Surf Line Explained

Surf Line
Type:Inter-city rail
Higher-speed rail
Commuter rail
System:Amtrak (through SCRRA)
NCTD
BNSF Railway
Locale:Southern California
Start:Los Angeles
End:San Diego
Stations:34 (11 Amtrak stations, 23 commuter rail stations)
Open:1882 (first section)
1885 (final section)
Owner:BNSF Railway (Los Angeles-Fullerton)
SCRRA (Fullerton-OC/SD County line)
NCTD (OC/SD County line-San Diego)
Operator:Amtrak (Amtrak California)
Metrolink
Coaster
Tracklength:128miles
Tracks:1-4
Electrification: (Los Angeles-Anaheim, 2030-2033)

The Surf Line is a railroad line that runs from San Diego to Orange County along California's Pacific Coast. It was so named because much of the line is near the Pacific Ocean, within less than in some places. It is the second busiest passenger rail corridor in the United States after the Northeast Corridor.

The tracks are now owned by the Orange County Transportation Authority and the North County Transit District, and hosts Metrolink's Orange County Line and Inland Empire–Orange County Line, the San Diego Coaster, and Amtrak Pacific Surfliner passenger trains. The BNSF Railway operates freight over the line using trackage rights.

History

Construction of the Surf Line between Los Angeles and San Diego began on October 12, 1880, with the organization of the California Southern Railroad Company. On January 2, 1882, the California Southern commenced passenger and freight service between National City and Fallbrook Junction, just north of Oceanside. From Oceanside the line turned northeast for a winding route through the Temecula Canyon, and was finished on August 21, 1882. The section through Del Mar was built in 1881 but was originally built on an alignment about a block inland from the ocean. It was moved to its current location, along the seaside bluffs, in 1910, because the grade was less steep and there were fewer crossings.[1]

The line became part of the Atchison, Topeka and Santa Fe Railroad's transcontinental rail line in 1885 via an extension of the California Southern from Colton north over the Cajon Pass to Barstow. From 1886 to 1888, the Riverside, Santa Ana and Los Angeles Railway built a branch from Highgrove southwest via Riverside to Santa Ana and from Orange (just north of Santa Ana) northwest to Los Angeles. Also in 1888 the San Bernardino and San Diego Railway completed its line from Oceanside north to Santa Ana, completing what was originally called the Los Angeles–San Diego Short Line. The now-downgraded old route was destroyed by floods in 1891 and the new line, later named the Surf Line, was now the only line to San Diego from the north.

In 1910, the Fullerton and Richfield Railway built a short cutoff of the San Bernardino–Los Angeles route from Atwood west to Fullerton, giving the Surf Line its northern terminus of Fullerton.

For much of the 20th century, the Surf Line (officially, the Fourth District of the Los Angeles Division) was to the Santa Fe what the New York City - Philadelphia corridor was to the Pennsylvania Railroad. Daily traffic could reach a density of ten trains (each way) during the summer months. The route hosted AT&SF San Diegan passenger trains, renamed the Pacific Surfliner by Amtrak in 2000.[2] The Santa Fe installed centralized traffic control in 1943–1944 which increased capacity on the line.

Santa Fe sold the line to local transportation authorities in 1992, with ownership split between the Southern California Regional Rail Authority in Orange County and the San Diego Northern Railway in San Diego County.[3]

Operations

The route is the southerly portion of the 351adj=midNaNadj=mid LOSSAN Rail Corridor between San Luis Obispo and San Diego. Local agencies along the route formed the Los Angeles–San Diego-San Luis Obispo Rail Corridor Agency (LOSSAN) in 1989.[4] Commuter trains began operating in the 1990s, initially as an outgrowth of existing Amtrak services until the establishment of Metrolink and Coaster by the California State Legislature in 1992.[5] Coaster runs within San Diego County, between San Diego and Oceanside, while Metrolink's services operate north of Oceanside. Amtrak's Pacific Surfliner travels throughout the corridor. The San Diego Trolley light rail shares the Surf Line's right of way in San Diego, running adjacent to the heavy rail tracks. For about a mile in Oceanside, the Sprinter service parallels the Surf Line before heading east on the Escondido Subdivision towards Escondido, California.

Freight traffic includes military vehicles and equipment to Camp Pendleton and the Navy ports in San Diego.[6] Due to passenger trains running on a daily schedule, BNSF manifest freight trains run through the Surf Line often at night, which is dubbed as the "Daygo".

The Surf Line is the second busiest rail corridor in the United States, after the Northeast Corridor between Washington D.C. and Boston, as the Surf Line hosts the Pacific Surfliner, the third busiest Amtrak route behind the Acela and Northeast Regional, which run on the Northeast Corridor. As trains on the Surf Line traverse speeds up to 90mph on portions of the route in Orange County and San Diego County, there are plans to upgrade tracks to Class 6 trackage, which can run at speeds of 110mph, when funding is available.

About two-thirds of the 60mile segment from the Orange County line to the Santa Fe Depot in downtown San Diego has been double-tracked. As one of the nation's busiest corridors, local transportation and planning agencies want to complete the entire section.[7] A 2.6mile section of double track between Elvira (SR 52) and Morena (Balboa Avenue) was completed in July 2020. The $192 million project, which began in August 2015, completed of double track from San Diego northward.[8]

The segment of the LOSSAN Corridor within San Diego County achieved full implementation of positive train control in December 2018, for all passenger and freight trains operating on this segment.[9]

Track issues

See also: North Coast Corridor. Due to its location along the beaches of Southern California, the line faces persistent issues due to sea level rise and coastal erosion, exacerbated by climate change. The tracks run atop coastal bluffs some above the beach for in Del Mar.[10] Another segment along the San Clemente coast on a low-lying section of track crosses an ancient, recurring landslide. Aggravated by storms and high tides, waves sometimes crash across these rails at high tide that are close to the surf on the narrow beach.[11] The eroding bluffs above the tracks in at least three locations require temporary closure of the tracks until conditions can be stabilized.[12]

Del Mar Bluffs

Coastal erosion eats away at the Del Mar bluffs each year and the rate has accelerated due to sea level rise due to climate change. The bluffs erode by about six inches every year. The bluff has had to be shored up to safely run current operations.[13] Steel beams were driven into the beach at the base of the bluff in September 2020 to stabilize the face of the bluff for 20 or 30 years. In August, the California Coastal Commission had emphasized the need to move the railroad tracks inland as they reviewed the emergency permits for the stabilization work. The San Diego Association of Governments (SANDAG) is conducting a $3 million study on relocating the rail line.[14] A tunnel under Del Mar, which would cost more than $3 billion, is under consideration.[15] In 2022, $300 million was included in the state budget for the SANDAG so that the project can compete for federal matching funds.[16] Local leaders, including SANDAG’s executive director, showed Secretary of Transportation Pete Buttigieg the coastal erosion at the bluffs in October 2022.[17] Del Mar City Council approved a list of guiding principles for the relocation on November 13, 2023.[18] More than a dozen possible routes for the tunnel have been considered by SANDAG. Residents have expressed concerns about the shortest and fastest routed that would take trains beneath residential properties.[19]

San Clemente beach

With extensive beach erosion, waves crashing over the rails damaged the tracks in San Clemente on September 15, 2021. The segment had to be shut down through October 3 as storms and high tideshad aggravated the situation.[20] [21] An extended closure occurred the next year when the segment was closed to passenger traffic on September 29, 2022 due to soil movement; freight traffic continued at lowered speed.[22] [23] Additional rock was added between the beach and the railroad tracks after each incident. The passenger rail traffic stop continued as anchors were being placed into bedrock.[24] The line fully reopened in April 2023 but rail service was halted again two miles to the north.[25] [26] Falling debris did not damage the tracks but ground movement continued from a landslide involving Casa Romantica on the bluff above.[27] Full service resumed in late May[28] but was halted indefinitely again in early June.[29] During the work closures, freight trains are able to resume at a speed of as officials were on site to clear them when it is safe to proceed.[30] [31] Orange County Transportation Authority (OCTA), which owns the section of track,[32] declared an emergency on June 12 to speed up construction of temporary barrier wall at the bottom of the slope.[33] The 250adj=midNaNadj=mid barrier is high with the piles set roughly into the ground.[34] Service resumed on July 19, 2023.[35] The bluffs can become unstable after a rainstorm soaks the slope.[36] Service was suspended on January 25, 2024, due to a landslide from private property north of the San Clemente Pier.[37] Two damaged sections of the Mariposa Pedestrian Bridge on the slope above the tracks had to be removed.[38] California Transportation Commission initially awarded $2 million to clean up the debris and added $7.2 million in February to help repair the rail line.[39] A barrier wall similar to the one at the Casa Romantica slide will be constructed.[40] Limited service through the landslide area resumed on March 6.[41] Full service then resumed on March 25.[42] OCTA says $7 million is needed to study realignment and other possible solutions to protect of the line along the shore.[43] [44] The first study, that started in August 2023, will identify the issues that impact the rail corridor, offer solutions to protect it, and develop the cost of the necessary improvements.[45]

Future

As stated above, sections of the Surf Line in Del Mar and San Clemente will be relocated inland from their current locations to reduce the amount of times of service disruption. This would mean that there would be tunnels inland in San Clemente and Del Mar. There have been plans to upgrade tracks to Class 5 trackage, in which passenger trains can reach up to speeds of . However, as of 2024, funding has yet to be available.

The California High-Speed Rail will run on a brief portion of the Surf Line between Los Angeles and Anaheim as part of its full Phase 1 route. Similarly, for Phase 2 of the California High-Speed Rail, the final portion of the route from Los Angeles to San Diego via the Inland Empire will parallel the Surf Line into San Diego from University City to either the San Diego International Airport, Old Town San Diego station, or Santa Fe Depot in San Diego. This plan for the CAHSR Phase 2 has yet to be finalized.

Historic station stops

Many, but not all of these stations currently operate. Many of these stations no longer exist (e.g. Linda Vista) and new ones have opened (e.g. Sorrento Valley). For a list of stations that currently operate, see the articles for Metrolink's Orange County Line and the Coaster or the templates to the right.

Key:OpenClosedProposed

See also

References

Journals

External links

Notes and References

  1. News: Diehl . Phil . Feb 10, 2024 . 'This project will happen.' Del Mar residents remain unhappy with plan for train tunnel . San Diego Union Tribune.
  2. Web site: Gabbard. Dana . History of the Surfliner, LOSSAN and a Look at Pending Legislation . StreetsBlog LA . OpenPlans . September 24, 2012 . 2015-03-27.
  3. News: Stein, Mark A. . Perlman, Jeffrey A. . June 19, 1992 . Santa Fe, Transit Officials Reach Rail Deal : Commuting: The $500-million agreement for 336 miles of track means expanded O.C. passenger service. . . live . https://web.archive.org/web/20141221135811/http://articles.latimes.com/1992-06-19/news/mn-707_1_santa-fe . December 21, 2014.
  4. Web site: San Luis Obispo Council of Governments. LOSSAN Corridorwide Strategic Implementation Plan, Final Report (April 2012). April 24, 2018. January 18, 2021. https://web.archive.org/web/20210118133410/https://www.sandag.org/uploads/projectid/projectid_260_14371.pdf. dead.
  5. Web site: Senate Transportation Subcommittee on LOSSAN Rail Corridor Resiliency, Monday, December 11, 2023. California State Senate. December 11, 2023. December 28, 2023.
  6. News: Diehl . Phil . 2022-11-29 . Freight traffic temporarily suspended at San Clemente railroad repair site as hillside continues to move . 2022-11-29 . San Diego Union-Tribune . en-US.
  7. News: Coastal Commission frowns on trenching idea for rail tracks atop oceanfront bluffs. Diehl. Phil. 2019-08-19. Los Angeles Times. en-US. 2019-08-19.
  8. News: SANDAG Completes Major Railway Project Connecting more than 14 Miles of Continuous Double Tracking . July 15, 2020 . Claremont Times.
  9. Web site: 2 July 2019. Positive Train Control (PTC) Fact Sheet. NCTD.
  10. Web site: Del Mar Bluffs Stabilization Project. 2020-10-25. SANDAG : San Diego's Regional Planning Agency. October 28, 2020. https://web.archive.org/web/20201028222408/https://www.sandag.org/index.asp?classid=13&subclassid=9&projectid=312&fuseaction=projects.detail. dead.
  11. News: Diehl . Phil . 2022-09-30 . Metrolink, Amtrak suspend train service to Oceanside because of unstable slope . 2022-10-02 . San Diego Union-Tribune . en-US.
  12. News: Diehl . Phil . 2024-02-09 . San Diego freight trains resume again as fixes explored for active San Clemente landslide . 2024-02-12 . Del Mar Times . en-US.
  13. News: Diehl. Phil. 2020-10-25. California opposes district's bid to control Del Mar bluffs, erect chain-link fence. 2020-10-25. Los Angeles Times. en-US.
  14. News: Little. Joe. September 22, 2020. Steel Beams Installed to Reinforce Del Mar Beach Bluffs . 2020-09-24. NBC 7 San Diego. en-US.
  15. News: Diehl. Phil. 2020-08-16. State Coastal Commission says Del Mar train tracks need to move inland. 2020-08-16. San Diego Union-Tribune. en-US.
  16. News: July 5, 2022 . California to provide $300 million for relocation of rail line off Del Mar Bluffs . 2022-07-06 . Trains . en-US.
  17. News: Fleming . Omari . October 25, 2022 . Secretary of Transportation Pete Buttigieg Tours San Diego's Bluff Erosion by Train . 2022-11-02 . NBC 7 San Diego . en-US.
  18. News: 2023-11-27 . Nearly a dozen routes eyed for Del Mar train tunnel. 'We have an obligation to maintain this rail corridor.' . 2023-11-28 . Del Mar Times . San Diego Union-Tribune . en-US.
  19. Web site: Diehl . Phil . 2024-03-04 . Del Mar may create task force to monitor plans for railroad tunnel . 2024-03-05 . San Diego Union-Tribune . en-US.
  20. News: 2021-09-21. Beach-bluff homes, lot cracking near damaged train track in San Clemente. 2021-09-23. Orange County Register. en-US.
  21. News: Diehl. Phil. 2021-09-16. Metrolink suspends rail service to Oceanside to make emergency repairs. 2021-09-23. San Diego Union-Tribune. en-US.
  22. Web site: 2022-09-29. Service Update. 2022-09-30. Metrolink. en-US. September 30, 2022. https://web.archive.org/web/20220930171954/https://metrolinktrains.com/service-update. bot: unknown.
  23. News: 2022-09-30. Unstable slope stops coastal train service for up to 60 days. 2022-10-01. KPBS. en-US.
  24. News: Diehl . Phil . November 11, 2022 . Bluff continues to move at San Clemente rail site where repairs shut down service to San Diego . 2022-11-11 . The San Diego Union-Tribune . Los Angeles Times . en-US.
  25. News: Diehl . Phil . 2023-04-28 . New landslide closes railroad tracks at San Clemente, again halting link to San Diego . 2023-04-29 . Los Angeles Times . en-US.
  26. News: Diehl . Phil . 2023-04-10 . Metrolink, Amtrak to resume full service from Orange County to San Diego County next week . 2023-04-11 . Los Angeles Times . en-US.
  27. News: 2023-04-28 . California landslide halts rail service, homes evacuated . 2023-04-28 . KPBS Public Media . en.
  28. News: Lester . David C. . 2023-05-30 . Rail Service, Including Metrolink, Pacific Surfliner, Cleared to Resume Through San Clemente . 2023-06-01 . Railway Track and Structures . en-US.
  29. News: 2023-06-05 . Rail service halted again because of landslides on coastal tracks between San Diego and Los Angeles . 2023-06-09 . AP News . en.
  30. News: San Román . Gabriel . 2023-05-16 . After landslide, an Orange County beach town finds itself between a bluff and a hard place . 2023-05-18 . Los Angeles Times . en-US.
  31. News: González . David . 2023-06-10 . Rail service slowly getting back on track after landslide in San Clemente . 2023-06-10 . ABC7 Los Angeles . en.
  32. News: 2022-11-20 . Train service through San Clemente will remain shut down through February as rail line repairs begin . 2022-11-21 . ABC7 Los Angeles . en.
  33. News: Schlepp . Travis . 2023-06-12 . Orange County Transportation Authority declares emergency over threatened railroad track . 2023-06-13 . KTLA . en-US.
  34. News: Dawson . Danielle . 2023-07-11 . Amtrak, Metrolink service to resume after second landslide . 2023-07-12 . FOX 5 San Diego . en-US.
  35. News: Diehl . Phil . 2023-07-11 . Passenger trains to resume Monday between San Diego and Orange counties . 2023-07-15 . San Diego Union-Tribune . en-US.
  36. News: Conybeare . Will . Ramos . Annie Rose . 2024-01-29 . Approaching storm poses new landslide threat to Orange County rail line . 2024-01-29 . KTLA . en-US.
  37. News: Landslide in San Clemente damages bridge and halts train service . January 25, 2024 . NBC Los Angeles . Karla . Rendon . January 25, 2024.
  38. News: Miller . Daniel . 2024-01-27 . No timetable for reopening train service through San Clemente amid landslide cleanup . 2024-01-28 . Los Angeles Times . en-US.
  39. News: 2024-02-19 . Orange County gets $7M+ to repair rail line damaged by landslide . 2024-02-20 . ABC7.
  40. News: Aere . Jacob . 2024-02-21 . Barrier wall to be constructed where landslide stopped rail service in San Clemente . 2024-02-21 . KPBS Public Media . en.
  41. Limited Amtrak Pacific Surfliner Rail Service Set to Resume Through San Clemente on Wednesday . March 5, 2024 . LOSSAN Rail Corridor Agency.
  42. News: 2024-03-19 . Rail service through San Clemente to resume Monday . 2024-03-26 . KPBS Public Media . en . City News Service.
  43. News: Diehl . Phil . 2023-02-28 . Agency wants to study railroad relocation to protect endangered tracks in southern Orange County . 2023-02-28 . San Diego Union-Tribune . en-US.
  44. News: Connelly . Laylan . 2023-03-10 . As coastal train track is repaired, OCTA hopes $5 million study will help find longer term fixes . 2023-03-14 . Orange County Register . en-US.
  45. Web site: Ireland . Elizabeth . 2023-08-15 . OCTA Launches Engineering Study on Threats to Rail Service to San Diego . 2023-08-16 . Times of San Diego . en-US.
  46. News: Amtrak station opens . The San Bernardino County Sun. July 29, 1993. 9. Newspapers.com.
  47. News: July 18, 1995 . Metrolink Station Opens . 23 . . Newspapers.com.
  48. News: Santa Ana : Officials Dedicate Transportation Center. Los Angeles Times. September 8, 1985. Andy . Rose. 19 December 2015.
  49. News: New Metrolink Station to Debut Today in Tustin . Morin . Monte . January 18, 2002 . Los Angeles Times . July 5, 2019 . en-US . 0458-3035.
  50. Web site: The Atchison, Topeka and Santa Fe Railway System Time Tables . Streamliner Memories . 9 March 2024 . 1939. Santa Fe Railway. 42.
  51. Web site: Santa Fe System Timetables (PDF) . 1961 . Santa Fe Railway . Streamliner Memories . . 9 March 2024 . 22.
  52. News: McKibben . Dave. Laguna Niguel/Mission Viejo Metrolink Depot Set to Debut . Los Angeles Times. April 17, 2002. 11. Newspapers.com. July 5, 2019 .
  53. Web site: Time Tables - The Atchison, Topeka and Santa Fe Railway System . 9 March 2024 . 1948. Santa Fe Railway. 24.
  54. News: Bradley, Jr. . Tom . High Hopes Ride Aboard Coaster . March 13, 2022 . The North County Times . February 26, 1995 . . B1, B8. Newspapers.com.
  55. Web site: National Park Service (NPS) Digital Asset Management System . Carlsbad Santa Fe Depot .
  56. Web site: Time Tables - The Atchison, Topeka and Santa Fe Railway System . 9 March 2024 . 1953. Santa Fe Railway. 24.
  57. News: Eyerly . Alan . Timetable Changes for Amtrak's San Diegan . March 13, 2022 . . February 4, 1994 . B3. Newspapers.com.
  58. Web site: Transit and Intercity Rail Capital Program Sixth Round Selected Projects – Project Detail Summary . . 11 October 2023 . 11 . April 24, 2023.
  59. News: Showley . Roger . March 3, 2015 . Santa Fe Depot at 100: Tiles, tourists and skyscrapers . . March 6, 2015.
  60. Web site: Diehl . Phil . June 27, 2021 . Transit district to increase Coaster commuter train service this fall . live . https://web.archive.org/web/20210627131516/https://www.sandiegouniontribune.com/communities/north-county/oceanside/story/2021-06-27/transit-district-to-increase-coaster-commuter-train-service-this-fall . June 27, 2021 . October 11, 2023 . San Diego Union-Tribune . en-US.
  61. Web site: Time of Trains, Sleeping Car Schedules, and Other Information. 7 June 2024 . 33 . 20 October 1913.
  62. Web site: Santa Fe Railway Timetable . August 1926.