Seaford line explained

Seaford line
Type:Commuter rail
Locale:Adelaide, South Australia
Stations:24
Event1label:Re-sleepered
(concrete)
Event1:2009–2011
Event2label:Electrified
Event2:January 2013–14
Operator:Adelaide Metro
Tracks:2
Electrification: from overhead catenary
Map State:collapsed

The Seaford line is a suburban commuter line in Adelaide, South Australia.

History

Before the extension of the line to Noarlunga Centre in 1978, the Willunga line ran from Hallett Cove station on a different route through Reynella, Morphett Vale and Hackham to Willunga (south-east of Noarlunga). It closed in 1969 and in September 1972 a track-removal train removed the tracks, and for six years Noarlunga had no train service.

The South Australian Railways and its successor, the State Transport Authority, extended the current railway southwards in stages from Hallett Cove to cater for increasing residential development in the southern area. Opening dates for passenger services were: Hallett Cove Beach on 30 June 1974; Christie Downs on 25 January 1976 (This was a temporary terminus just north of Beach Road and adjacent to Hyacinth Crescent, and was in a different location to the current Christie Downs station, which opened in November 1981.); and Noarlunga Centre on 2 April 1978.

Prior to 2014, most trains were operated by 3000 class railcars augmented at times by 2000 class railcars. Since the electrification of the line, the latter are no longer authorised to operate on the line.[1] Most services are now operated by 4000 class electric multiple units. A number of railcars needed for peak-hour services are now stabled overnight in secure sidings at Port Stanvac, north of Lonsdale station, and at a much bigger facility adjacent to Seaford Meadows. The last freight trains on the line, to and from Port Stanvac Refinery, ceased in the late 1990s.

Re-sleepering and electrification

In 2008, the State Government announced a plan to upgrade and electrify the Seaford line with the Federal Government also to provide funding.[2] In December 2009, Stage 1 of the Noarlunga line upgrade was completed between Adelaide and Brighton.[3] This work saw the track removed, with the track bed and track renewed. Dual gauge sleepers were laid to allow for the line to be converted to standard gauge at a future date. Stage 2 commenced in February 2011 with the line closed for six months and continued the upgrade works between Oaklands and Noarlunga.[4] Most stations (Brighton, Seacliff, Marino, Marino Rocks and Lonsdale) received a minor upgrade due to the presence of asbestos in many station shelters, necessitating their replacement.

On 2 January 2013, the line closed to allow for its electrification and extension, with trains being replaced by bus services.[5] Rail services resumed on 1 December 2013.[6] The completed project was opened by the South Australian Transport and Infrastructure Minister Tom Koutsantonis on 18 January 2014.[7] Electric train services commenced in February 2014 after testing was completed on the line. At the time, only four 4000 class electric multiple units had entered service, so most services continued to be operated by 3000 class railcars.

Seaford extension

, 2019

In 2005, the State Government announced the line would be extended to the southern suburb of Seaford. The plan was cancelled in December 2007 after a study concluded that the extension could not be justified. The government announced that it would retain the corridor to Aldinga for a possible extension further south in the future.[8] In July 2008, a feasibility study was commissioned by the government into extending the line.[9] This extension was given approval after the Federal Government announced a $291 million investment in the project as part of the 2009/10 Federal Budget.[10]

Construction started in 2011 with the extension opening on 23 February 2014.[11] [12] The extension included a new 1.2km (00.7miles) elevated rail bridge over the Onkaparinga River, a rail bridge over Old Honeypot Drive, and new railway stations at Seaford Meadows and Seaford. New road bridges were also constructed over the extension at Goldsmith Drive, Seaford Road and Lynton Terrace.[13] [14] [15] [16] [17]

Future extension to Aldinga Beach

In 2019, Renewal SA delivered a Draft Structure Plan of a 94 hectare area of land in Aldinga which is set to include a new school and a train station.[18]

Route

The line runs south from Adelaide station paralleling the Belair line as far as Goodwood. It then branches off in a south-west direction through the suburbs of Edwardstown, Oaklands Park and Marion to the coast at Brighton, where it turns south towards Noarlunga Centre in the southern suburbs. The line was known as the Marino and Hallett Cove line when it finished at Hallett Cove. Most trains terminated at Marino, with only about a quarter going to Hallett Cove.

Like the rest of the Adelaide network, the line is broad gauge. Dual gauge sleepers have been laid to allow for the line to be converted to standard gauge at a future date.[19] The line is long and is the second longest of the Adelaide suburban railway lines. The line is double track throughout. The Australian Rail Track Corporation standard-gauge main line passes over the line just south of Goodwood station, and the Flinders line branches off south of Woodlands Park.

Line guide

Seaford Line
NameDistance from
Adelaide
Year openedServing suburbsConnections
0.0 km1856Adelaide
Bus Tram
2.0 km1898Mile End
4.0 km2014Keswick, Wayville
5.0 km1883Forestville, Goodwood
6.3 km1913Black Forest, Clarence Park Bus
7.1 km1928Black Forest, Clarence Park
7.9 km1913Edwardstown
9.1 km1925Ascot Park, Edwardstown Bus
10.2 km1914Ascot Park
11.4 km1954Marion
12.9 km1913Oaklands Park, Warradale Bus
13.7 km1956Warradale
14.6 km1914Hove
16.0 km1913Brighton Bus
17.0 km1915Seacliff Bus
18.3 km1913Kingston Park, Marino Bus
18.9 km1915Marino
21.4 km1915Hallett Cove Bus
22.9 km1974Hallett Cove Bus
26.7 km1976Lonsdale
28.9 km1976Christie Downs
30.2 km1978Noarlunga Centre Bus
34.7 km2014Seaford Meadows
36.0 km2014Seaford Bus Regional Coach

Former stations

Services

, 2011

Trains to and from Adelaide operate every 5–10 minutes during the weekday peak periods, every 10–20 minutes off-peak on weekdays, and every 30 minutes on weekends plus in the late evening. Previously, some stations were also serviced by trains from Brighton and from the Flinders branch line on weekdays.[20]

External links

Notes and References

  1. "Limited life for 2000 class Jumbo railcars" Railway Digest January 2015 page 20
  2. http://www.treasury.sa.gov.au/budget/previous-budgets/2008-09 2008/09 State Budget
  3. https://web.archive.org/web/20110312073004/http://www.infrastructure.sa.gov.au/RR/rail_revitalisation/noarlunga_line_renewal/schedule Noarlunga Rail Revitalisation Schedule
  4. https://web.archive.org/web/20130921192043/http://www.infrastructure.sa.gov.au/RR/rail_revitalisation/noarlunga_line_renewal/schedule Schedule
  5. http://www.adelaidemetro.com.au/var/metro/storage/original/application/f34aa3276c3466cc6e9cf20c48fe073e.pdf Noarlunga & Tonsley lines closed
  6. "Rail services resume on Noarlunga line" Railway Digest January 2014 page 23
  7. Web site: Wills . Daniel . January 19, 2014 . Transport and Infrastructure Minister Tom Koutsantonis turns on new electric Noarlunga train lines .
  8. http://www.abc.net.au/news/stories/2007/12/19/2122842.htm No rail service for Seaford
  9. http://www.news.com.au/adelaidenow/story/0,22606,23967700-2682,00.html Government looks at extending Noarlunga, Tonsley rail lines
  10. http://budget.australia.gov.au/2009-10/content/glossy/infrastructure/html/infrastructure_overview_08.htm 2009-10 Budget
  11. http://www.infrastructure.sa.gov.au/seaford Rail revitalistaion Seaford rail extension
  12. http://www.abc.net.au/local/photos/2014/02/20/3948509.htm?site=adelaide Electrifying opening for the new Seaford line
  13. http://dpti.sa.gov.au/infrastructure/seaford/seaford_rail_extension/features_and_benfits Features & benefits
  14. http://anthonyalbanese.com.au/seaford-rail-extension-moves-forward-ae“-planning-contracts-awarded-2 Seaford rail extension moves forward as planning contracts awarded
  15. http://www.projectlink.com.au/news/work-starts-on-seaford-rail-extension Work starts on Seaford rail extension
  16. http://adcorconstruction.com.au/seaford-rail-extension-project-south-australia/ Seaford Rail Extension Project
  17. http://www.thiess.com.au/projects/seaford-rail-extension/detail Seaford Rail Extension
  18. Web site: Development of Aldinga train station inches closer. Victor Harbour Times. 29 May 2019. 1 November 2019.
  19. http://www.railexpress.com.au/archive/2012/march/march-21st-2012/the-gauge-problems-lives-on The gauge problems lives on
  20. https://www.adelaidemetro.com.au/var/metro/storage/original/application/85a61478521f6729a670aaeb5a7624d6.pdf Seaford & Tonsley timetable