Songshan–Xindian line explained

Songshan–Xindian line
Other Name:Green line
Mapcolor:Green
Type:Rapid transit
Locale:Taipei and New Taipei, Taiwan
End:,
Stations:20
Routes:
Open:
  • (Guting–CKS Memorial Hall)
  • (Xindian–Guting)
  • (CKS Memorial Hall–Ximen)
  • (Ximen–Songshan)
Operator:Taipei Rapid Transit Corporation
Character:Underground
Depot:Xindian
Stock:
Linelength:21.51NaN1
Tracks:2
Speed:80km/h
Map State:collapsed

The Songshan–Xindian or Green line (code G) is a metro line in Taipei operated by Taipei Metro, named after the districts it connects: Songshan and Xindian. Parts of the line runs under the Roosevelt Road, following the route of the former Xindian (Hsintien) railway line, which ceased service in 1965 on its southern section.

History

Tianshui Road station

Initial plans for the line originally called for another station between and stations (at Chien-Cheng Circle). However, the Circle was suffering from economic concerns, as well as engineering feasibility and effectiveness problems. Coupled with problems with landowners regarding joint developments and two of the entrances/exits, plans for the station were shelved on 1 May 2007.[5] The station would have been a five-level underground station with stacked, split platforms.[6]

Construction of Songshan section

It was originally estimated that its opening would take place in 2013.[7]

Shield tunneling was used to construct most of the tunnels on the line, except for a few locations.[8] Tunneling beneath Dacheng St. crosses existing Taiwan Railway Administration and Taiwan High Speed Rail tunnels. Common utility ducts were constructed in sync with the Metro line, carrying water pipes, gas pipes, and cables.[9] Over 200 homes were demolished or relocated to make way for Metro land use.[10]

Construction of the line was divided into three civil engineering section contracts and one electrical/mechanical system-wide contract.[11] The contract for construction on the eastern end of the line (including and) was awarded to Da Cin Construction Co., Ltd. on 2 March 2006.[12] The 3.02km (01.88miles)-long section includes a crossover section, a tail-track work shaft, and three shield tunnels. Construction of the line was completed in late 2014.

In 2008, steel price increases threatened to delay construction plans due to the price doubling over the previous two years.[13] The Ministry of Economic Affairs ordered that exports of other steel products be strictly supervised to ensure a steady local supply and to keep prices down.

Taipei Workshop, a 3rd level historical monument constructed during the era of Japanese rule, was exactly where the proposed station would be located. Thus, a temporary removal project commenced on 20 October 2006 to move the structure until construction of both the Songshan Line and the Taoyuan International Airport MRT are completed.[14] [15] The building moved 30 meters to the southeast, and moved back when construction is completed.[16]

Services

As of December 2017, the typical off-peak service is:

Soundscape

Chopin's Nocturne in E-flat major, Op. 9, No. 2 is played at metro platforms every time a train arrives on the Songshan–Xindian line.[17] [18]

Stations

Services ! rowspan="2"
CodeStation NameTravel time to previous station (s)[19] Stop time at station (s)Date openedTransfersDistrictsCity
MBEnglishChinese
Chinese: 新店251999-11-11XindianNew Taipei
Chinese: 新店區公所111251999-11-11
Chinese: 七張78251999-11-11
Chinese: 小碧潭2032004-09-29
Chinese: 大坪林75251999-11-11
Chinese: 景美89251999-11-11WenshanTaipei
Chinese: 萬隆87251999-11-11
Chinese: 公館119401999-11-11Zhongzheng, Da'an
Chinese: 台電大樓67401999-11-11
Chinese: 古亭88401998-12-24
Chinese: 中正紀念堂83401998-12-24 (constructing)Zhongzheng
Chinese: 小南門75402000-08-31
Chinese: 西門81402000-08-31Wanhua, Zhongzheng
Chinese: 北門75302014-11-15Datong
Chinese: 中山114352014-11-15Zhongshan, Datong
Chinese: 松江南京106352014-11-15Zhongshan
Chinese: 南京復興92352014-11-15Songshan, Zhongshan
Chinese: 臺北小巨蛋84302014-11-15Songshan
Chinese: 南京三民102302014-11-15
Chinese: 松山1382014-11-15

See also

Notes and References

  1. News: Construction of new Taipei MRT line gets under way. The China Post. 2006-08-20. 2010-07-01. 2012-09-22. https://web.archive.org/web/20120922035643/http://www.chinapost.com.tw/taiwan/detail.asp?ID=88348&GRP=B. live.
  2. Web site: 挖到大樓地錨 捷運松山線停擺. 自由時報. 2009-01-10. 2009-12-06. 2009-02-13. https://web.archive.org/web/20090213104737/http://libertytimes.com.tw/2009/new/jan/10/today-taipei10.htm. live.
  3. Web site: 松山線挖到地錨 環亞段施工暫停. 公視新聞網. 2009-12-06.
  4. Web site: 臺北捷運松山線施工挖到環亞百貨大樓地錨捷運局強調不影響松山線通車時程. 臺北市政府捷運工程局中區工程處新聞稿. 2009-01-14. 2011-07-31. 2011-09-27. https://web.archive.org/web/20110927125129/http://www.ptt.cc/bbs/MRT/M.1232098969.A.186.html. dead.
  5. Web site: 松山線規劃現況. 2011-05-17. 2010-07-31. 2011-10-03. https://web.archive.org/web/20111003213302/http://www.dorts.gov.tw/ct.asp?xItem=661042&CtNode=20271&mp=115001. live.
  6. Web site: 捷運松山線 CG590A 公開閱覽訊息. 2011-07-31.
  7. Web site: Taipei Metro Network: Green line . Department of Rapid Transit Systems, Taipei City Government . 2008-11-06 . 2010-11-29 . 2010-04-26 . https://web.archive.org/web/20100426153104/http://www2.dorts.gov.tw/english/Network/frame_line_g.htm . live .
  8. Web site: 捷運系統松山線簡介 . Department of Rapid Transit Systems, Taipei City Government . 2010-09-01 . 2010-11-29 . dead . https://web.archive.org/web/20131203031720/http://www.dorts.gov.tw/public/Attachment/0102516231531.pdf . 2013-12-03 .
  9. Web site: 捷運松山線共同管道設計. Department of Rapid Transit Systems. 2008-08-01. 2010-06-19. 2010-09-23. https://web.archive.org/web/20100923111647/http://www2.dorts.gov.tw/news/newsletter/ns246/rp246_08.htm. live.
  10. Web site: 捷運松山線工程用地地上物拆遷作業. Department of Rapid Transit Systems. 2009-02-01. 2010-06-19. 2010-01-14. https://web.archive.org/web/20100114161954/http://www2.dorts.gov.tw/news/newsletter/ns252/rp252_04.htm. live.
  11. Web site: 工程線上 Status Report: 捷運松山線工程特色. Department of Rapid Transit Systems. 2006-11-01. 2010-06-19. 2013-09-21. https://web.archive.org/web/20130921060953/http://www2.dorts.gov.tw/news/newsletter/ns225/rp225_03.htm. dead.
  12. Web site: 捷運松山線CG590C區段標工程簽約. Department of Rapid Transit Systems. 2006-05-01. 2010-06-19. 2009-01-05. https://web.archive.org/web/20090105235854/http://www.dorts.gov.tw/news/newsletter/ns219/rp219_11.htm. live.
  13. Web site: Rising steel prices to delay work on new MRT lines. Steel Guru. 2008-03-06. 2010-07-01.
  14. Web site: 工程線上 Status Report: 松山線北門站臺北工場古蹟挪移工程. Department of Rapid Transit Systems. 2006-12-01. 2010-06-19. 2009-01-06. https://web.archive.org/web/20090106001323/http://www.dorts.gov.tw/news/newsletter/ns226/rp226_03.htm. live.
  15. Web site: 松山線北門站臺北工場古蹟挪移工程施工前之舊地坪及基礎探挖. Department of Rapid Transit Systems. 2007-02-01. 2010-06-19. 2009-01-05. https://web.archive.org/web/20090105234313/http://www.dorts.gov.tw/news/newsletter/ns228/rp228_11.htm. live.
  16. Web site: 工程線上 Status Report: 松山線北門站臺北工場古蹟挪移工程. Department of Rapid Transit Systems. 2008-01-01. 2010-06-19. 2009-01-06. https://web.archive.org/web/20090106012909/http://www.dorts.gov.tw/news/newsletter/ns239/rp239_03.htm. live.
  17. Web site: Editorial . IISMA Alumni Club . Classical Music in Taiwan’s Daily Life . Medium . 2023-08-09 . 2024-04-23.
  18. Web site: Taipei MRT welcomes commuters with an audio feast . Department of Cultural Affairs . 2016-04-26 . 2024-04-23.
  19. Web site: 臺北捷運系統相鄰兩站間之行駛時間、停靠站時間 政府資料開放平臺. data.gov.tw. zh. 4 October 2019. 7 October 2019. https://web.archive.org/web/20191007145554/https://data.gov.tw/dataset/61792. live.