchase three more rail cars . . June 30, 2015 . February 11, 2016.
  83. SMART obtains funding to purchase three additional cars . Trains Magazine . July 1, 2015 . August 13, 2015.
  84. News: Moore. Derek. SMART spurred by engine failure on Toronto rail car to replace the engine crankshafts on its brand-new cars. October 16, 2016. The Press Democrat. October 14, 2016.
  85. News: Prado. Mark. SMART commuter rail waits for testing perfection before launch. June 30, 2017. Marin Independent Journal. April 5, 2017.
  86. Web site: 2018-11-28 . Four new SMART cars worth $11 million damaged in transport . 2022-10-21 . Marin Independent Journal . en-US.
  87. Web site: SMART White Paper #8: SMART is both Rail and Trail . February 2008 . https://web.archive.org/web/20100613023133/http://www.sonomamarintrain.org/userfiles/file/8_whitepaper_railandtrail.pdf . June 13, 2010.
  88. Web site: SMART Train & Pathway. July 21, 2014.
  89. Web site: Kovner . Guy . 2018-06-10 . North Coast's 'Great Redwood Trail' wins approval in California Senate, but lacks funding . 2023-01-07 . Santa Rosa Press Democrat . en-US.
  90. News: Brown . Matt . SMART eyes new funding for Petaluma bike path extension . February 25, 2019 . Argus–Courrier . Sonoma Index-Tribune . February 18, 2019.
  91. Web site: Schedules . SMART . September 28, 2016 . 9 January 2020.
  92. News: Mark Prado. Mark Prado. SMART to have zoned fares when service begins in 2016. April 25, 2016. Marin Independent Journal. February 22, 2016.
  93. Web site: SMART FARE FACT SHEET. September 28, 2016 . SMART. January 6, 2022.
  94. Web site: SMART FARE FACT SHEET. September 28, 2016 . SMART. January 6, 2022.
  95. News: SMART rail riders will have to pay to park. Prado. Mark. April 18, 2017. Marin Independent Journal. April 7, 2017.
  96. SMART receives final approval. August 18, 2017. SMART. SMART. August 17, 2017.
  97. News: Rodriguez . Adrian . Marin County Fair aims for otherworldy experience . 2 July 2019 . Marin Independent Journal . 24 June 2019.
  98. News: Kovner. Guy. Sonoma Raceway puts brakes on fan train from Central Valley. July 9, 2017. The Press Democrat. June 21, 2017.
  99. News: This is the first Bay Area transit agency to fully recover its 2019 ridership . San Francisco Chronicle . February 16, 2024 . Ricardo . Cano . https://web.archive.org/web/20240216180309/https://www.sfchronicle.com/bayarea/article/transit-transportation-ridership-smart-18665235.php . February 16, 2024.
  100. News: PD Editorial: New SMART . Press Democrat . January 26, 2011 . December 5, 2011.
  101. News: Mark Prado. SMART board OKs plan to seek $171 million in bonds for rail project. Marin Independent Journal. November 16, 2011. December 5, 2011.
  102. News: Dick Spotswood . SMART chief's eye-popping pay package . Marin Independent Journal . September 4, 2011 . December 5, 2011.
  103. News: SMART on pay, hiring of new GM . Judy Arnold . Valerie Brown . Press Democrat . September 3, 2011 . December 5, 2011.
  104. News: Brown. Matt. New rail bridge spans Petaluma River. June 6, 2017. Argus Courioer. December 17, 2015.
  105. News: Supervisor Charles McGlashan dies at 49 after ski weekend at Tahoe. April 22, 2018. en.