Sanriku-kita Jūkan Road explained

Country:JPN
Maint:Ministry of Land, Infrastructure, Transport and Tourism
Sanriku-kita Jūkan Road
Length Km:59.9
Established:2006
Direction A:South
Terminus A:Tarō-kita Interchange

in Miyako, Iwate
Direction B:North
Terminus B:Kuji Interchange


in Kuji, Iwate

The is an incompleted expressway in the coastal area of Iwate Prefecture in northern Japan. It is owned and operated primarily by the Ministry of Land, Infrastructure, Transport and Tourism (MLIT). It is routed concurrently with an alternate route of Japan National Route 45 and is numbered E45 under MLIT's "2016 Proposal for Realization of Expressway Numbering" as an expressway running parallel to the aforementioned National Route 45.[1]

Route description

As of March 2019, the expressway consists of three sections, one that bypasses the central part of Hachinohe, Aomori and the other traveling north from the central part of Kuji, Iwate. The southernmost of these begins at the northern terminus of the Sanriku Expressway in Miyako. It passes through the town of Iwaizumi and then enters the village Tanohata where it comes to a temporary end at the parallel Route 45. Further north the expressway has another section, entirely within Tanohata, measuring just over four kilometers long. Continuing north along Route 45 the expressway begins again in the village, of Fudai. Like the previous section, it is located entirely within the limits of the village, measuring just over four kilometers long before it rejoins the parallel Route 45. The northern terminus of the route when it is to be completed is located at an interchange with Japan National Route 395 in Kuji that presently only serves the Hachinohe-Kuji Expressway.

Future

The expressway is expected to be completed between Tanohata and Fudai by 2020 as part of a region-wide recovery effort from the 2011 Tōhoku earthquake and tsunami.[2]

Junction list

The entire expressway is in Iwate Prefecture.

External links

Notes and References

  1. Web site: Japan's Expressway Numbering System. www.mlit.go.jp . 22 March 2019.
  2. Web site: 洋野階上道路. "Opening prospects for reconstruction roads and reconstruction support roads are "approximately 90% finalized"". ja. pdf. 28 October 2016. 22 March 2019.