Sherbino Mesa Wind Farm | |
Coordinates: | 30.811°N -102.362°W |
Country: | United States |
Location: | Pecos County, Texas |
Ps Units Operational: | 110 |
Ps Units Manu Model: | Vestas V-90, Clipper Windpower C-96 |
Ps Electrical Capacity: | 300 MW |
The Sherbino Mesa Wind Farm is located in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which has a potential capacity of 750 MW, is in operation. Phase I utilizes 50 Vestas V-90 Mk.5 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project.[1]
Phase II, located on a 20000acres site 40miles west of Fort Stockton, utilizes 60 Clipper Windpower C-96 wind turbines, each with a rated capacity of 2.5 MW. This phase will be in operation by the end of 2011.[2]