Shanghai–Nanjing Riverside high-speed railway | |
Locale: | Jiangsu, China |
Start: | Nanjing South |
End: | Taicang |
Stations: | 8 |
Operator: | China Railway Shanghai Group |
Linelength Km: | 278.53 |
Tracks: | 2 |
Speed Km/H: | 350 |
Map Name: | map_name |
Map State: | uncollapsed |
The Shanghai–Nanjing Riverside high-speed railway[1] [2] is a high-speed railway line in Jiangsu, China. The line is 278.531NaN1 long and has a design speed of 350km/h.[3] It is opened for operation on 28 September 2023.[4]
Installation of the rails began on 1 September 2022.[5]
Operating started on 28 September 2023.
Between Nanjing South and Jiangning, the line runs parallel to the Nanjing–Hangzhou high-speed railway. Between Zhangjiagang and Taicang, the line runs parallel to the Shanghai–Suzhou–Nantong railway. After Taicang, trains on the Riverside HSR utilized the existing Shanghai–Suzhou–Nantong railway to enter Shanghai.
Station Name | Chinese | Metro transfers/connections | Location |
---|---|---|---|
Nanjing South | Nanjing | ||
Jurong | Zhenjiang | ||
Jintan | Changzhou | ||
Wujin | |||
Jiangyin | Wuxi | ||
Zhangjiagang | Suzhou | ||
Changshu | |||
Taicang |