Shin-shimizu Tunnel explained

See also: Shimizu Tunnel.

Shin-shimizu Railway Tunnel
Line:Joetsu Line
Location:Yuzawa, NiigataMinakami, Gunma
Opened:1967
Status:active
Traffic:Railway
Operator:East Japan Railway Company
Character:Passenger and freight
Linelength:13500m (44,300feet)
Notrack:1

is one way tunnel towards Niigata on JR's Joetsu Line located between Yuzawa town in Niigata Prefecture and Minakami town in Gunma Prefecture in parallel to other one-way Shimizu Tunnel (towards Tokyo) with total length of 13.500 km. It was built and completed in 1967 under Mount Tanigawa that has 3 railway-tunnels: single-tract Shin-shimizu & Shimizu tunnels for Joetsu Line, and double-tracts Daishimizu Tunnel for Joetsu Shinkansen line.[1] [2] [3] [4] A distinctive station known as Doai Station features a platform situated within an underground tunnel, specifically positioned within the middle of the Shin-Shimizu Tunnel. [5]

See also

External links

Notes and References

  1. Web site: 大清水トンネル . 2023-10-22 . www.kajima.co.jp . ja.
  2. Web site: List of railway tunnels in Japan. 22 October 2023.
  3. Web site: 新清水トンネル. 22 October 2023. jsce.or.jp website.
  4. Web site: Shin-shimizu & Shimitsu tunnels. 22 October 2023.
  5. Web site: Doai Station in the middle of the Shin-Shimizu Tunnel.. 26 October 2023.