The Wolverhampton–Shrewsbury line is the railway line from Wolverhampton to Shrewsbury via Wellington; it was originally built by the Shrewsbury and Birmingham Railway. The line is double track throughout, with rarely used relief sidings at Cosford and four tracks through Wellington station.

Electrification from Stafford Road Junction to Oxley, is provided solely to enable electric stock to access Alstom's Oxley TRSMD, and is therefore constructed as a "trolley wire" suitable for low speeds only.[1]

Signalling was centred in the panel box at Madeley Junction until 2012,[2] but following the closure of the box there, the West Midlands Signalling Centre at Saltley has taken control of most of the route via its Oxley/Telford Workstation. Previously, Oxley signal box controlled the depot access and sidings until it closed on 27 November 2010 under the West Midlands Resignalling scheme. Towards Shrewsbury, Abbey Foregate signal box takes over for the last few miles beyond Wellington.

The line also had a service to Walsall which ran to Wellington via Wolverhampton, but this service was cutback to Wolverhampton, and then eventually withdrawn altogether.

History

See main article: Shrewsbury and Birmingham Railway. The line was opened by the Shrewsbury and Birmingham Railway (S&BR) in 1849, which merged with the Great Western Railway (GWR) in 1854. In GWR days, until the 1960s it formed part of an important main line route from to . The line historically ran into the GWRs Wolverhampton Low Level railway station, before the latter was closed to passenger services in 1972, it now runs into the nearby former High Level Wolverhampton railway station.[3]

Telford Central railway station was opened on the line by British Rail in 1986, to serve the new town of Telford, which had grown up along its route since the late-1960s.

Route

The towns and villages served by the route are listed below, East to West.

The map includes the former GWR Madeley Branch[4] which formed a connection from Madeley Junction to the Wellington to Craven Arms Railway at Lightmoor Junction.

Passenger services

Transport for Wales and West Midlands Trains operate passenger trains on this line. Westbound, some trains go beyond to,,, and while eastbound, all services continue beyond to and/or .[5]

West Midlands Trains operate two services per hour in each direction on the line; alternating half-hourly between a stopping service calling at all local stations to Wolverhampton before continuing to Birmingham New Street via and a semi-fast service calling at,,, and .[6] These services are operated using British Rail Class 196 Diesel multiple units, which were introduced into service in late 2022 and early 2023 following the withdrawal of DMUs.

Transport for Wales Rail operate one service per hour in each direction on the line; this service calls at and only before continuing to Birmingham International eastbound or to,,, or when heading westbound. These services are typically operated using the DMUs but sometimes use or DMUs.

Former services

From December 2014 to June 2024, Avanti West Coast (formerly Virgin Trains) ran a daily return services between Shrewsbury and London Euston calling at Wellington and Telford Central. These services were operated using DEMUs.[7]

Freight

The Coalbrookdale line, which served Ironbridge Power Station to the south of Telford near Ironbridge, joined the Wolverhampton–Shrewsbury line at Madeley Junction, which is between Telford Central and Shifnal stations.[8] Coal trains ran by EWS up to 2012 and by Fastline up to 2010[9] used the route, supplying the power station. Between 2012 and 2015, the power station was converted to run on biomass which was supplied mostly via Liverpool Docks by GBRf trains until closure of the plant in November 2015.[10]

In 2008 the former Wellington to Stafford line was rebuilt as far as Donnington, for freight use. Telford International Railfreight Park is located at a 48acres site just off the Hortonwood Roundabout near Donnington which opened in 2009. The reopened line is single track and runs for 2chain68chain from the junction with the Wolverhampton–Shrewsbury line at Wellington (east of Wellington station). Currently the only rail business to and from the site is Ministry of Defence traffic[11] which runs down from Warrington so only uses a brief portion of the line between Shrewsbury and Wellington.[12]

See also

External links

Notes and References

  1. Slater. J N. Trolley wire for sidings. The Railway Magazine. January 1972. 118. 849. 42. Transport Press. London. 0033-8923.
  2. http://forum.signalbox.org/viewtopic.php?f=5&t=4579 "Madeley Junction"
  3. Christiansen, Rex (1983). A Regional History of the Railways of Great Britain, Volume 7 The West Midlands. David St John Thomas David & Charles. .
  4. Ordnance Survey Map Shropshire XLIII.11, Revised: 1901, Published: 1902
  5. GB eNRT May 2019 Edition, Table 74 & 75
  6. Web site: Train times Shrewsbury to Birmingham New Street 2 June 2024 until 14 December 2024. West Midlands Railway.
  7. Web site: Page. Tim. Direct rail service to London to end. 21 February 2024. 21 February 2024. BBC News.
  8. Book: Bridge. Mike. Railway Track Diagrams – Midland and North West. 2013. Trackmaps. Bradford-on-Avon. 978-0-9549866-7-4. 21.
  9. Book: Buck. Martin. Loco Review 2011. 2010. Freightmaster Publishing. Swindon. 978-0-9558275-4-9. 26.
  10. Shannon. Paul. Feeding the nations power stations. Rail Magazine. 20 January 2016. 792. 49.
  11. Shannon. Paul. On government business. Railways Illustrated. December 2013. 11. 12. 84. 1479-2230.
  12. Rawlinson. Mark. Freighmaster 80. Freightmaster. November 2015. 80. 75. 904391334.