Shin-Tōmei Expressway Explained

Country:JPN
Type:Expressway
Route:Shin-Tōmei
Alternate Name: 新東名高速道路
Map Custom:yes
Length Km:253.2
Length Round:1
Length Ref:[1]
Established:2012

The, literally meaning New Tōmei, is a national expressway in Japan running parallel to the Tomei Expressway as an alternate route. It is operated by Central Nippon Expressway Company. The expressway is also numbered E1A, E52 and E69 under the "2016 Proposal for Realization of Expressway Numbering".[2]

Shin-Tōmei Expressway provides a more direct and shorter route between Tokyo and Nagoya compared to the Tōmei Expressway and avoids most city centres along the way. Its western terminus connects with Isewangan Expressway in Nagoya.

History

Shin-Tōmei Expressway was partially opened on April 14, 2012 with 162 km section from Gotemba, Shizuoka to Mikkabi, Hamamatsu, Shizuoka.

On February 13, 2016, the 55 km section connecting with the eastern terminus of Isewangan Expressway in Nagoya to Mikkabi was opened.

On January 28, 2018, the outer circumferential highway of Tokyo, the Ken-Ō Expressway, was linked with the Shin-Tōmei Expressway in Ebina, Kanagawa.

On March 7, 2019, the Shin Tomei Expressway between the Atsugi Minami IC and the Isehara JCT was opened to traffic.

On March 15, 2020, a 3 km section between the Isehara JCT and the Isehara-Oyama IC was opened to traffic.

On April 10, 2021, the section between the Gotemba JCT and the Shin Gotemba IC was opened to traffic.

On April 16, 2022, a 13 km section between the Isehara-Oyama IC and the Shin Hadano IC was opened to traffic, but the 25 km section between the Shin Gotemba IC and the Shin Hadano IC is still under construction.

Future

The section between Shin Gotemba IC and Shin Hadano IC is still under construction and slated to open in 2027. Once completed, Shin-Tōmei offers direct connection between Osaka, Nagoya and Tokyo through Isewangan Expressway and the Shin-Meishin Expressway. The entire cost for the project from Tokyo to Osaka is 7 trillion yen (around 50 billion dollars).

List of interchanges and features

Shin-Tōmei Expressway route

No.NameConnectionsDist. from
Origin
Bus StopNotesLocation
Through to Daini-Tōkai Expressway (planned)
1Ebina-minami JCT0.0EbinaKanagawa
2Atsugi-minami IC National Route 1291.5Atsugi
5-1Isehara JCT Tōmei Expressway5.8Nagoya-bound only Isehara
3Pref. Route 603 (Kamikasuya Atsugi Route)
Atsugi-Hadano Road
8.2
3-1Pref. Route 705 (Horiyamashita Hadano Station Route)
Atsugi-Hadano Road (Planned)
17.9Service Area Under Construction Hadano
4 National Route 246
Atsugi-Hadano Road (Planned)
21.0
4-1Pref. Route 76 (Yamakita Fujino Route)33.0Opening In 2027Yamakita
4-2Access To Fuji Speedway43.7OyamaShizuoka
5 National Route 138 (Gotemba Bypass)
Pref. Route 406 (Hitosugi Shibanta Route)
46.2Gotemba
7-1Gotemba JCT Tōmei Expressway53.3Tokyo-bound only
6Nagaizumi-Numazu ICPref. Route 87 (Ōoka Motonagakubo Route)
Izu-Jūkan Expressway
66.5Nagaizumi
6-1Surugawan-Numazu SA/
SIC
Pref. Route 22 (Mishima Fuji Route)72.0Numazu
7Shin-Fuji IC Nishi-Fuji Road
Pref. Route 88 (Isshiki Kuzawa Route)
86.8Fuji
8Shin-Shimizu IC National Route 52101.2Shimizu-ku, Shizuoka
PAShimizu PA103.2
9Shin-Shimizu JCT110.6
10Shin-Shizuoka ICPref. Route 27 (Ikawako Miyuki Route)
Pref. Route 74 (Yamawaki Ōya Route)
119.8Aoi-ku, Shizuoka
10-1Shizuoka SA/
SIC
Pref. Route 209 (Shizuoka Asahina Fujieda Route)131.0
11Fujieda-Okabe IC National Route 1
Pref. Route 209 (Shizuoka Asahina Fujieda Route)
Pref. Route 81 (Yaizu Mori Route)
138.4Fujieda
PAFujieda PA141.3
12Shimada-Kanaya IC National Route 473
Kanaya-Omaezaki Connecting Road (Planned)
153.4Shimada
PAKakegawa PA161.0Kakegawa
13Mori-Kakegawa ICPref. Route 40 (Kakegawa Tenryū Route)170.3Mori
13-1Enshū-Morimachi PA/
SIC
Pref. Route 40 (Kakegawa Tenryū Route)173.7
13-2Shin-Iwata SIC178.1Iwata
14Hamamatsu-Hamakita IC National Route 152182.4Hamana-ku, Hamamatsu
14-1Hamamatsu SA/
SIC
Pref. Route 68 (Hamakita Mikkabi Route)188.5
15Hamamatsu-Inasa JCT198.0
16Shinshiro IC National Route 151210.4ShinshiroAichi
PANagashino-Shitaragahara PA213.3(↓)
212.8(↑)
17Okazaki-higashi IC National Route 473 (Okazaki-Nukata Bypass)236.5Okazaki
SAOkazaki SA250.3
1Toyota-higashi JCT Tōkai-Kanjō Expressway253.2Toyota
Through to Isewangan Expressway

Shimizu Connection Route

  • Located in Shimizu-ku, Shizuoka
No.NameConnectionsDist. from
Shimizu JCT
Notes
9-2Shimizu JCT Tōmei Expressway0.0
9-1Shimizu-Ihara ICPref. Route 75 (Shimizu Fujinomiya Route)1.8
9Shin-Shimizu JCT Shin-Tōmei Expressway Main Route4.5
Through to Chūbu-Ōdan Expressway

Inasa Connection Route

  • Located in Kita-ku, Hamamatsu
No.NameConnectionsDist. from
Mikkabi JCT
Notes
Through to San-en Ise Connection Route (planned)
17-1Mikkabi JCT Tōmei Expressway0.0
15-1Hamamatsu-Inasa IC National Route 25711.0
15Hamamatsu-Inasa JCT Shin-Tōmei Expressway Main Route12.7
Through to San-en Nanshin Expressway

External links

34.9906°N 138.2985°W

Notes and References

  1. Web site: Road Timetable . Ministry of Land, Infrastructure and Transport . 2008-05-20 .
  2. Web site: Japan's Expressway Numbering System. www.mlit.go.jp . 9 March 2018.