Simberi Island is a volcanic island in the Tabar Group, in Papua New Guinea's New Ireland Province.[1]

Geography and geology

Simberi is the northernmost and smallest of the three islands in the Tabar Group. The island is about 9km (06miles) long and 7km (04miles) wide and has an area of about 40km2. Its highest point in the highlands on the eastern side of the island is a 340m (1,120feet) eroded volcanic cone. The interior of the island is largely covered by rainforest. Most of the island's coast is steep and surrounded by a fringing reef together with a series of small islets. There is a woman shaped figure made by trees on the island and a barrier reef about 10km (10miles) offshore from the west coast. A 2adj=onNaNadj=on strait separates Simberi from Tatau Island to the south west.

Simberi island is a potassium rich (high-K) calc-alkaline island arc volcano, the oldest in the Pliocene to Holocene Tabar-Lihir-Tanga-Feni (TLTF) volcanic arc that formed above a subduction zone.[2] [3]

People

The population is about 1100 and made up of nine clans who live in small coastal villages mainly in the north and west.[1] The local language is a Simberi dialect of Mandara (also known as Tabar), ISO 639-3 language code "tbf", an Austronesian language spoken on the Tabar Islands.[4] [5]

Transport

The island has an airport, Simberi Airport (IATA airport code "NIS"), on the south east coast.[6]

Simberi Oxide Gold Project

See main article: Simberi mine. St Barbara Limited, an Australian-based company, operate an open pit gold (and silver) mine called the Simberi Oxide Gold Project in the volcanic highlands on the eastern side of the island.[1] The mine is wholly owned and operated by St Barbara Limited, who acquired the assets of Allied Gold, the previous operators of the Simberi mine, on 31 August 2012.[1] Gold production started in February 2008.[1] Mining was suspended in December 2009 after Allied Gold received a cease work order from the Mineral Resources Authority of Papua New Guinea because of local landholder issues.[1] Mining has since recommenced.[1]

Seven gold deposits have been defined in mining lease 136 (ML 136), which covers the central and eastern portion of Simberi Island, and other prospects have been identified.[1] [6] The gold deposits occur mainly on ridge tops and are all within NaNkm (-2,147,483,648miles) of each other.[1] [6] Sorowar in the north is the largest resource while Samat North, South and East to the south are relatively small but relatively high grade.[6] Pigiput, Pigibo and Botlu South lie between the Sorowar and Samat areas and are of intermediate tonnage but at a grade similar to Sorowar.[6] The western area of Simberi Island within exploration license EL 609 is largely unexplored.[7] Reconnaissance exploration for both oxide and sulphide mineralisation is planned.[7]

As of June 2009, Allied reported that the total resources were 4.7lk=inNaNlk=in (Moz) gold, being oxide gold resources of 1.4e6ozt and sulphide gold resources of 4.7e6ozt together with 10.2e6ozt silver.[6]

Ore is delivered to the processing facilities on the eastern coast near Pigiput Bay by a 2665abbr=onNaNabbr=on RopeCon aerial conveyor that can deliver of ore per hour.[1] [8] The process plant is a conventional carbon-in-leach (CIL) gold process plant capable of treating 2.2e6t of ore per year.[6] In September 2010, Allied announced that it planned to increase its gold production to per year.[7] The oxide processing circuit at the Simberi operation will be expanded to 3.5e6t a year, by June 2013.[9]

Mine tailings are disposed of in the form of a slurry that has been pre-diluted with seawater using a deep sea tailings pipeline.[1] The pipeline is 528m (1,732feet) long with the discharge point at a depth of 130m (430feet). The tailings flow down a steep submarine slope and are deposited at a depth of more than 3km (02miles).[6]

Production for the period from 1 July 2009 to 30 June 2010 was .[10] In June 2009, Allied reported that the remaining mine life was estimated to be over 10 years.[6] St Barbara Limited (Australia) acquired Allied in September 2012 and is the current owner of this mining operation.[11] They are the largest employer on the island.[6]

Notes and References

  1. Web site: Simberi. Mineral Policy Institute. 9 September 2010. dead. https://web.archive.org/web/20110216143051/http://www.mpi.org.au/simberi.aspx. 16 February 2011.
  2. McInnes. Brent I.A.. Eion M. Cameron . March 1994. Carbonated, alkaline hybridizing melts from a sub-arc environment: Mantle wedge samples from the Tabar-Lihir-Tanga-Feni arc, Papua New Guinea. Earth and Planetary Science Letters. Elsevier B.V.. 122. 1–2. 125–141. 10.1016/0012-821X(94)90055-8. 1994E&PSL.122..125M.
  3. Book: McInnes, Brent I.A.. A glimpse of ephemeral subduction zone processes from Simberi Island, Papua New Guinea. Thesis (Ph.D.) . 1992. University of Ottawa (Canada).
  4. Web site: Ethnologue: Languages of the World – Mandara. Lewis. M. Paul. SIL International. 17 September 2010.
  5. Book: Brown. Keith . Encyclopedia of Language & Linguistics. 2006. Elsevier. 978-0-08-044854-1. i.
  6. Web site: Allied Gold Annual Report 2009. Allied Gold. 10 September 2010. dead. https://web.archive.org/web/20110217045105/http://alliedgold.com.au/site_cms/assets/files/2009_Annual_Report.pdf. 17 February 2011.
  7. Web site: Allied Gold approves $32m gold expansion at PNG mine. Swanepoel. Esmarie. 2010-09-15. Mining Weekly. 15 September 2010.
  8. Web site: RPC RopeCon Simberi. Doppelmayr. 16 September 2010.
  9. Web site: Pacific Operations FY13 Guidance. SBM. 20 December 2012.
  10. Web site: APPENDIX 4E: PRELIMINARY FINAL REPORT 2010. 2010-06-30. Allied Gold. 15 September 2010. dead. https://web.archive.org/web/20110217025704/http://alliedgold.com.au/site_cms/assets/File/Preliminary-Final-Report-30082010.pdf. 17 February 2011.
  11. Web site: Simberi. St Barbara Limited.