Country: | IND |
Type: | NH |
Route: | 63 |
Length Km: | 321 |
Terminus A: | Satara |
Terminus B: | Latur |
States: | Maharashtra |
Cities: | Satara, Mhaswad, Malshiras, Akluj, Barshi Latur |
Maint: | NHAI |
Satara–Malshiras-Akluj-Barshi-Latur Highway is a national highway in the state of Maharashtra. This is a part of the Marathwada Integrated Road Development Project launched by the Government of Maharashtra by the Chief Minister Mr. Devendra Fadnavis.
Express Highway, based on the govt approval and the formal announcement by state govt authorities, this highway is a project connecting two major cities Satara & Latur in Maharashtra to the NH 52 via the same link-route and in less time than the SH 77. Though said so, if developed with 2 lane basis, as declared earlier by the State Public Works Dept., this highway can save more than 1.5 hrs of time between Latur and Mumbai.
Though approved on 18 Nov 2015,[1] its major development would be started in early 2017 and it would be completed by the end of 2020. The Satara–Akluj sector is already started with full flow of traffic, while the Tembhurni–Yedshi–Latur sector is still under construction and expected to be completed soon (by the end of 2020). It is expected to share the major direct road traffic between these cities, including all traffic from SH 77 and SH 3.
Though this is a state highway, it is built on the National Highway basis. A list of National Highways in India by highway number is available as is the list of State Highways in Maharashtra.
The Highway is just 10% completed throughout and the remaining work is supposed to be done by the end of 2020. Maharashtra govt is trying to operate this highway through a private party for a period of over 30 years in order to recover the cost of this highway.[2]
This highway bypasses the other major cities in Maharashtra state, on SH 77 and on SH 3, though it passes through their areas. It directly connects Yedshi to Osmanabad.
This highway passes through 4 districts of Maharashtra:
The total length of this highway is 321km (199miles),[3] from Satara to Latur, excluding the portions of SH 77 and SH 3 it covers at Nanded and Latur–Yedshi sectors respectively. This highway also covers the part portions of the Maharashtra State Highways at certain areas, which are now being rebuilt with National Highway Standards.
Its major route is as follows:
Satara – (via SH77)–Koregaon–Mhaswad–Malshiras–Akluj–Tembhurni–Kurduwadi–Barshi–Yedshi–Dhoki–Latur