Seattle Municipal Street Railway Explained

Seattle Municipal Street Railway
Locale:Seattle, Washington
Era1 Name:Horse-drawn
Era1 Owner:Various (1884–1889)
Era1 Operator:Various (1884–1889)
Era1 Propulsion System:Horse
Era1 Depots:-->
Era2 Name:Cable car
Era2 Propulsion System:Cable
Era2 El:-->
Era2 Depots:-->
Era3 Name:Electric streetcar
Era3 Lines:26 streetcar lines (1936)
Era3 Propulsion Systems:-->
Era3 El:-->
Era3 Depots:-->
Era3 Total Track Length:231miles (1936)

The Seattle Municipal Street Railway was a city-owned streetcar network that served the city of Seattle, Washington and its suburban neighborhoods from 1919 to 1941. It was a successor to the horse-drawn Seattle Street Railway established in 1884, and immediate successor to the Puget Sound Traction, Power and Light Company Seattle division.

History

Origins and consolidation

The first streetcars in Seattle were operated by Frank Osgood as the Seattle Street Railway, which ran horsecars starting from September 23, 1884.[1] Osgood went on to convert the horsecars to electric traction as the Seattle Electric Railway and Power Company, beginning with a test on March 30, 1889 and followed by regular service the next day.[2] [3] By 1891, Seattle had of street railway tracks, of which had been built since 1889.[4] [5]

Seattle railway systems (1891)
Name Image Length Type Operation started Notes
Single Double Total
Seattle City RailwayCable Originally named the Lake Washington Cable Railway. Started from Yesler & Fruit at Pioneer Place, ran east via Yesler to power house at Lake Washington; one turntable at each end.
Front Street Cable RailwayCable Ran north from Pioneer Square along Front and Second.
Madison Street Cable RailwayCable Ran east to Lake Washington, parallel to Yesler.
West Seattle Cable RailwayCable Ran north from the West Seattle ferry slip.
Union Trunk LineCable
Electric Included three-block counterbalance operation, using a loaded narrow-gauge car running underground.
Seattle Consolidated RailwayElectric Formerly Seattle Street Railway Company; consolidated with the West Street and Lake Union Railway as the Seattle Electric Railway in 1889. Reorganized as Consolidated Street Railway in April 1891.
Green Lake Electric RailwayElectric Feeder to Consolidated. Ran north from Fremont to Green Lake.
Rainier Power & RailwayElectric Feeder to Consolidated. Ran east from Lake Union to Brooklyn suburb.
Woodland Park Electric RailwayElectric Feeder to Consolidated. Built and operated by Woodland Park owner Guy C. Phinney.
West Street & North End RailwayElectric Initially drew power from Consolidated until powerhouse was completed in Jan 1891. Ran along West Street, then northeast to Ballard.
Rainier Avenue Electric RailwayElectric Ran east to Lake Washington, parallel to Yesler.
South Seattle Cable RailwayCable Test cars operated in 1890 to hold the franchise; planned conversion to electric.

In 1898, Stone & Webster began assembling a transit system by consolidating several smaller streetcar lines, including the Seattle Electric Railway. By 1900, Stone & Webster had amalgamated 22 lines and gained a 40-year operating franchise under a new power and transport utility named the Seattle Electric Company. The system also included cable car lines on Madison Street and Yesler Way. By the end of 1900, the City Council, under public pressure, forced Seattle Electric to provide free transfers between lines, and reduced their lease to 35-years.[6] In 1907, Stone & Webster also acquired the lease to the Everett streetcar system, and in 1912 it combined all of its transit and utility holdings in the area under a new company, the Puget Sound Traction, Power and Light Company (PSTP&L).[3]

Municipal acquisition

The City of Seattle entered into direct competition with Seattle Electric by furnishing electricity in 1905 after completing the Seattle Municipal Light and Power Plant. As Seattle Electric was distinctly unpopular with the citizens of Seattle and prevented by a state mandate, several requests for fare increases from the existing 5 cents were denied; meanwhile, there was an increasing need to transport tens of thousands of workers responding to the demand for ships resulting from World War I. High shipworker wages and the lack of fare increases meant that by early summer 1918, approximately of Seattle Electric's cars were idle because they could not pay operators enough.[7] In September 1918, PSTP&L agreed to sell its lines to the city, and several months of increasingly acrimonious negotiations followed.[7]

On March 31, 1919, the city of Seattle purchased the entire Seattle division of PSTP&L's street railways but the price of the acquisition,, left the transit operation with an immense debt and an immediate need to raise fares, which hurt ridership.[3] [7] By 1936, the city still owed half the principal on the 1918 bonds used to purchase the system, and was faced with a $4 million operating deficit. In 1939, a new transportation agency, the Seattle Transit System, was formed, which refinanced the remaining debt and began replacing equipment with "trackless trolleys" (as then known) and motor buses. The final streetcar ran on April 13, 1941.

Revival

See main article: Seattle Streetcar. A modern streetcar system debuted in 2007, with the introduction of the South Lake Union Streetcar. A second line, the First Hill Streetcar, opened in 2016. Further expansion plans were shelved in 2018 and remained unfunded as of 2024.[8]

Legacy

See also

Further reading

External links

Notes and References

  1. Web site: Streetcars first enter service in Seattle on September 23, 1884 . Crowley, Walt . October 2, 2000 . HistoryLink . 10 January 2022.
  2. Web site: Electric trolley line in Seattle begins regular service on March 31, 1889 . Crowley, Walt . October 3, 2000 . HistoryLink . 10 January 2022.
  3. Book: Kershner, Jim . 2019 . Transit: The Story of Public Transportation in the Puget Sound Region . 16, 28, 32, 37 . HistoryLink, Documentary Media . 9781933245553 . 1084619121.
  4. Seattle Railway Systems, Part 1 . The Street Railway Review . September 15, 1891 . 1 . 9 . 372–378.
  5. Seattle Railway Systems, Part 2 . The Street Railway Review . October 1891 . 1 . 10 . 439–444.
  6. Book: Crowley, Walt. Routes : An Interpretive History of Public Transportation in Metropolitan Seattle. Crowley Associates. 1993. Seattle. 16.
  7. The Seattle Municipal Street-Railway System . Douglas, Paul H. . June 1921 . The Journal of Political Economy . 29 . 6 . 455–477. 10.1086/253363 . 155001932 .
  8. Web site: 2024-01-19 . Cost estimates soar for potential new downtown Seattle streetcar . 2024-03-15 . The Seattle Times . en-US.
  9. Web site: Street Railways in Seattle. Crowley. Walt. February 10, 2000. historylink.org. February 16, 2017.