Shimokita Expressway Explained

Country:JPN
Type:Expressway
Route:Shimokita
Alternate Name:
Length Km:25.3
Length Ref:[1]
Established:2004
Direction A:South
Terminus A:Noheji Interchange
in Tōhoku, Aomori
Direction B:North
Terminus B1:Fukkoshi Interchange
in
Yokohama, Aomori
Section2:Incomplete Yokohama-Mutsu Section
Length Km2:36.1
Terminus B2:Mutsu Interchange
in
Mutsu, Aomori

The is a two-lane national expressway in Aomori Prefecture, Japan. The expressway connects Noheji to the municipalities of Rokkasho, and Yokohama. It is owned and operated by Ministry of Land, Infrastructure, Transport and Tourism (MLIT), and is signed as an auxiliary route of National Route 279, but has no expressway number under their "2016 Proposal for Realization of Expressway Numbering."[2] [3]

Route description

The southern terminus of the Shimokita Expressway is at a signaled intersection with National Route 4 in Tōhoku. From here, the expressway immediately loops from a western heading to the northeastern one. Along the short loop it crosses into Noheji, back into Tōhoku, then into Noheji once more after crossing over National Route 4. The expressway then crosses over the Aoimori Railway Line and proceeds north.
From Noheji heading north through the Shimokita Peninsula, the expressway parallels the mainline of National Route 279. After a couple of interchanges, the expressway enters the village, Rokkasho. The expressway's importance in the village is critical due to the presence of multiple nuclear facilities.[4] [5]
The expressway heads northeast while in Rokkasho. It crosses into the town of Yokohama where it meets its temporary northern terminus at the main line of National Route 279.While the expressway primarily has only one lane traveling in each direction, short passing lanes are available near Noheji-kimyo, Noheji-kita, and Rokkasho interchanges.

History

Planning began of the route commenced on 16 December 16, 1994. On 26 November 2004, the first section of the expressway opened to traffic between Noheji-half and Noheji-kita Interchanges. On 2 December 2005 the expressway was extended south to the current southern terminus at Noheji Interchange. On 13 November 2012 the expressway was extended north from Noheji-kita to Rokkasho Interchange. On 15 November 2017, the expressway opened to traffic between Rokkasho Interchange and Fukkoshi Interchange.[1] On 23 December 2019, the first section of the expressway in Mutsu opened.[6]

Future

The government of Aomori Prefecture plans for the Shimokita Expressway to be extended from both its northern terminus at Fukkoshi Interchange and its southern terminus at Noheji Interchange. From Fukkoshi, the expressway is to be extended 36.1km (22.4miles) to Mutsu Interchange in the city of Mutsu in the northern part of Aomori. As of January 2018, some of this section is under construction.[1] From Noheji Interchange, the expressway will be extended to a junction with the Kamikita Expressway and Michinoku Toll Road.[7] On 11 January 2019, the governor of Aomori Prefecture, Shingo Mimura requested the Liberal Democratic Party's help in providing funding for the section between Noheji and Shichinohe.[8] MLIT announced later in 2019 that the section between Noheji and Shichinohe will be evaluated to determine if the expressway should be extended.[9]

Junction list

The entire expressway is in Aomori Prefecture.

See also

External links

Notes and References

  1. Web site: 下北半島縦貫道路|青森県庁ウェブサイト Aomori Prefectural Government. www.pref.aomori.lg.jp.
  2. Web site: General Route 279 Shimokita Peninsula Junction Road notice of "Fukkoshi bypass" opening|青森県庁ウェブサイト Aomori Prefectural Government. www.pref.aomori.lg.jp.
  3. Web site: Japan's Expressway Numbering System. www.mlit.go.jp.
  4. News: Fuel reprocessing plant in northern Japan delayed again, to 2018 . Yamaguchi . Mari . The Japan Times . Associated Press . 17 November 2015 . 15 January 2018.
  5. Web site: Rokkasho-mura regional plan for disaster prevention. www.rokkasho.jp. June 2014. 15 January 2018.
  6. Web site: 下北道むつ南バイパスが一部開通 . ja. 23 December 2019. 30 January 2020.
  7. Web site: 縦貫道路パンフおもて|青森県庁ウェブサイト Aomori Prefectural Government. www.pref.aomori.lg.jp.
  8. News: 下北縦貫道の早期整備、自民党に要望/三村知事. ja. 東奥日報. 11 January 2019. 22 January 2019.
  9. News: 下北縦貫道路野辺地-七戸 計画段階評価へ. ja. 東奥日報. 30 March 2019. 8 April 2019.