Sihuangziping Pilot Geothermal Power Plant | |
Name Official: | 四磺子坪先導地熱發電廠 |
Location: | Jinshan, New Taipei, Taiwan |
Status: | UC |
Commissioned: | October 2023 |
Ps Electrical Capacity: | 1 MW |
Ps Annual Generation: | 6.4 GWh |
The Sihuangziping Pilot Geothermal Power Plant is an upcoming geothermal power plant in Jinshan District, New Taipei, Taiwan. It is the first power plant in Taiwan powered by a volcano.
The power plant will be commissioned by the end of October 2023.[1]
The power plant received its energy sources from Tatun Volcanic Group. It has an installed capacity of 1 MW and can generate 6.4 GWh of electricity per year.[1]