Line 1 of CRT runs westwards from to . Line 1 began operation on 28 July 2011.[2]

Line 1 runs 16.4km (10.2miles) from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.4km (13.9miles). It is the city's first all-heavy rail metro line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction.

In 1992, the Chongqing government had signed a Build-Operate-Transfer in 1992 with a Hong Kong company, and provided the land for the project, but work ceased in 1997 due to legal issues. Work resumed on the first stretch of the line (from Chaotianmen to Shapingba) on 9 June 2007, and opened to limited operation on July 28.[3] An extension from Shapingba to Daxuecheng (University Town) began in 2009 and opened on December 21, 2012 before receiving a short extension from Daxuecheng to Jiandingpo a year later. And an extension, running from Jiandingpo to Bishan also opened on December 30, 2019, making Line 1 the first CRT line to reach areas outside Metropolitan Chongqing.[4] The latest extension from Xiaoshizi to Chaotianmen has been opened on 31 December 2020, making Line 1 a completely finished subway line.

Line 1 has 25 stations, including from east to west: Chaotianmen, Xiaoshizi, Jiaochangkou, Qixinggang, Lianglukou, Eling, Daping, Shiyoulu, Xietaizi, Shiqiaopu, Gaomiaocun, Majiayan, Xiaolongkan, Shapingba, Yanggongqiao, Lieshimu, Ciqikou, Shijingpo, Shuangbei, Laijiaqiao, Weidianyuan, Chenjiaqiao, Daxuecheng (University Town), Jiandingpo and Bishan stations.

Line 1 has transfer interchange stations with Line 6 at Xiaoshizi and Line 2 at Jiaochangkou in Jiefangbei CBD and at Daping and Line 3 at Lianglukou, which is near Chongqing railway station in central Yuzhong. Line 1 is also transferable with the Loop Line at Shapingba, although out-of-station transfer is currently needed due to construction setbacks on the interchange channel and concourse connecting the two subway lines.

Opening timeline

SegmentCommencementLengthStation(s)Name
Jiaochangkou  - Shapingba28 July 201114.22NaN210Phase 1 (initial section)
Xiaoshizi  - Jiaochangkou27 September 20111.42NaN21Phase 1 (remaining section)
Gaomiaocun17 November 2011Infill station1
Shapingba  - Daxuecheng20 December 201219.72NaN27Phase 2
Weidianyuan28 March 2013Infill station1
Majiayan25 September 2013Infill station1
Shijingpo28 September 2014Infill station1
Daxuecheng  - Jiandingpo30 December 20141.92NaN21Extension of Phase 2
Jiandingpo  - Bishan30 December 2019[5] 5.62NaN2[6] 1Extension to Bishan
Xiaoshizi  - Chaotianmen31 December 20200.82NaN2[7] 1Extension to Chaotianmen

Service routes

Current stations

Service
routes
Station
Station nameConnectionsDistance
Location
-0.00Yuzhong
0.660.66
1.362.02
0.852.87
CQW1.444.30
1.605.90
1.737.63
1.168.79
1.039.82Jiulongpo
1.2511.07
1.6812.75Shapingba
1.2013.95
1.0915.03

CYW
0.8715.90
1.1717.08
0.8217.90
1.0518.95
1.4020.35
1.9022.25
7.0029.25
1.7731.02
3.3534.37
1.9036.27
1.5537.81

[8]
5.9043.71Bishan

Notes and References

  1. Web site: 重庆轨道客运量9月30日创新高 达到257.4万乘次.
  2. http://english.cqnews.net/html/2011-07/28/content_7508012.htm Chongqing Metro Line 1 into trial operation
  3. Web site: Chongqing’s Metro Line 1 Now Open . 2012-08-27 . dead . https://web.archive.org/web/20110827204844/http://www.echinacities.com/chongqing/city-in-pulse/chongqing-s-metro-line-1-now-open.html . 2011-08-27 .
  4. Web site: 重庆轨道交通首次驶出主城 1号线璧山站要来了. 2019-11-13.
  5. Web site: 重庆又有两段轨道开通:1号线尖璧段、环线西南半环. 2019-12-30.
  6. Web site: 重庆轨道交通首次驶出主城 1号线璧山站要来了. 2019-11-13.
  7. Web site: 重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告. 2020-08-21. https://web.archive.org/web/20200830044104/http://www.cqjtkt.cn/news/2020821/2020821154913325189.htm. 2020-08-30. live.
  8. Web site: 重庆轨道交通15号线计划年内开建 27号线明年开建. https://web.archive.org/web/20191113100803/http://www.cq.xinhuanet.com/2019-07/23/c_1124787876.htm. dead. November 13, 2019. 2019-07-23.