Shetland Gas Plant Explained

Shetland Gas Plant
Alternate Names:SGP
Map Type:Scotland Shetland
Coordinates:60.474°N -1.2615°W
Building Type:Gas terminal
Location:Sullom Voe, ZE2 9UN
Completion Date:2016
Inauguration Date:2016
Floor Area:133acres

The Shetland Gas Plant is a natural-gas processing plant in the Shetland Islands, Scotland.

History

The Shetland Gas Plant is the collection and gas processing facility for the offshore Laggan-Tormore project, comprising two large gas and gas condensate fields. The Laggan gas field was discovered in 1986. The Tormore condensate field was discovered in 2007. The development plan for the site was approved in March 2010.

The site was formally opened by Amber Rudd, the Secretary of State for Energy and Climate Change, on 16 May 2016.[1]

Structure

The plant is connected to the Shetland Islands Regional Gas Export Pipeline (SIRGE). The plant was built by Petrofac's Offshore Engineering & Operations unit; Petrofac is a recent constituent of the FTSE 100 Index.[2] The site and pipelines cost around £800m. The gas is exported from the site via a 230km (140miles) 30inches diameter pipe south to the Frigg UK System in Aberdeenshire.

The site is adjacent, to the east, of the Sullom Voe Terminal.

Operation

The Laggan and Tormore gas fields are around 125km (78miles) north-west of the Shetland Islands, in sea depths of . Production from the plant began on 8 February 2016. The production from the Laggan-Tormore project is expected to be around 93,000 barrels of oil equivalent per day.

Key data for the Laggan and Tormore fields is as follows:[3] [4] [5]

Field NameLagganTormore
Block206/1a205/5a
Coordinates 61.045139°N 2.87056°W60.197778°N 3.170139°W (WHPS)

60.913944°N 3.171917°W (Template / Manifold)

Discovered19862007
Hydrocarbon contact, m TVDSS39093785 3940
ProductionGasCondensate
Permeability, mD10-2007010-20070
Oil gravity, °API52
Oil properties0.3 cP viscosity, 0.038%CO2
Gas expansion factor, Sm3/m3289259
Salinity, ppm6000-38000
Stock tank oil originally in place, MMstb92
Non-associated gas in place, billion cubic feet685346
OperatorTotalTotal
Water depth, metres600600
Commissioned20162016
TypeSubsea steelSubsea steel
FunctionTemplate / ManifoldWellhead protection structure (WHPS), Template / Manifold
Number of production wells42
Subsea weight, tonnes  550150 (WHPS), 550 (Template / Manifold)
Topsides weight, tonnes00
ExportTo Shetland Gas Plant via two parallel 141 km long, 18-inch diameter flowlines

See also

External links

Notes and References

  1. http://www.shetlandtimes.co.uk/2016/05/16/energy-minister-rudd-officially-opens-shetland-gas-plant Shetland Times
  2. http://www.petrofac.com/en-gb/our-services/case-studies/building-the-shetland-gas-plant/ Petrofac
  3. Web site: OSPAR offshore oil and gas installations inventory . 11 December 2023.
  4. Web site: Laggan-Tormore: Fast facts and brief history . 11 December 2023.
  5. Web site: The Laggan and Tormore fields, Blocks 206/1 and 205/5, UK Atlantic Margin . 12 December 2023.