Official Name: | Seri Tanjong Pinang |
Settlement Type: | Suburb of George Town |
Coordinates: | 5.4496°N 100.3099°W |
Subdivision Type: | Country |
Subdivision Name: | Malaysia |
Subdivision Type1: | State |
Subdivision Type2: | City |
Subdivision Name2: | George Town |
Established Title: | Founded |
Established Date: | 2005 |
Leader Title1: | Local government |
Leader Name1: | Penang Island City Council |
Postal Code Type: | Postal code |
Postal Code: | 10470 |
Leader Title2: | Mayor of Penang Island |
Leader Name2: | Rajendran P. Anthony |
Leader Title3: | Tanjong Bunga State Assemblyman |
Leader Name3: | Zairil Khir Johari (DAP) |
Leader Title4: | Bukit Bendera Member of Parliament |
Leader Name4: | Syerleena Abdul Rashid (DAP) |
Timezone: | MST |
Utc Offset: | +8 |
Timezone Dst: | Not observed |
Translit Lang1: | Other |
Translit Lang1 Type2: | Mandarin |
Translit Lang1 Info2: | Sī lǐ dān róng bīn láng |
Translit Lang1 Type3: | Tamil |
Translit Lang1 Info3: | Srī tañcōṅ piṉāṅ |
Pushpin Map: | Malaysia Penang George Town city centre |
Pushpin Map Caption: | Location within George Town in Penang |
Demographics Type1: | Demographics |
Demographics1 Title1: | Ethnic groups |
Demographics1 Info1: | |
Population Total: | 11970 |
Population Density Km2: | auto |
Area Total Km2: | 4.5 |
Population Footnotes: | [1] |
Population As Of: | 2020 |
Seri Tanjong Pinang is a suburb within the city of George Town in the Malaysian state of Penang. It lies 4.5km (02.8miles) northwest of the city centre and was created on land reclaimed off Tanjong Tokong in the 1990s.[2] The suburb also encompasses Gurney Bay and the ongoing reclamation project of Andaman Island.[3]
The Seri Tanjong Pinang project was first mooted in the 1980s, during the tenure of the then Chief Minister of Penang, Lim Chong Eu. The project is split into two phases, with land reclamation for Phase 1 commencing in the 1990s. However, the land reclamation was put on hold following the 1997 Asian financial crisis.
Having acquired the site in 2003, Eastern & Oriental Berhad resumed the development of the first phase. In spite of the increasing costs, the 240abbr=onNaNabbr=on Seri Tanjong Pinang Phase 1 was completed by 2005.[4]
The second phase of the Seri Tanjong Pinang project began in 2016, involving the reclamation of 760acres of land.[5] [6] Simultaneously, work began on the reclamation of Gurney Bay, which was partially opened to public by 2024.[7] [8] In 2019, the first phase of the Andaman Island reclamation was completed.[9] The man-made islet was envisioned as a mixed-use precinct with a gross development value of RM17 billion.[10]
, Seri Tanjong Pinang was home to a population of 11,970. Ethnic Chinese constituted nearly half of the suburb's population, while Malays formed another one-fifth of the population. Seri Tanjong Pinang attracted a sizable expatriate community, which constituted over 18% of the population, followed by the Indians at 6%.
Straits Quay, a marina-cum-shopping mall within the neighbourhood, was completed in 2010. Aside from containing over 100 retail lots, the marina consists of 40 pontoon berths designed to accommodate small recreational boats. The mall also houses the Performing Arts Centre of Penang (Penangpac) and a convention centre.
In addition, a Lotus's (formerly Tesco) hypermarket was launched at the suburb in 2011, making it the third such hypermarket in George Town.[11] [12]