Native Name: | 上海地铁14号线 |
Native Name Lang: | zh |
Other Name: | M6 (planned name) |
Image Alt: | Light blue seats and dark floors. |
Type: | Rapid transit |
System: | Shanghai Metro |
Status: | Operational |
Locale: | Pudong, Huangpu, Jing'an, Putuo, and Jiading districts, Shanghai, China |
Connectinglines: | |
Stations: | 30 (30 open and 1 under construction) |
Routes: | Mainline: ↔ Partial mainline: Zhenxin Xincun ↔ |
Owner: | Shanghai Rail Transit Line 14 Development Co., Ltd. |
Operator: | Shanghai No. 4 Metro Operation Co. Ltd. |
Character: | underground |
Depot: | Fengbang Depot Jinqiao Parking Lot |
Stock: | 49 Class A 8 car trains |
Tracklength: | 38.180NaN0 |
Tracks: | 2 |
Electrification: | Overhead lines (1500 volts) |
Speed: | 80km/h Average speed: 34.2km/h |
Signalling: | Thales SEC Transport |
Map State: | collapsed |
Line 14 of the Shanghai Metro is an east-west metro line opened on 30 December 2021.[1] The line, consisting of 31 stations, starts from Fengbang town in Jiading District, and terminate in Jinqiao town in Pudong New Area via,,, and . Its total length is 39.1km (24.3miles), and passengers are able to transfer to 13 existing and planned metro lines.[2] Due to Line 14 cutting across some of the densest areas of Shanghai and being a relief line for line 2, high ridership is expected for the line. As such the line uses high capacity 8 car A size trains similar to lines 1 and 2.[3] The line uses an automatic train control system jointly developed by Thales and Shanghai Electric.[4] Line 14 is fully driverless.[5] The line is colored
olive on system maps.Environmental evaluations began on January 2, 2014. On November 29, 2014, construction began on a section in Pudong New Area.[6]
The line was originally scheduled to open in 2020,[7] but its opening was delayed to 30 December 2021. Longju Road station has not been opened yet, due to problems with land acquisition process.
Segment | Commenced | Opened | Length | Station(s) | Name | Investment | |
---|---|---|---|---|---|---|---|
Fengbang - Guiqiao Road | 29 Nov 2014 | 30 Dec 2021 | 38.21NaN1 | 30 | Phase 1 | ¥57.686 billion | |
Longju Road | u/c | Infill station | 1 | ||||
| |||||||||||
● | 0.0 | 0.0 | 0 | Jiading | 30 Dec 2021 | ||||||
● | 1.61 | 1.61 | 2 | ||||||||
● | 1.65 | 3.26 | 4 | ||||||||
● | Jiayi Road | 1.55 | 4.81 | 7 | |||||||
● | Dingbian Road | 1.41 | 6.22 | 9 | |||||||
● | ● | Zhenxin Xincun | 1.24 | 7.46 | 11 | ||||||
● | ● | 1.00 | 8.46 | 13 | Putuo | ||||||
● | ● | 1.31 | 9.77 | 15 | |||||||
● | ● | 0.92 | 10.69 | 17 | |||||||
● | ● | 0.90 | 11.59 | 20 | |||||||
● | ● | 1.10 | 12.69 | 22 | |||||||
● | ● | 1.05 | 13.74 | 24 | |||||||
● | ● | 0.97 | 14.71 | 26 | Jing'an | ||||||
● | ● | 1.03 | 15.74 | 28 | |||||||
● | ● | 3.07 | 18.81 | 32 | Huangpu | ||||||
● | ● | 0.71 | 19.52 | 34 | |||||||
● | ● | 0.74 | 20.26 | 36 | |||||||
● | ● | 1.60 | 21.86 | 39 | Pudong | ||||||
● | ● | 1.01 | 22.87 | 41 | |||||||
● | ● | 0.74 | 23.61 | 43 | |||||||
● | ● | 1.05 | 24.66 | 45 | |||||||
● | ● | 1.06 | 25.72 | 47 | |||||||
● | ● | 1.23 | 26.95 | 49 | |||||||
| | | | 1.02 | 27.97 | Later opening due to land acquisition process | |||||||
● | ● | 2.05 | 30.02 | 53 | 30 Dec 2021 | ||||||
● | ● | 1.16 | 31.18 | 56 | |||||||
● | 1.86 | 33.04 | 58 | ||||||||
● | 0.88 | 33.92 | 60 | ||||||||
● | 1.49 | 35.41 | 63 | ||||||||
● | 1.28 | 36.69 | 65 | ||||||||
● | 1.49 | 38.18 | 67 | ||||||||
- Zhenxin Xincun | Zhenxin Xincun - | - | |||
Monday - Friday (Working Days) | |||||
7:00–9:20 | About 6 min and 40 sec | About 3 min and 20 sec | About 6 min and 40 sec | ||
Off-peak | 9:20–16:40 | About 12 min | About 6 min | About 12 min | |
PM peak | 16:40–20:00 | About 8 min | About 4 min | About 8 min | |
Other hours | About 5-12 min | ||||
Saturday and Sunday (Weekends) | |||||
Peak | 7:00–21:00 | About 10 min | About 5 min | About 10 min | |
Other hours |
| About 5-12 min | |||
Fleet numbers | Manufacturer | Time of manufac- turing | Class | No of car | Assembly | Rolling stock | Number | Notes | |
---|---|---|---|---|---|---|---|---|---|
392 | 2019–2020 | A | 8 | Tc+Mp+M+Mp+M+M+Mp+Tc | 14A01 | 14001-14049 (140011-143921) | Line 14 | [8] | |