Silver State South Solar Project | |
Country: | United States |
Location: | Clark County |
Coordinates: | 35.6103°N -115.335°W |
Owner: | NextEra Energy Resources |
Status: | O |
Construction Began: | September 3, 2014 |
Commissioned: | December 9, 2016 |
Solar Type: | Flat-panel PV single-axis tracking |
Ps Site Area: | 2900acres |
Ps Electrical Cap Fac: | 31.6% (average 2017-2019) |
Ps Annual Generation: | 692 GW·h, 239 MW·h/acre |
The Silver State South Solar Project is a 250 megawatt (MWAC) photovoltaic power plant located in Clark County, Nevada, and near the previously completed 50 MWAC Silver State North Solar Project and the 530 MW gas-fired Higgins Generating Station. The project was completed in late 2016 and was constructed by subcontractors for First Solar.[1] [2] The plant is owned and operated by a subsidiary of NextEra Energy Resources, and power is being sold to Southern California Edison.[3]
The project occupies approximately 2,900 acres of public lands[4] and is located adjacent to Primm, Nevada, in the Jean Lake/Roach Lake Special Recreation Management Area (SRMA).[5]
Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Total | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2015 | 384 | 8,211 | 8,595 | |||||||||||
2016 | 13,533 | 23,351 | 29,167 | 45,956 | 62,921 | 61,971 | 66,962 | 71,718 | 63,439 | 51,756 | 39,479 | 28,335 | 558,588 | |
2017 | 29,556 | 32,848 | 56,693 | 62,421 | 69,859 | 73,677 | 71,278 | 78,328 | 73,826 | 71,825 | 46,787 | 44,062 | 711,159 | |
2018 | 33,729 | 43,256 | 55,401 | 69,164 | 73,144 | 85,662 | 72,966 | 73,783 | 70,975 | 55,643 | 43,498 | 33,672 | 710,894 | |
2019 | 34,522 | 37,774 | 52,251 | 61,824 | 65,523 | 72,168 | 72,876 | 70,959 | 60,663 | 58,888 | 40,185 | 27,138 | 654,772 | |
Average Annual Production (years 2017-2019) ---> | 692,275 |