Sasang–Hadan Line Explained

Sasang–Hadan Line
System:Busan Metro
Status:Under construction
Locale:Busan, South Korea
Start:Sasang Station
End:Hadan Station
Stations:6 (Phase 1), 13 (Phase 2)
Planopen:2026
Character:Underground automated light metro
Linelength Km:6.9
Map State:collapsed

Sasang–Hadan Line is a prospective light metro line in Busan, South Korea. The first phase will connect Sasang Station to Hadan Station. It is highly likely to open under the name "Line 5".

Infrastructure

All stations will have elevators, escalators, and platform screen doors. The line will be equipped for unmanned automatic operation and will have a central control system for management of the entire line, eliminating the need for staff to be present at stations. Construction began in 2016 and is expected to be completed in 2023 with total operating expenses of 73.2 billion won.[1]

Stations

Station
Number
Station nameTransferDistance
in km
Total
distance
Location
English Hanja
501SasangKorean: [[:ko:사상역|사상]] -0.0BusanSasang District
502--
503--
504--
505-- Saha District
506Hadan하단 6.90

See also

Notes and References

  1. Web site: ˝사상~하단선 3공구 재입찰˝ 부산교통공사의 형식적인 쇼. 국제신문.