The Nazario Sauro class are diesel-electric submarines operated by the Italian Navy. All boats were built by Fincantieri in Monfalcone.
Italy developed the Sauro-class submarines in the 1970s to counter the underwater threat of the Soviet Union. Italian shipbuilding company Fincantieri built these vessels in Monfalcone.
The class entered service in 1980 and replaced the mixed fleet of Toti, Tang and Tench class submarines. A further two units, Leonardo da Vinci and the Guglielmo Marconi were commissioned in 1981 and 1982. In 1983 and 1988 two additional pairs of boats were ordered to the Improved Sauro class design. They were delivered in 1988-89 and 1994-95 by Fincantieri. They were eventually succeeded by the Todaro-class (the joint German-Italian Type 212-based group).
Sauro and Cossato were Batch I boats while da Vinci and Marconi were Batch II boats. Pelosi and Prini made up Batch III and Longobardo and Priaroggia were the two Batch IV boats.
Lengths varied between the batches. Beams measured 6.8 meters for all of the class. Draught was increased progressively from 5.3 meters to 6.3 meters. Armament of all the batches was 6 x 533mm torpedo tubes with 12 reloads carried. Batches I and II used Whitehead A-184 torpedo series while batches III and IV used upgraded Whitehead A-184 Mod 3 series.
The Sauro and Marconi were retired in 2001 and 2002 respectively. In 2005, the remaining two original submarines were retired and the remaining four, the Salvatore Pelosi (S522), Giuliano Prini (S523), Primo Longobardo (S524), and Gianfranco Gazzana Priaroggia (S525) were upgraded. These upgrades included replacement of the acoustic sensors and weapons control system, improvements in the communications system, and extension of the service lines.
US approached Italy to purchase retired Sauro-class submarines. Italy tentatively agreed but Taiwan rejected the offer. The plan called for the US to purchase four submarines when decommissioned, then refurbish them in the US and sell them to Taiwan. Once refurbished, the Italian submarines were expected to be operational for another 15 years, and the deal included an extension program.
There are three sub groups built in four batches:
- Sauro class | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Pennant number | Name | Batch | Shipyard | Hull number | Laid down | Launched | Commissioned | Decommissioned | Image | |
S 518 | I | Fincantieri Monfalcone (Gorizia) | 4257 [2] | 26 June 1974 | 9 October 1976 | 1 March 1980 | 30 April 2002 | |||
S 519 | I | Fincantieri Monfalcone (Gorizia) | 4258 | 15 November 1975 | 16 November 1977 | 5 November 1979 | 1 April 2005 | |||
S 520 | II | Fincantieri Monfalcone (Gorizia) | 4339 | 1 July 1976 | 20 October 1979 | 6 November 1982 | 30 June 2010 | |||
S 521 | II | Fincantieri Monfalcone (Gorizia) | 4340 | 23 October 1979 | 20 September 1980 | 11 September 1982 | 1 October 2003 | |||
S 522 | III | Fincantieri Monfalcone (Gorizia) | 4405 | 23 July 1985 | 29 November 1986 | 14 July 1988 | in service | |||
S 523 | III | Fincantieri Monfalcone (Gorizia) | 4406 | 30 July 1987 | 12 December 1987 | 17 May 1989 | in service | |||
S 524 | IV | Fincantieri Monfalcone (Gorizia) | 5878 | 19 December 1991 | 20 June 1992 | 14 December 1993 | in service | |||
S 525 | IV | Fincantieri Monfalcone (Gorizia) | 5879 | 12 November 1992 | 26 June 1993 | 12 June 1995 | in service |