Science Park station (MBTA) explained

Science Park / West End
Style:MBTA
Style2:Green
Borough:Boston, Massachusetts, United States
Coordinates:42.3667°N -71.0676°W
Platform:2 side platforms
Passengers:873 boardings (weekday average)[1]
Pass Year:FY2019
Opened:August 20, 1955
Rebuilt:April 30 – November 4, 2011
Accessible:Yes
Other Services2 Header:Former services
Other Services2 Collapsible:yes
Mapframe:yes
Mapframe-Marker:rail-light
Mapframe-Zoom:14

Science Park station (signed as Science Park/West End) is an elevated light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line in Boston, Massachusetts, United States. The station is located at the Boston end of the Charles River Dam Bridge at Leverett Circle. It is at the southeast end of the Lechmere Viaduct, which carries the Green Line over the Charles River. The station is named for the nearby Boston Museum of Science. With 873 daily boardings by a FY 2019 count, Science Park is the least-used fare-controlled station on the Green Line, and the second-lowest on the MBTA subway system after .

The Lechmere Viaduct was built in 1912; Science Park station was built on the viaduct in 1955 to serve the new museum. Until 2005, the station was accessed with a footbridge over Leverett Circle. "West End" was added to station signs in 2009 to reflect the West End neighborhood. The station was closed for six months in 2011 for accessibility renovations. It was also closed in 2004–2005 and 2020–2022 during shutdowns of the viaduct for other projects.

Station design

Science Park station is elevated above Leverett Circle, where the Charles River Dam Bridge meets Storrow Drive at the north corner of the West End neighborhood. (The namesake Museum of Science is about west along the Dam Bridge.) The station is oriented with its two tracks and two side platforms running roughly northwest–southeast. The northwest halves of the 250feet-long platforms are on the concrete Lechmere Viaduct, while the other halves and the main station structure are on a section of steel viaduct.[2]

The entrances to the station are on a traffic island in the center of Leverett Circle, with crosswalks crossing the circle in several directions. The main fare lobby is located on a mezzanine level under the southeast half of the station, with stairs connecting it to street level and the platforms. Each platform has one elevator connecting it to street level and to the paid area of the main fare lobby, making the station accessible. Both elevators also have a small fare lobby with a single faregate at street level. A mini-high platform (for accessible boarding on older Type 7 LRVs) is located at the far end of each platform. With 873 daily boardings by a FY 2019 count, Science Park is the least-used fare-controlled station on the Green Line, and the second-lowest on the MBTA subway system after .

History

Construction

The Lechmere Viaduct and Causeway Street elevated opened in June 1912, providing a grade-separated route for streetcars from Somerville, Cambridge, and Charlestown to reach the Tremont Street subway. The 1mile elevated route was intended to reduce travel time from Lechmere Square to the subway; the only intermediate station was .[3] This substantially reduced transit service to the north part of the densely populated West End. (Some surface streetcar lines continued to run across the Charles River Dam Bridge until the 1920s, and bus routes ran on Charles Street from 1925 to 1927 and 1935 to the early 1940s.[4] [5]) An infill station on the Causeway Street elevated near Barton Street in the West End was proposed by the Boston Transit Commission in 1917 but never built.[6]

The Museum of Science opened its Science Park museum campus on the Dam Bridge in 1951. The museum and its director Bradford Washburn began lobbying the state legislature in 1953 to approve a new station at Leverett Circle to serve the museum.[7] The Metropolitan Transit Authority (MTA) opposed construction of the station, arguing that fare revenue would not cover the $150,000 to $250,000 cost (equivalent to $ to million in) of constructing the station.[8] A bill authorizing and directing the MTA to construct the station was signed by then-governor Christian Herter on April 29, 1954. The bill set the name of the station as Science Park.[9] [10]

The MTA board approved the station on May 14, 1954, with an estimated cost of $225,000 (equivalent to $ million in).[11] Aside from the museum, the station was intended to improve access to Massachusetts General Hospital for those taking buses to or Boston and Maine Railroad trains to North Station, who previously had to walk from North Station or backtrack to Charles station via .[12] It was also to serve a Massachusetts Registry of Motor Vehicles office, Massachusetts Eye and Ear, and the West End neighborhood – the latter about to be cleared for a controversial urban renewal project.[13] [14]

The board approved a construction contract on November 3, 1954, with work beginning soon after.[15] The Metropolitan District Commission constructed a footbridge across Storrow Drive (opened in 1951) in 1955 at a cost of $120,000 (equivalent to $ million in). It connected directly to the above-ground fare mezzanine of the station.[16] The steel frame of the station was in place by April 1955.[17] Science Park station opened on August 20, 1955.[18] Despite claims from the museum and other supporters that the station would serve half a million annual riders, the MTA commented in its year-end report that "Patronage of this station has been, and continues to be, negligible."[19]

MBTA era

The Massachusetts Bay Transportation Authority (MBTA) replaced the MTA in 1964. The lightly used Science Park station was not significantly modified for the remainder of the century. The station was closed from June 25, 2004, to November 12, 2005, while the Causeway Street elevated was replaced by a new tunnel under TD Garden. A sloped concrete viaduct was built to connect Science Park station to the new tunnel.[20] The footbridge over Leverett Circle was removed in 2005 as part of Big Dig construction (to allow for the addition on an underpass to Storrow Drive), though the state promised to replace it.[21] [22] In 2016, the Massachusetts Department of Transportation began designing a replacement bridge.[23] On January 21, 2009, station signage was changed to read "Science Park/West End", though MBTA maps continued to use the shorter name.[24] [25]

In 2006, the MBTA began planning a renovation of the station for accessibility.[26] Design work was completed, and an environmental assessment published, in June 2009.[27] That August, the Executive Office of Energy and Environmental Affairs determined that a full environmental impact report was not necessary.[28] Initial plans for the $22 million project called for the station to remain open during most of the construction period, with the two platforms closed for sequential six-month periods.[29] This was changed to a single six-month closure of Science Park and Lechmere stations – with no trains operating over the viaduct – to reduce the construction duration by six months and reduce costs.

The stations closed on April 30, 2011, for construction to proceed. Work included the building of two elevators with street-level fare lobbies, widening the platforms, replacement of platform canopies, reconstruction of the stairways, and general code compliance. The platform level was raised slightly to allow level boarding on low-floor Type 8 LRVs, while "mini-high" ramps were added to allow accessible boarding on older high-floor Type 7 LRVs. [30] While both stations were closed, the MBTA operated a free shuttle bus service connecting them to North Station. Science Park station was reopened and regular service between Lechmere and North Station resumed on November 5, 2011.[31]

Only the E branch served Science Park from when service resumed after the 2004–05 closure until 2022. On May 24, 2020, service between North Station and Lechmere was temporarily replaced with shuttle buses due to Green Line Extension construction. In January 2022, the MBTA made accessibility improvements on the platforms, including new tactile edge strips.[32] E branch service north of North Station to Lechmere resumed on March 21, 2022, accompanied by an extension to .[33] The Green Line was closed between Union Square and Government Center from August 22 to September 18, 2022; the closure allowed for final integration of a second northern branch, elimination of a speed restriction on the Lechmere Viaduct, demolition of the Government Center Garage, and other work.[34] Since September 2022, both D and E branch trains have served Science Park.

External links

Notes and References

  1. Web site: A Guide to Ridership Data . MassDOT/MBTA Office of Performance Management and Innovation . June 22, 2020 . 8.
  2. Book: Science Park/West End Station Accessibility Improvements: Environmental Assessment, Section 4(f) Statement, Environmental Notification Form . June 2009 . Massachusetts Bay Transportation Authority. 1 2 3 4 5 6 7 8 9 10 11
  3. News: State and City Officials Inspect New Elevated . Boston Globe . May 28, 1912 . 3 . Newspapers.com.
  4. Clarke . Bradley H. . May 2020 . Lechmere Station – The End of the End . Rollsign . Boston Street Railway Association . 57 . 5/6.
  5. A Decade of the Bus on the "El": Part I: Bus Routes of the First Five Years . Co-operation . July 1932 . 110 . 11 . 7 . Boston Elevated Railway.
  6. News: West End Station on the Viaduct . Boston Globe . January 10, 1917 . 5 . Newspapers.com.
  7. News: Museum of Science Wants MTA Station at Leverett Circle . Boston Globe . January 20, 1953 . 18 . Newspapers.com.
  8. News: Woman in White Opposes Brother on M.T.A. Issue . Boston Globe . February 15, 1954 . 19 . Newspapers.com.
  9. Book: https://archive.org/details/actsresolvespass1954mass/page/238/mode/2up . 239–240 . Chapter 359: An Act Authorizing the Metropolitan Transit Authority to Erect and Maintain a Station to be Known as Science Park Station . Acts and Resolves Passed by the General Court of Massachusetts in the Year 1954 . 1955 . Edward J. Cronin.
  10. News: At the State House: March 17th Holiday for All Again Defeated in House . Boston Globe . April 22, 1954 . 3 . Newspapers.com.
  11. News: Science Park M. T. A. Station O.K.'d by Board . Boston Globe . May 14, 1954 . 2 . Newspapers.com.
  12. News: M.T.A. Station to Aid M.G.H, Science Park . Boston Globe . May 15, 1954 . 3 . Newspapers.com.
  13. News: At the State House: House Votes to Probe Eastern Mass. Railway . Boston Globe . March 25, 1954 . 3 . Newspapers.com.
  14. Book: Trolleys Under the Hub . Cheney . Frank . Sammarco . Anthony M. . 1997 . Arcadia Publishing . 0752409077 . 53.
  15. News: M.T.A. Lets Contract for Museum Station . Boston Globe . November 3, 1954 . 44 . Newspapers.com.
  16. News: Science Park Station Overpass Bids to Be Opened on Jan. 27 . Boston Globe . January 5, 1955 . 4 . Newspapers.com.
  17. News: Progress on New M.T.A. Station . Boston Globe . April 20, 1955 . 23 . Newspapers.com.
  18. News: Science Park Station to Be Open Saturday . Boston Globe . August 15, 1955 . 13 . Newspapers.com.
  19. Book: Ninth Annual Report of the Board of Trustees of the Metropolitan Transit Authority . 5 . 1955.
  20. Effective Saturday, November 12th, Green Line Service To Lechmere and Science Park Stations To Resume . Massachusetts Bay Transportation Authority . November 4, 2005.
  21. Book: https://books.google.com/books?id=lqI1AQAAMAAJ&pg=SA111-PA7 . Central Artery (I-93)/Tunnel (I-90) Project: Final Supplemental Environmental Impact Statement . III-9 . Google Books . Part III: Section 4(f) Evaluation . January 1991 . Massachusetts Department of Public Works.
  22. News: West End debates planned pedestrian bridge . Boston Globe . November 7, 2007 . Noah . Bierman.
  23. News: Steps taken for pedestrian bridge over Leverett Circle . Boston Herald . March 27, 2016 . Jordan . Graham.
  24. 'West End' Added to Science Park . Massachusetts Bay Transportation Authority . January 21, 2009.
  25. News: Ryan . Andrew . January 21, 2009 . With new station name, Green Line now stops in West End . https://web.archive.org/web/20090124055129/http://www.boston.com/news/local/breaking_news/2009/01/with_new_statio.html . January 24, 2009 . Boston Globe.
  26. News: Public Announcement: Solicitation for Consulting Services . Boston Globe . June 30, 2006 . E8 . Newspapers.com.
  27. Web site: https://web.archive.org/web/20100205105504/http://mbta.com/uploadedfiles/About_the_T/T_Projects/T_Projects_List/Permitting%20Review%20Presentation%20%207%2029%2009.pdf . February 5, 2010 . Science Park/West End Station Accessibility Improvements: Public Meeting/Scoping Session . July 28, 2009 . AECOM . Massachusetts Bay Transportation Authority . 7.
  28. Web site: https://web.archive.org/web/20100205105446/http://mbta.com/uploadedfiles/About_the_T/T_Projects/T_Projects_List/MEPA%20Certificate%208-21-09.pdf . February 5, 2010 . Certificate of the Secretary of Energy and Environmental Affairs on the Environmental Notification Report . August 21, 2009 . Ian A. . Bowles . Executive Office of Energy and Environmental Affairs.
  29. News: $22m rehab slated for Science Park T station . Eric . Moskowitz . Boston Globe . May 30, 2010 . B2 . Newspapers.com.
  30. Web site: Science Park/West End Improvement Project . Massachusetts Bay Transportation Authority . https://web.archive.org/web/20120105030618/http://www.mbta.com/about_the_mbta/t_projects/default.asp?id=14747 . January 5, 2012.
  31. Patrick-Murray Administration Celebrates Science Park/West End Station Modernization . November 7, 2011 . Massachusetts Bay Transportation Authority.
  32. Web site: Week in Review and Lookahead . January 21, 2022 . Massachusetts Bay Transportation Authority.
  33. Green Line Extension (GLX) Union Square Branch Opens March 21 . March 18, 2022 . Massachusetts Bay Transportation Authority.
  34. Building A Better T: GLX Medford Branch to Open in Late November 2022; Shuttle Buses to Replace Green Line Service for Four Weeks between Government Center and Union Square beginning August 22 . August 5, 2022 . Massachusetts Bay Transportation Authority.