Savin Hill station explained

Savin Hill
Style:MBTA
Style2:Red
Address:121 Savin Hill Avenue
Tracks:2
Parking:20 spaces
Opened:November 1845 (original station)
November 5, 1927 (rapid transit)
Closed:1926 (original station)
Rebuilt:May 9, 2004–July 31, 2005
Accessible:Yes
Passengers:2,199 boardings (weekday average)[1]
Pass Year:FY2019
Other Services Header:Former services
Other Services Collapsible:yes
Mapframe:yes
Mapframe-Marker:rail-underground
Mapframe-Zoom:13
Map State:collapsed

Savin Hill station is a rapid transit station in Boston, Massachusetts. It serves the Ashmont branch of the MBTA's Red Line. It is located at 121 Savin Hill Avenue adjacent to Sydney Street in the Savin Hill area of the Dorchester neighborhood. Opened in 1845 as a commuter rail station, Savin Hill was converted to rapid transit in 1927 and rebuilt in 2004–05 for accessibility. Averaging 2,199 daily boardings by a FY 2019 count, Savin Hill is the least-used station on the Red Line.

Station layout

Five tracks pass roughly north-south through the station area, which is located on the west side of the Southeast Expressway. The island platform serving the two-track Ashmont Branch is on the west side of the alignment, with the single commuter rail track and the two Braintree Branch tracks to the east.[2] The main entrance to the station is at the north end of the platform from the Savin Hill Avenue overpass; a secondary entrance is located on South Sydney Street.

History

Old Colony Railroad

The Old Colony Railroad opened from Plymouth to South Boston in November 1845.[3] Savin Hill was a flag stop for South Braintree and Dorchester and Milton Branch trains by 1848.[4] A station building was located just north of the modern location by 1852.[5] The station was moved to its modern location just south of Savin Hill Avenue by 1874.[6] The Old Colony constructed a new brick station building in 1881.[7] It was located on the west side of the tracks (the inbound side, as the Old Colony had left-hand running until 1895), with a wooden building on the east side. After the line was quadruple-tracked, the station was served only by local trains on the outer tracks, while express trains used the inner tracks.[8] [9]

Conversion to rapid transit

Commuter rail service on the Shawmut Branch ended in September 1926. The Boston Elevated Railway, which had bought the line, began converting it into the Dorchester Extension, a rapid transit extension of the Cambridge-Dorchester Tunnel line. Savin Hill, located on the Old Colony mainline, was rebuilt as a rapid transit station as part of the extension. The commuter rail platforms and station buildings were removed, though a temporary station was used until November 4, 1927.[10] Savin Hill reopened on November 5, 1927 along with Columbia and Fields Corner as part of the first phase of the extension.

In 1934, the Boston Elevated Railway requested the addition of a busway on the west side of the station. Construction on the busway and a pedestrian overpass to the platform began in August and finished in December 1934. Fare control was relocated to the platform level; a platform extension to the south was constructed - without interrupting train service - to accommodate this.[11]

On January 13, 1961, the MTA began operating "modified express service" on the line during the morning rush hour, following the introduction of similar service on the Forest Hills–Everett line the month before. Every other train bypassed Savin Hill and three other stations.[12] This was discontinued in September 1961 to reduce wait times at the skipped stations, most of which were outdoors.[13]

Savin Hill is not directly served by any MBTA bus routes. Until the 1960s, four bus routes including the 18 terminated at Savin Hill. However, the M.T.A. desired to build a parking lot at the Savin Hill busway location. In September and December 1962, the 13 and 14 routes were rerouted away from Savin Hill to keep buses off local streets, while the 12 and 18 were combined into the modern 18 route.[14] [15]

Savin Hill station was further modified during the remainder of the 20th century with the removal of the waiting room in the 1970s and a longer platform extension in the late 1980s to allow 6-car trains. By the end of the century, however, it still contained the most original structure of any of the pre-war stations on the line. However, like the rest of the stations on the branch, Savin Hill was not accessible, placing it in violation of the Americans with Disabilities Act of 1990.

2004–05 reconstruction

The MBTA broke ground for the Red Line Rehabilitation Project – a $67 million reconstruction of Shawmut, Fields Corner, and Savin Hill stations – in October 2003.[16] Construction began in March 2004.[17] The 1927-built station was closed on May 9, 2004, and was completely razed to make way for the new ADA-compliant station which involved adding elevators for full accessibility.[18] A bus shuttle was run from JFK/UMass station during the 14-month closure, which ended with the opening of the new station on July 31, 2005.[19] The closure was originally scheduled to last 10 months, but was delayed by inclement weather and slow procurement of structural steel.[20] Most of the station was complete by April 2005; however, it could not be reopened until the accessible elevators and escalators were completed.[21] Original plans to include public art as part of the Arts on the Line program were removed in budget cuts; only historical interpretive panels were installed.[22] [23]

Buses again replaced service on the Ashmont Branch from October 14–29, 2023, to allow for track work.[24] [25] Stairway replacement at Savin Hill station was also performed during the closure.[26]

External links

Notes and References

  1. Web site: A Guide to Ridership Data . MassDOT/MBTA Office of Performance Management and Innovation . June 22, 2020 . 10.
  2. Web site: Improving the Southwest Expressway: A Conceptual Plan . Central Transportation Planning Staff . Boston Region Metropolitan Planning Organization . January 2012.
  3. Book: The Rail Lines of Southern New England . Karr, Ronald Dale . Branch Line Press . 1995 . 0942147022 . 310–315.
  4. News: Old Colony Railroad . Boston Evening Transcript . January 20, 1848 . 1 . Newspapers.com.
  5. Map of the city and vicinity of Boston, Massachusetts . F.G. . Shields . 1852 . J.B. Shields . 1:39,600.
  6. Atlas of the county of Suffolk, Massachusetts : vol. 3rd including Boston and Dorchester : from actual surveys and official records . G.M. Hopkins & Co. . Hopkins . Griffith Morgan Jr. . 1874 . 48–49 . Plate K: Part of Ward 16 . 1:2,400.
  7. Book: Eighteenth Annual Report of the Old Colony Railroad Co. to the Stockholders . 6 . November 1881 . Old Colony Railroad Company.
  8. Book: Boston's Red Line: Bridging the Charles from Alewife to Braintree . Cheney, Frank . 2002 . Arcadia Publishing . 0738510475 . 80–81.
  9. 43504499 . Dates of Some of the Principal Events in the History of 100 Years of the Railroad in New England. 1826-1926 . Warren . Jacobs . October 1928 . . Railway and Locomotive Historical Society . 17 . 17 . 15–28.
  10. News: Station at Savin Hill to End Service Nov 4 . Boston Globe . October 19, 1927 . 2 . Newspapers.com.
  11. Book: Annual Report of the Transit Department for the Year Ending December 31, 1934 . City of Boston Printing Department . Boston Transit Department . 41–42 . 1935 . Internet Archive.
  12. News: MTA Boosts Service For New Year's Eve . The Boston Globe . December 29, 1960 . 8 . Newspapers.com.
  13. News: M.T.A. Dropping Morning Express . The Boston Globe . September 27, 1961 . 10 . Newspapers.com.
  14. Web site: MBTA Red Line . nycsubway.org . O'Regan, Gerry . 2005 . 12 May 2013.
  15. News: Savin Hill Bus To Quit Runs Dec. 29 . Boston Globe . December 12, 1962 . 32 . Newspapers.com.
  16. https://web.archive.org/web/20031202150230/http://www.mbta.com/insidethet/press_releases_details.asp?ID=934 . December 2, 2003 . MBTA Breaks Ground On Three New Red Line Stations . October 7, 2003 . Massachusetts Bay Transportation Authority.
  17. https://web.archive.org/web/20040418223512/http://www.mbta.com/insidethet/press_releases_details.asp?ID=983 . April 18, 2004 . Red Line Rehabilitation Project To Begin . March 5, 2004 . Massachusetts Bay Transportation Authority.
  18. Web site: Shawmut, Fields Corner, Savin Hill MBTA Stations . Barletta Companies . 26 January 2012.
  19. Healey, Menino Tout Newly-Renovated Savin Hill Station . Massachusetts Bay Transportation Authority . August 3, 2005.
  20. Update On Status Of The Rehabilitation Of Savin Hill Station On The Red Line . Massachusetts Bay Transportation Authority . January 28, 2005.
  21. News: Good sense derailed . Boston Globe . Adrian . Walker . April 28, 2005 . B1 . Newspapers.com.
  22. News: Budget cuts leave no room for art at Dorchester T stops . Donovan . Slack . Boston Globe . April 19, 2003 . 15 . Newspapers.com.
  23. Web site: On the Red Line . 2017 . Massachusetts Bay Transportation Authority . 10, 11.
  24. News: Dumcius. Gintautas. August 24, 2023. MBTA to shut down Ashmont, Mattapan branches in October. Dorchester Reporter. September 13, 2023.
  25. MBTA to Expedite Critical Track Work Between JFK/UMass and Ashmont Stations and on the Mattapan Line, Shuttle Buses to Replace Service on Ashmont Branch and Mattapan Line October 14-29 . August 24, 2023 . Massachusetts Bay Transportation Authority.
  26. News: Dumcius . Gintautas . September 13, 2023 . T chief, top aide tour JFK/UMass Station as Oct. shutdown looms . Dorchester Reporter . September 13, 2023.