Shenzhen–Zhanjiang high-speed railway explained

Native Name Lang:zh-hans
Status:Partly in operation
Locale:
Start:Jiangmen (current) / Xili (future)
End:Zhanjiang West (zh)
Stations:23
Open: (Maoming–Zhangjiang section); (Jiangmen–Maoming section)
Linelength:3870NaN0
Electrification: (Overhead line)
Speed:2000NaN0
Map State:collapsed
Shenzhen–Zhanjiang railway
S:深湛铁路
T:深湛鐵路
P:Shēn-Zhàn tiělù
J:sam1zaam3 tit3lou6
Order:st

The Shenzhen–Zhanjiang railway is a high-speed railway across the south of Guangdong province. Currently it runs from Jiangmen to Zhanjiang West. It will link the cities of Shenzhen and Zhanjiang when complete.

History

Announced as part of the 12th Five Year Plan for 2011–2016,[1] it was projected that construction of this railway would begin. Tenders were called for early in 2013[2] with construction to begin before the end of that year. Construction officially began on 28 June 2014. The Jiangmen–Maoming section opened on 1 July 2018.[3]

Construction of Shenzhen to Jiangmen section started on 9 October 2022.[4]

Route

The railway is to follow a 387km (240miles) route from Xili railway station to Maoming East railway station. The existing Xinhui branch[5] of the Guangzhou–Zhuhai intercity railway will be included as a central link, with 265km (165miles) of new trackage extending west to Maoming and then a new tunnel across the Pearl River Delta from Shenzhen south of the Humen Pearl River Bridge.

Starting at Xili railway station, the railway will travel through a tunnel to Shenzhen Airport East railway station at Shenzhen Bao'an International Airport.[6] It will then cross through a tunnel underneath the Pearl River[7] before reaching Xiaolan, Guzhen, Waihai, Jiangmen South, Shuangshuizhen, Taishan, Kaiping, Enping, Dahuai, Heshan, Yangjiang, Yangxi, Mata, Guanzhu, Dianbai and Maoming East.

Station NameChineseDistance
--><
--! China Railway
transfers/connections-->
Metro
transfers/connections
Location
Xili (U/C)
Shenzhen Airport East (via Airport East)
Dongguan Binhaiwan
Nansha (via Wanqingsha)
-bgcolor="lightgrey"Minzhong
Zhongshan North
Henglan
Jiangmen
Shuangshuizhen
Taishan
Kaiping South
Enping
Yangdong
Yangjiang
Yangxi
Mata
Dianbai
Maoming East
Maoming
Wuchuan
Zhanjiang West

Construction

The Maoming–Zhanjiang section was constructed between 2009 and 2013. The project was funded jointly by the, now defunct, Ministry of Railways and the Guangdong Provincial Government. Construction commenced on 21 March 2009[8] and was opened to traffic on 28 December 2013.[9] Although officially opened on 28 December 2013, no high-speed trains started using it at the time.

Construction of the 387km (240miles) Shenzhen–Maoming railway was carried out in two sections: the Jiangmen–Maoming section and the Shenzhen–Jiangmen section. Construction of the section from Jiangmen to Maoming started in June 2014[10] and was opened on 1 July 2018.[11] [3] From this point on, thru high-speed service started along the Guangzhou–Jiangmen–Maoming–Zhanjiang route.

A special feature of the Jiangmen–Maoming section is a 2036m (6,680feet) steel tunnel protecting the Birds' Paradise from the noise of the high-speed railway line. The noise barrier reduces the noise of the train to about 50 dB SPL at the bird park, which is only 800m (2,600feet) away from the high-speed railway line.[12] The section from Shenzhen to Jiangmen was delayed due to the complicated geographic condition of the mouth of the Pearl River and the large budget, 65.2 billion yuan (US$9.88 billion).[13]

The construction plan of China Railway Guangzhou Group Corp. shows the Shenzhen-Jiangmen section costs 51.3 billion yuan (US$7.27 billion); the project starts from Xili railway station in Nanshan District of Shenzhen, and passes through Bao'an District of Shenzhen and Dongguan, Zhongshan to end in Jiangmen. It has seven stations: Xili, Shenzhen Airport East, Dongguan Binhaiwan, Nansha, Zhongshan North, Henglan and Jiangmen. Simultaneously, a 20.4-kilometer rail line will be built to link Shenzhen Airport East railway station with Shenzhen North railway station, and a 12.6-kilometer connecting line will be built in Jiangmen and Zhongshan.[14]

Upon completion of the Shenzhen-Jiangmen section in 2028, the trip from Qianhai to Nansha will be cut to 30 minutes and the trip between Shenzhen and Maoming will be cut to three hours. Once the Shenzhen-Jiangmen section is operational, passengers change to the Ganzhou-Shenzhen high-speed railway at Xili railway station and to the Hangzhou-Shenzhen high-speed railway and the Guangzhou-Shenzhen-Hong Kong high-speed railway at Shenzhen North railway station. At Shenzhen Airport East railway station, the railay will offer transfers to Second Guangzhou–Shenzhen high-speed railway, which is currently under planning, and at Zhongshan railway station, it will be connected with Guangzhou-Zhuhai intercity railway.

Construction of Shenzhen to Jiangmen section started on 9 October 2022. The section is 116 km in length with 7 stations.

Notes and References

  1. Web site: Shenzhen–Maoming Railway announced in 12th 5 Year Plan. 15 August 2011. Shenzhen Daily. 2014-02-07. 4 January 2014. https://web.archive.org/web/20140104204544/http://www.szdaily.com/content/2011-08/15/content_5945703.htm. live.
  2. Web site: Shenzhen–Maoming Railway tenders called for. 31 July 2013. Shenzhen Daily. 2014-02-07. 4 January 2014. https://web.archive.org/web/20140104204344/http://szdaily.sznews.com/html/2013-07/31/content_2570838.htm. live.
  3. Web site: http://news.southcn.com/gd/content/2018-06/30/content_182410113.htm . zh:江湛铁路7月1日正式开通 改写粤西群众出行版图 . 2018-06-30 . 南方网 . 22 May 2019 . https://web.archive.org/web/20190522061449/http://news.southcn.com/gd/content/2018-06/30/content_182410113.htm . live .
  4. Web site: 广东高铁线路+1!深江高铁开工建设 途径东莞、广州南沙. 正线全长116公里,建设工期5.5年。全线共设深圳西丽、深圳机场东、东莞滨海湾、南沙、中山北、横栏、江门站等7座车站. 2022-10-09.
  5. Web site: There will be a new station in the Shenzhen–Maoming railway. 2 September 2013. Jiangmen Municipal Government. 2014-02-07. 8 January 2014. https://web.archive.org/web/20140108234857/http://english.jiangmen.gov.cn/jmxw/201309/t20130911_392676.htm. live.
  6. Web site: Two new stations to be constructed along Shenzhen-Maoming railway. 18 July 2013. Shenzhen Standard. 2014-02-07. 4 January 2014. https://web.archive.org/web/20140104204404/http://www.shenzhen-standard.com/2013/07/18/two-railway-stations-to-be-constructed-along-shenzhen-maoming-high-speed-line/. live.
  7. Web site: SZ-Jiangmen rail to adopt tunnel plan. shenzhen daily. 3 October 2017. 19 September 2017. 4 October 2017. https://web.archive.org/web/20171004035651/http://www.szdaily.com/content/2017-09/19/content_17333716.htm. live.
  8. Web site: http://www.chinanews.com.cn/gn/news/2009/03-21/1611932.shtml. zh:赣韶与茂湛两铁路动工兴建. China News. March 21, 2009. Shao and Gan Mao Zhan two railway under construction. zh. 7 October 2022. 15 December 2009. https://web.archive.org/web/20091215063319/http://www.chinanews.com.cn/gn/news/2009/03-21/1611932.shtml. live.
  9. Web site: http://www.mmstw.com/news/bencandy-htm-fid-49-id-29412.html. zh:茂名新闻联播:茂湛铁路今天正式通车. mmstw.com. Maoming News Network: Mao Zhan Railway opened to traffic today. December 28, 2013. zh. 7 October 2022. 12 August 2020. https://web.archive.org/web/20200812033407/http://www.mmstw.com/news/bencandy-htm-fid-49-id-29412.html. live.
  10. Web site: Shenzhen–Maoming high speed rail under construction. gateway to guangdong news. 3 October 2017. 20 June 2016. Maoming section was officially started in June 28, 2014.. 4 October 2017. https://web.archive.org/web/20171004040010/http://www.newsgd.com/specials/ladyxian/economy/content/2016-06/20/content_149802963.htm. live.
  11. China . International Railway Journal . 11. August. 2018 .
  12. Web site: Noise barrier protects birds from loud trains . Quanlin . Qiu . 2017-12-26 . China Daily . 2018-09-01 . 7 September 2022 . https://web.archive.org/web/20220907032044/https://www.chinadaily.com.cn/a/201712/26/WS5a41ab21a31008cf16da3758.html . live .
  13. Web site: Work to start on high-speed rail to Jiangmen. eyeshenzhen.com. 3 October 2017. 31 August 2017. 4 October 2017. https://web.archive.org/web/20171004035619/http://www.eyeshenzhen.com/content/2017-08/31/content_17163339.htm. live.
  14. Web site: Construction on tunnel project of rail line starts . 7 October 2022 . 13 July 2021 . https://web.archive.org/web/20210713212540/http://www.sz.gov.cn/en_szgov/news/latest/content/post_7841288.html . live .