Eglinton East LRT explained

Eglinton East LRT
Type:Light rail
System:Toronto subway
Status:Proposed
Locale:Toronto, Ontario
Start:
End:McCowan Road and Sheppard Avenue
Stations:27
Routes:3 branches
Operator:Toronto Transit Commission

The Eglinton East LRT (EELRT), also known as Line 7 Eglinton East and formerly known as the Scarborough Malvern LRT, is a proposed light rail line in Toronto, Ontario, Canada. The line would be entirely within the district of Scarborough. It was originally part of Transit City, a 2007 plan to develop new light rail lines along several priority transit corridors in the city.

Unlike Line 5 Eglinton, which is a Metrolinx project, the EELRT is a City of Toronto project., the plan was that the EELRT be designed and operated as a distinct service from Line 5 Eglinton; both would terminate at Kennedy station with no connecting track., the estimated cost of the EELRT was $4.65billion, with construction expected to occur between 2027 and 2034.

History

Transit City

The Scarborough Malvern LRT was part of Toronto mayor David Miller's Transit City proposal announced on 16 March 2007, to be operated by the Toronto Transit Commission. In 2008, the Scarborough Malvern LRT was included in Metrolinx's regional transportation plan The Big Move within that plan's 25-year horizon.[1] In 2009, the initial design for the Scarborough Malvern LRT was completed. The line was expected to cost approximately $1.26billion, including vehicles, property, escalation and an apportioned cost of the maintenance and storage facilities. With construction originally scheduled to begin in 2014, the line was expected to open in 2019 as the last of the seven Transit City lines.

The Scarborough Malvern LRT was approved by Toronto City Council on 30 September 2009,[2] and the environmental assessment received a notice to proceed from the Government of Ontario on 15 December 2009.[3] After a change in municipal leadership, it was cancelled by Mayor Rob Ford on 1 December 2010, when he announced the cancellation of the entire Transit City initiative.[4] [5] While LRT lines on Sheppard East, Finch West, and Eglinton were revived through a new agreement between the City of Toronto and Metrolinx, the Scarborough Malvern LRT was not included.[6]

Crosstown extension

In 2016, the city directed staff to resurrect and update the 2009 plan for the Scarborough Malvern LRT. The project was renamed the Eglinton East LRT. Until 2021, the city considered making the EELRT an eastward extension of Line 5 Eglinton.

In 2016, to complement the Scarborough Subway Extension (SSE), the planned extension of Line 2 Bloor–Danforth to Scarborough Town Centre, the City of Toronto drafted a plan to extend Line 5 Eglinton farther east into Scarborough to terminate at the University of Toronto Scarborough campus.[7] On 20 January 2016, Toronto City Council approved revisions to the Scarborough subway plan that would include reviving much of the original plan for the Scarborough Malvern LRT as a 12km (07miles) eastern extension of Line 5 Eglinton to University of Toronto Scarborough, rebranded as "Crosstown East",[8] and later renamed "Eglinton East" in 2017.[9] The extension would add 18 new stops east of Kennedy station and serve an estimated 43,400 additional riders per day (a ridership similar to that of the Line 4 Sheppard subway).[10] The extension was expected to serve "neighbourhood improvement areas" (often low-income areas) such as Eglinton East, Scarborough Junction, Morningside, Scarborough Village and West Hill.[11]

In November 2017, the project was mostly unfunded, with the cost estimated at $1.6 to $1.7billion, with an estimated completion date of 2023.[12] At a November 2017 public meeting, city staff presented the possibility of extending the Eglinton East LRT by six stops to Malvern Town Centre. The Malvern extension would be 4.2to long. The extension to Malvern Town Centre would have seven stops: at Pan Am Drive, Sheppard/Morningside, Brenyon Way, Murison Boulevard, Sheppard/Neilson, Wickson Trail, and Malvern Town Centre.[13]

In April 2019, Ontario premier Doug Ford, brother of Rob Ford, announced a plan for Toronto rapid transit that included the Eglinton West LRT (a westward extension of Line 5 Eglinton), the Scarborough Subway Extension of Line 2, the Yonge North Extension of Line 1 and the Ontario Line. The Eglinton East LRT was noticeably not included and was left off the accompanying map.[14]

By October 2020, the City of Toronto and the TTC were in the process of implementing bus-only lanes from Kennedy station to the University of Toronto Scarborough campus via Eglinton Avenue, Kingston Road and Morningside Avenue as part of the RapidTO bus rapid transit scheme, which approximates the route of the Eglinton East LRT. The lanes were anticipated to be fully installed and operational by that November. As well as "red carpet" bus lanes, bus stops were also consolidated to approximately the same configuration and frequency of proposed LRT stations, with certain lower-order curbside stopssuch as those at Huntington Avenue, Brimley Road, Oswego/Barbados Roads and Torrance Avenuebeing removed entirely.[15]

In December 2020, the City of Toronto announced changes to the Eglinton East LRT proposal. The tunnel portal at Kennedy station would be extended eastwards to Huntington Avenue due to changes in the Scarborough Subway Extension project, which involved modifying the depth of the tunnel as well as adding a third subway track for service improvements. A station at Midland Avenue was moved underground as a result. A new maintenance and storage facility north of the University of Toronto Scarborough was added to the plan as a result of the Sheppard East LRT cancellation. Originally, both the Eglinton East LRT and the Sheppard East LRT were to have shared a maintenance and storage facility at Conlins Road east of Sheppard and Morningside. The other aspects of the project remained the same, including a tunnel under Kingston Road and Morningside Avenue due to traffic congestion at the Kingston/Lawrence and Morningside area.[16]

In December 2020, the council directed staff to study the entire original route to Malvern Town Centre[17] and begin a high-level design.[18] Since the province had agreed to fully fund the Scarborough Subway Extension, Mayor John Tory requested in 2021 that the $1.2billion the city had accumulated for that project be redirected to the Eglinton East line.[19]

Standalone line

By 2022, city planning staff had concluded a through-service connection at Kennedy station was not feasible as an EELRT tunnel would be only above the SSE tunnel at Kennedy station, and the SSE tunnel structure would not be strong enough to safely support an EELRT tunnel above it. Thus, city staff proposed a "distinct-service concept" for the EELRT. Doing so would result in lower construction costs, a shorter construction period, fewer private property impacts and design flexibility. With this flexibility, the EELRT would not need to conform to Line 5's technology, operations, and maintenance requirements. The city could choose another type of light-rail vehicle and would use the Conlins Yard as the line's maintenance and storage facility. Previously considered tunnels between Kennedy station and Midland Avenue and under Kingston Road would be replaced by surface alignments. The line could also be extended farther to the under-construction terminus of the Line 2 Scarborough extension at Sheppard Avenue and McCowan Road.[17]

By May 2022, the estimated cost of the EELRT is $3.9billion, with an expected opening in the early to mid-2030s.[20] A July 2022 TTC report and a May 2023 city presentation referred to the proposed EELRT as Line 7 and gave the line a mint green colour.[18]

By the end of 2023, the high-level design was expected to be completed, along with a draft of the environmental project report (EPR) and the start of the transit project assessment process (TPAP). Public consultation began in May 2023.[18]

During the 2023 Toronto mayoral by-election, the topic of a future EELRT connecting to Pan Am Sports Centre and the University of Toronto Scarborough, and later to Sheppard–McCowan, was frequently discussed by candidates.

In November 2023, the project design was 10 percent complete, and the total revised cost of the project was $4.65billion. At the time, the province (through Metrolinx) was considering extending Line 4 Sheppard east of Don Mills station with the potential of overlapping the EELRT route along Sheppard Avenue. Thus, in case of overlap, city planners proposed to adjust the EELRT alignment. There was also the possibility that the preferred site for the EELRT maintenance and storage facility at Sheppard Avenue and Conlins Road might not be available. Thus, city planners would look at other potential sites as a contingency.[21]

By May 2024, the City of Toronto had completed the 10-percent design and started a Transit and Rail Project Assessment Process, a streamlined environmental assessment that could take up to 185 days to complete. The project team recommended against a request by city council to add an extra stop at Morningside Park because of the steep slope along Morningside Avenue at the park entrance.[22]

Route

The EELRT line would run for, with 27 new proposed stops between Kennedy station and two termini, one at Sheppard Avenue East and McCowan Road and the other at Malvern Town Centre.

The southern terminus of the line would be at Kennedy station at Kennedy Road and Eglinton Avenue, with connections to Line 2 Bloor–Danforth, Line 5 Eglinton, and the Stouffville GO Line. The EELRT platform would be located on the east side of the Stouffville line and on the south side of Eglinton Avenue within its own off-street, ground-level station building. There would be a pedestrian tunnel connecting the EELRT station to the Line 5 concourse. From Kennedy station, the line would enter a reserved centre median on Eglinton Avenue before crossing Midland Avenue.

Running east on Eglinton Avenue East, the EELRT would pass Eglinton GO Station while continuing to Kingston Road. Just west of the Eglinton/Kingston stop, there would be a turnback and train storage track. Turning northeast on Kingston Road, the line would pass Guildwood GO Station. Between the Lawrence and Kingston/Morningside stops, there would be a storage track. The line would turn north on Morningside Avenue.

Along Morningside Avenue, the line would jog through the University of Toronto Scarborough campus (UTSC) after passing the Ellesmere stop and turning east on Ellesmere Road. The university is planning a new street on campus (dubbed New Military Trail) that would be located northeast of the existing Military Trail. The EELRT would follow this new street from Ellesmere Road back to Morningside Avenue. UTSC would have two LRT stops: the UTSC stop with the southbound platform on Ellesmere Road and the northbound platform on New Military Trail, and the Pan Am Sports Centre stop on the south side of its namesake. There are plans for a new bus terminal and connections to the planned Durham–Scarborough bus rapid transit.[18]

After leaving UTSC, the line would continue north until Sheppard Avenue, where the Scarborough Malvern LRT would have originally met the cancelled Sheppard East LRT. The EELRT would then continue west on Sheppard Avenue to Neilson Road, where it would split into two branches. The first branch would travel north along Neilson Road and terminate at Malvern Town Centre.[18]

The second branch would proceed further west from Neilson Road along the alignment of the cancelled Sheppard East LRT to McCowan Road. There, this branch would connect with Line 2 again, where the future terminus of Line 2 Bloor–Danforth at McCowan Road and Sheppard Avenue would be located. The EELRT would terminate on Sheppard Avenue on the east side of McCowan Road. There would be an underground pedestrian path to the station's planned bus terminal as well as to Line 2. A project map indicates that two tail tracks for the EELRT would extend to the west side of McCowan Road. As a later project, Line 4 Sheppard could be extended from Don Mills station to Line 2's new eastern terminus (also along the alignment of the cancelled Sheppard East LRT).[18]

The EELRT tracks would be located in centre-of-street reserved lanes. There would be four road lanes separate from the LRT lanes along Eglinton Avenue East, Kingston Road, Morningside Avenue (north of Ellesmere Road) and Sheppard Avenue. There would be two road lanes along Morningside Avenue (south of Ellesmere Road) and along Neilson Road.[18]

Operations

The EELRT would use trains long or less and use its own distinct vehicles (i.e. different from those used on Line 5 Eglinton) in order to better adapt to the line's conditions: no running in tunnels, shorter trains and platforms, and a better ability to climb grades to avoid expensive road infrastructure changes. Light-rail vehicles would need to handle grades in excess of 6 percent, such as along Morningside Avenue, and be able to make sharp, 90-degree turns at street intersections. The maximum speed would be 80kph on an exclusive right-of-way and 60kph on a semi-exclusive right-of-way.

Trains would operate every four to five minutes during peak periods. The EELRT would operate as three branches:

There would also be a short non-revenue branch on Sheppard Avenue from Morningside Avenue east to Conlins Road to provide access to a proposed maintenance and storage facility.

Proposed stops

There would be 27 stops spaced to apart for an average of . All LRT platforms are long. Unless otherwise noted below, all centre platforms are wide, and all side platforms are wide. With far-side platforms, an LRT train must cross a signalized intersection to reach the platform. Parallel platforms are two side platforms that face each other.

The proposed stops from north to south would be:[23]

Proposed stops! Stop name !! Description
Along Neilson Road
Malvern Town CentreParallel platforms located next to Malvern Town Centre north of Tapscott Road
Neilson–BernerFar-side platforms located at Berner Trail and Wickson Trail
Along Sheppard Avenue East
Sheppard–McCowan
  • Centre platform (10m (30feet) wide) located east of McCowan Road
  • Connection to planned underground station for Line 2 Bloor–Danforth and later Line 4 Sheppard
  • Access to the underground station via elevators and staircases from the LRT platform on the surface
ShortingFar-side platforms at Shorting Road and Havenview Road
Markham NorthFar-side platforms at Markham Road
WashburnFar-side platforms at Washburn Way and Lapsley Road
Sheppard–Neilson Far-side platform on each of the north, east and west legs of the junction to Malvern Town Centre
Sheppard–Brenyon Far-side platforms at Brenyon Way and Breckon Gate
Morningside–Sheppard Centre platform on Sheppard Avenue west of Morningside Avenue
Along or near Morningside Avenue
Pan Am Sports CentreFar-side platforms on New Military Trail at Pan Am Drive
UTSC
Ellesmere
West Hill Far-side platforms, near West Hill Collegiate Institute
Along Kingston Road
Kingston–Morningside
  • Centre platform located west of Morningside Avenue
  • Centre storage track west of the platform
Kingston–Lawrence
  • Centre platform, west of Lawrence Avenue East
  • Storage track east of the platform
Galloway Far-side platforms located at Galloway Road
Guildwood GO far-side platforms located adjacent to Guildwood GO Station with connection to Lakeshore East GO train line
Guildwood Parkway Far-side platforms
Eglinton–Kingston
  • Centre platform located on Kingston Road at Eglinton Avenue
  • Storage track west of the platform
Along Eglinton Avenue East
Markham Far-side platforms located at Markham Road
Mason Far-side platforms located at Mason Road
Eglinton GO
McCowan Far-side platforms located at McCowan Road
DanforthParallel platforms located west of Danforth Road
Falmouth
  • Centre platform located east of Falmouth Avenue with a storage track on the west side of Falmouth Avenue
  • Storage track located west of Falmouth Avenue
Midland
  • Centre platform located east of Midland Avenue
  • Storage track east of platform
Kennedy Station
  • Wedge-shaped centre platform (width: 13m (43feet) at west end, 5.5m (18feet) at east end)
  • Enclosed within a weather-protected shed on the east side of the GO Transit Stouffville line
  • Connections to Line 2 Bloor–Danforth, Line 5 Eglinton, and Stouffville GO train line
  • Connection to planned "Line 3 Busway" between Kennedy station and Ellesmere Road via the former Line 3 Scarborough right-of-way

See also

External links

Notes and References

  1. Web site: The Big Move . Metrolinx . 2008 . 22 April 2015 . 2 May 2015 . https://web.archive.org/web/20150502142544/http://www.metrolinx.com/en/regionalplanning/bigmove/big_move.aspx . live .
  2. Web site: Request for Approval of the Scarborough-Malvern LRT Environmental Assessment Study - City Council Decision . 31 December 2015 . 27 January 2016 . https://web.archive.org/web/20160127231301/http://app.toronto.ca/tmmis/viewAgendaItemHistory.do?item=2009.PG31.3 . live .
  3. https://www.dropbox.com/sh/2579egirb5im589/AACDNrmdP-sYoUsOj4m_lFXCa/Scarborough%20Malvern/ministers_notice_to_proceed.pdf?dl=0 Minister's Notice to Proceed
  4. News: Carter . Tristan . Jane LRT goes off the rails . Town Crier . Streeter Publications . 25 February 2011 . town-crier . 31 December 2015 . 5 September 2017 . https://web.archive.org/web/20170905232402/http://mytowncrier.ca/news/jane-lrt-goes-off-the-rails/ . dead .
  5. News: Mayor Rob Ford: "Transit City is over" . . 1 December 2010. https://web.archive.org/web/20101204123034/http://www.torontolife.com/daily/informer/streetcar-named-disaster/2010/12/01/mayor-rob-ford-%E2%80%9Ctransit-city-is-over%E2%80%9D/ . 4 December 2010 . 17 March 2014 . live . Rob Ford's first few hours as mayor sure have been busy. As the dailies are reporting, Ford met with TTC chief general manager Gary Webster at seven this morning to let him know that Transit City, and its attendant 'war on the car', were kaput. 'I just wanted to make it quite clear that he understood that Transit City's over and the war on the car is over, and all new subway expansion is going underground', Ford said, according to the Sun. 'And that's pretty well it.'.
  6. News: TTC, Metrolinx finally sign off on LRTs . Tess Kalinowski . 28 November 2012 . . 28 November 2012 . 30 November 2012 . https://web.archive.org/web/20121130225123/http://www.thestar.com/news/gta/transportation/article/1293988--ttc-metrolinx-finally-sign-off-on-lrts . live .
  7. News: Scarborough subway would shrink under plan to extend Eglinton Crosstown . . Oliver . Moore . Marcus . Gee . 20 January 2016 . 30 November 2017 . 21 January 2016 . https://web.archive.org/web/20160121004014/http://www.theglobeandmail.com/news/toronto/major-revamp-of-contentious-scarborough-subway-plan-includes-fewer-stops/article28280303/ . live .
  8. Web site: New Scarborough transit plan 'buys peace in the land' . . Jennifer Pagliaro, City Hall reporter & Tess Kalinowski, Real Estate Reporter . 16 January 2016 . 20 January 2016 . 20 January 2016 . https://web.archive.org/web/20160120192953/http://www.thestar.com/news/gta/transportation/2016/01/20/revised-scarborough-subway-plan-eliminates-2-stations.html . live .
  9. News: Pagliaro . Jennifer . Mayor John Tory and Councillor Josh Matlow square off on Scarborough transit . November 30, 2017 . . 29 November 2017 . 30 November 2017 . https://web.archive.org/web/20171130063945/https://www.thestar.com/news/city_hall/2017/11/29/mayor-john-tory-and-councillor-josh-matlow-square-off-on-scarborough-transit.html . dead.
  10. News: Priority should be alternative transit routes into downtown: Keenan . . Edward . Keenan . 2 June 2016 . 5 June 2016 . 4 June 2016 . https://web.archive.org/web/20160604122847/https://www.thestar.com/news/gta/2016/06/02/priority-should-be-alternative-transit-routes-into-downtown-keenan.html . live .
  11. Web site: New Scarborough transit plan 'buys peace in the land' . . Jennifer . Pagliaro . Tess . Kalinowski . 16 January 2016 . 20 January 2016 . 20 January 2016 . https://web.archive.org/web/20160120192953/http://www.thestar.com/news/gta/transportation/2016/01/20/revised-scarborough-subway-plan-eliminates-2-stations.html . live .
  12. News: Toronto City Council approves planning for raft of transit projects . . Moore . Oliver . 13 July 2016 . 14 July 2016 . 4 April 2017 . https://web.archive.org/web/20170404124448/http://www.theglobeandmail.com/news/toronto/toronto-city-council-shows-support-for-scarborough-subway-expansion/article30910103/ . live .
  13. Web site: Eglinton East Corridor Wish Mapping . usurped . https://web.archive.org/web/20190126221346/https://eglintoneastlrt.ca/corridor-wish-mapping/ . 26 January 2019 . Eglinton East LRT . January 26, 2019.
  14. Web site: Eglinton East LRT left out of Ontario's new transit plan . Centennial Community and Recreation Association . 24 March 2020 . 19 August 2020 . https://web.archive.org/web/20200324050114/https://ccranews.com/eglinton-east-lrt-left-out-of-ontarios-new-transit-plan/ . March 24, 2020.
  15. Web site: Implementation of priority bus-only lanes to be accelerated across the city; Eglinton East identified as first priority . . July 8, 2020 . 19 August 2020 . https://web.archive.org/web/20200819210331/http://www.ttc.ca/News/2020/July/08_07_20NR_bus-only_lanes.jsp . 19 August 2020.
  16. Web site: Attachment 1 Eglinton East Light Rail Transit and the Waterfront Transit Network . 3 December 2020 . 3 December 2020 . https://web.archive.org/web/20201203163854/https://www.toronto.ca/legdocs/mmis/2020/ex/bgrd/backgroundfile-158918.pdf . live .
  17. Web site: Transit Network Expansion Update . . 14 July 2022 . https://web.archive.org/web/20220709121525/https://ttc-cdn.azureedge.net/-/media/Project/TTC/DevProto/Documents/Home/Public-Meetings/Board/2022/July-14/8_Transit_Network_Expansion_Update.pdf . 9 July 2022 . live .
  18. Eglinton East Light Rail Transit (EELRT)–Functional (10%) Design Phase . live . . . May 2023 . https://web.archive.org/web/20230518064924/https://www.toronto.ca/wp-content/uploads/2023/05/9606-EELRT-Public-Consultation-presentation-May-2023non-AODA.pdf . 18 May 2023 . 18 May 2023 . Eglinton East LRT: Public Consultation . https://www.toronto.ca/community-people/get-involved/public-consultations/infrastructure-projects/eglinton-east-light-rail-transit/eglinton-east-lrt-public-consutlation/ . Phase One Virtual Public Meetings.
  19. News: Mayor's executive committee approves almost $14B in spending — but nothing for supportive housing proposal for Toronto's homeless . . Jennifer . Pagliaro . 11 February 2021 . February 15, 2021 . 15 February 2021 . https://web.archive.org/web/20210215045730/https://www.thestar.com/news/city_hall/2021/02/11/mayors-executive-committee-approves-almost-14b-in-spending-but-nothing-for-supportive-housing-proposal-for-torontos-homeless.html . dead.
  20. Web site: Advancing City Priority Transit Expansion Projects – Eglinton East LRT and Waterfront East LRT . . 25 May 2022 . https://web.archive.org/web/20220601141513/https://www.toronto.ca/legdocs/mmis/2022/ex/bgrd/backgroundfile-226594.pdf . 1 June 2022 . live.
  21. Web site: Advancing Eglinton East Light Rail Transit . . 2023-11-21 . https://web.archive.org/web/20231201013022/https://www.toronto.ca/legdocs/mmis/2023/ex/bgrd/backgroundfile-241045.pdf . 2023-12-01 . live . mdy-all.
  22. Web site: Eglinton East Light Rail TransitPublic Consultation for the Transit and RailProject Assessment Process . . 2024-05-29 . https://web.archive.org/web/20240530001415/https://www.toronto.ca/wp-content/uploads/2024/05/9712-EELRTTRPAP-Public-Consultation-MaterialsFinalAOADA-compressed21May2024.pdf . 2024-05-30 . live .
  23. Web site: Eglinton East Light Rail Transit (EELRT) Alignment and Stop Assessment . . 2023-11-21 . https://web.archive.org/web/20231201022937/https://www.toronto.ca/legdocs/mmis/2023/ex/bgrd/backgroundfile-241046.pdf . 2023-12-01 . live . mdy-all.