Mapcolor: | Orange (#) |
Type: | Rapid transit |
System: | Shenzhen Metro |
Status: | Operational |
Locale: | Shenzhen, China |
Stations: | 11 |
Operator: | SZMC (Shenzhen Metro Group) |
Character: | Underground |
Depot: | Wangji Lake stabling yard |
Stock: | Trains service in Line 2 CRRC Zhuzhou (258–281[801–824]) (6A) |
Linelength: | [1] |
Tracks: | Double-track |
Electrification: | (Overhead lines) |
Signalling: | Urbalis 888 CBTC Moving block |
Map State: | collapsed |
Open: | [2] |
Line 8 of the Shenzhen Metro (also known as the Yantian line) is an East-West line with 11 stations from Liantang to . It opened on 28 October 2020 between Liantang and, with a length of 12.3671NaN1 and a total of 7 stations. Line 8 is the first line to serve Yantian District. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station.
Phase 2 opened on 27 December 2023, which extended the line from Yantian Road to .[3]
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Liantang — Yantian Road | 28 October 2020 | 12.3672NaN2 | 7 | Phase 1 | |
Yantian Road — Xiaomeisha | 27 December 2023 | 7.962NaN2 | 4 | Phase 2 |
Service routes | Station name | Connections | Nearby bus stops | Distance | Location | ||||
---|---|---|---|---|---|---|---|---|---|
^ Trains continue to Chiwan station via Line 2 ^ | |||||||||
● | Liantang | (through service) | 0 | 0 | Luohu | ||||
● | 1.46 | 1.46 | |||||||
● | 4.32 | 5.78 | Yantian | ||||||
● | Haishan | 1.57 | 7.35 | ||||||
● | 1.24 | 8.59 | |||||||
● | 2.68 | 11.27 | |||||||
● | 1.41 | 12.68 | |||||||
● | 1.10 | 13.78 | |||||||
● | 1.14 | 14.92 | |||||||
● | 3.58 | 18.50 | |||||||
● | 2.14 | 20.64 | |||||||
Phase 3 is under construction. It will extend the line from Xiaomeisha to Xichong and will open in 2025.