San Juan–Chama Project Explained

San Juan–Chama Project
San Juan–Chama Project
Headerstyle:background:#ccf;
Labelstyle:background:#ddf;
Header1:General statistics
Label2:Begun
Data2:1951
Label3:Completed
Data3:1976
Label4:Dams and reservoirs
Data4:Heron
Nambe Falls
Blanco (diversion)
Oso (diversion)
Little Oso (diversion)
Header6:Operations
Label7:Storage capacity
Data7:403343acre feet
Label8:Annual water yield
Data8:110000acre feet
Label9:Land irrigated
Data9:92479acres
Belowstyle:background:#ddf;

The San Juan–Chama Project is a U.S. Bureau of Reclamation interbasin water transfer project located in the states of New Mexico and Colorado in the United States. The project consists of a series of tunnels and diversions that take water from the drainage basin of the San Juan River – a tributary of the Colorado River – to supplement water resources in the Rio Grande watershed. The project furnishes water for irrigation and municipal water supply to cities along the Rio Grande including Albuquerque and Santa Fe.

Background

Most major agricultural and urban areas in New Mexico today lie along the narrow corridor of the Rio Grande as it cuts across the center of this predominantly desert state. Spanish settlers arrived in the area in the late 1500s, followed by Mexican and American settlers in the 18th and 19th centuries, building large irrigation systems and diversion dams to allow agricultural production in the arid region. In the early 1920s, water supply in the Rio Grande basin was already severely stressed, and studies were conducted as to the feasibility of procuring additional water by transbasin diversion from tributaries of the San Juan River.[1]

The 1933–1934 Bunger Survey studied potential locations for diversions and storage reservoirs, and in 1939, the Rio Grande Compact was signed, dividing Rio Grande waters between Colorado, New Mexico, and Texas including allocations from a potential future diversion from the San Juan basin.[2] When the Upper Colorado River Basin Compact was established in 1948, it also included provisions for the tentative diversion project under its water allotment to New Mexico.[1] In the 1950s, post-World War II population growth in central New Mexico put even larger strains on the Rio Grande's water, and the need for a transbasin water project rose because water supplies in the area quickly became overallocated.[2]

Studies for the project continued through the early 1950s, but actual implementation languished until 1962 when Congress amended the Colorado River Storage Act of 1956, allowing the diversion of part of New Mexico's share of Colorado River basin waters into the Rio Grande basin.[3] The diversions proposed were for 235000acre feet per year from three tributaries of the San Juan River in Colorado: the Rio Blanco, Navajo and Little Navajo Rivers, to the headwaters of the Rio Chama, a major tributary of the Rio Grande. The project would be constructed in two phases.[1] [2] However, Reclamation ran into difficulties because the Navajo Nation asserted rights to about 900000acre feet of water from the San Juan River, which runs through their traditional lands. Resultantly, only the first phase of the project was ever constructed, delivering just under 47% of the original amount proposed by Reclamation.[2] [4]

On December 19, 1964, construction began on the Azotea Tunnel, the main water tunnel for the project, running from the Navajo River south to Azotea Creek in the Rio Chama watershed. Work started on the Oso and Little Oso tunnels in February 1966, and construction on the Blanco Tunnel began in March of the same year. In 1967, an enlargement of the outlets of existing El Vado Dam to accommodate increased flows from the diversion project was completed, and construction began on Heron Dam, which would impound the project's main storage reservoir.[1] Azotea Tunnel was holed through and construction was finished on the project's three diversion dams in 1970. Heron Dam was completed the next year. Nambe Falls Dam, completed in 1976, was the last part of the project to be built. The dam was the only one built of a series of small independent irrigation units originally proposed under the project to serve Native American lands. In 1978, Reclamation announced the completion of the San Juan–Chama Project.[2]

Project description

Diversion works

The San Juan–Chama Project taps the water of the Rio Blanco, Navajo, and Little Navajo Rivers via a series of small diversion dams, tunnels, and siphons. Blanco Diversion Dam, with a diversion capacity of 520cuft/s, sends water into the Blanco Feeder Conduit, which connects to the 8.64miles-long Blanco Tunnel and flows south towards the Little Navajo River. The water passes underneath the river via the Little Oso Siphon and connects to the Oso Tunnel. Just upstream from the siphon, Little Oso Diversion Dam sends up to 150cuft/s of water through the Little Oso Feeder Conduit, which also empties into the Oso Tunnel.[1]

Oso Tunnel, with a capacity of 650cuft/s, travels 5.05miles south to the Navajo River, which it passes under via the Oso Siphon. Oso Diversion Dam on the Navajo diverts additional water into the Oso Feeder Conduit, which joins with water from the Oso Tunnel and Siphon to form the Azotea Tunnel. The Azotea Tunnel, which has a capacity of 950cuft/s, runs south for 12.8miles, passing under the Continental Divide. The tunnel terminates at Azotea Creek, a tributary of Willow Creek, which is in turn a tributary of the Rio Chama. The lower portion of Azotea Creek has been channelized to mitigate erosion from the higher flows.[1]

Storage facilities

The main storage facility for the project is Heron Lake, a reservoir formed by Heron Dam on Willow Creek about 8miles downstream of the terminus of Azotea Tunnel and 20miles southwest of Chama, New Mexico. The reservoir has a capacity of 401320acre feet and has a surface area of 5950acres. Heron Dam is an earthfill dam 269feet high and 1220feet long, standing 249.1feet above the streambed. Heron Lake receives water from a catchment of 193mi2, which has been augmented to over three times this size by the San Juan–Chama diversions.[1] [5]

Nambe Falls Dam is located about 15miles north of Santa Fe on the Rio Nambe, a tributary of the Rio Grande. The dam and reservoir are functionally independent from the other facilities of the San Juan–Chama Project. The curved earthfill dam forms Nambe Falls Lake, which has a capacity of 2023acre feet and controls runoff from a catchment of 35mi2. Its main purpose is to provide irrigation water for about 2800acres in the Pojoaque Valley, which is situated west and downstream of the dam.[6]

Water allocations

Each year, a minimum of 86210acre feet of San Juan–Chama water is allocated as follows. Because annual diversions average about 110000acre feet, there is usually a surplus available for other uses along the river. About 75% of the water serves municipal and industrial uses; the remaining fourth furnishes irrigation supplies to approximately 92500acres of land along the Rio Grande and Rio Nambe. Surplus water is also used to maintain a permanent pool at the Cochiti Lake flood-control reservoir on the Rio Grande.

Water allocations of the San Juan–Chama Project
UserShare (acre feet)Percent
Albuquerque, New Mexico48,20055.91%
Middle Rio Grande Conservancy District20,90024.24%
Jicarilla Apache6,5007.54%
Santa Fe County, New Mexico5,6056.50%
Los Alamos County, New Mexico1,2001.39%
Pojoaque Valley Irrigation District1,0301.19%
Española, New Mexico1,0001.16%
Belen, New Mexico5000.06%
Los Lunas, New Mexico4000.05%
Taos, New Mexico4000.05%
Bernalillo, New Mexico4000.05%
Red River, New Mexico600.01%
Twining Water and Sanitation District150.01%

See also

Notes and References

  1. Web site: San Juan–Chama Project . U.S. Bureau of Reclamation . 2011-05-17 . 2012-01-02 . dead . https://web.archive.org/web/20120925123715/http://www.usbr.gov/projects/Project.jsp?proj_Name=San%20Juan-Chama%20Project . 2012-09-25.
  2. Web site: Glaser, Leah S.. San Juan–Chama Project. U.S. Bureau of Reclamation. 2012-01-02.
  3. Web site: The Colorado River Compact and the San Juan–Chama Project. The League of Women Voters of New Mexico. 2012-01-02.
  4. Web site: Shirley, Joe. Shirley Presses to Settle Unquantified Navajo Water Claims: Sustainable Water Vital to Navajos. Alpcentral. 2007-07-23. 2012-01-02.
  5. Web site: Heron Dam. U.S. Bureau of Reclamation. San Juan–Chama Project. 2008-10-30. 2012-01-02.
  6. Web site: Nambe Falls Dam. U.S. Bureau of Reclamation. San Juan–Chama Project. 2009-04-08. 2012-01-02.