Santiago Metro Line 8 Explained

Santiago Metro Line 8
Color:FF6414
Type:Rapid transit
System:Santiago Metro, Transantiago
Status:In planning
Locale:Santiago
End:El Peral metro station
Stations:14
Routes:1
Planopen:2032[1]
Owner:Empresa de Transporte de Pasajeros Metro S.A.
Operator:Empresa de Transporte de Pasajeros Metro S.A.
Character:Underground
Linelength:19km (12miles)
Tracks:2
Map State:collapsed

Santiago Metro Line 8 is a planned rapid transit line that will form part of the Santiago Metro. It is planned to have an approximate length of, connecting the communes of Providencia on the northeast and Puente Alto on the southeast of the Chilean capital.

It will connect with lines 1 and 6 in Los Leones, with line 3 in Chile España, and with line 4 in Macul. Its distinctive color on the network line map is orange.

Postponement of the project

Due to the October protests in Santiago that affected the Santiago Metro, on Monday, March 9, 2020, the company declared the tenders for lines 8 and 9 void.[2] This is largely due to the fact that the company has allocated the resources in repair the damage caused by the multiple incendiary attacks suffered by various stations in the social crisis.[3]

Stations

Stations running from north to south.[4] :
Stations (tentative name)TransfersLocationOpeningCommune
Los LeonesLos Leones/Colipi2033[5] Providencia
Eliodoro YáñezLos Leones/Eliodoro Yáñez
Diagonal OrienteLos Leones/Jaime Guzman
Chile EspañaJosé Pedro Alessandri/Dublé Almeyda2032Ñuñoa
GreciaJosé Pedro Alessandri/Grecia
Rodrigo de ArayaMacul/Rodrigo de ArayaMacul
QuilínMacul/Quilín
Las TorresMacul/Dr. Amador Neghme
La Florida/Américo VespucioLa Florida
Walker MartínezLa Florida/Walker Martínez
Rojas MagallanesLa Florida/Rojas Magallanes
TrinidadLa Florida/Trinidad
Diego PortalesCamilo Henríquez/Diego PortalesPuente Alto
El PeralCamilo Henríquez/El Peral

External links

Notes and References

  1. Web site: Cuáles son las primeras estaciones que entrarán en funcionamiento en la futura línea 8 de Metro. La Tercera. es. May 11, 2024. May 11, 2024.
  2. Web site: 2020-03-09 : Pág. 7.
  3. https://www.cnnchile.com/pais/licitaciones-desiertas-metro-linea-8-y-9_20200309/ Declaran desiertas las licitaciones para las construcciones de las líneas 8 y 9 del Metro
  4. https://www.metro.cl/licitaciones/descarga/c0cccc24dd23ded67404f5e511c342b0 Licitación Línea 8
  5. metrodesantiago. 1789330931615957016. La puesta en servicio de la futura #L8 se realizará en dos etapas. Revisa todo aquí! . Metro de Santiago. es. May 11, 2024.