Saitama Railway line | |
Color: | 0000CD |
Logo Alt: | Saitama Rapid Railway Logo |
Image Alt: | Saitama Rapid Railway train |
Type: | Rapid transit |
Locale: | Tokyo, Saitama Prefecture |
Stations: | 8 |
Open: | 28 March 2001 |
Owner: | Saitama Railway Corporation |
Depot: | Urawa-Misono |
Linelength Km: | 14.6 |
Tracks: | 2 |
Minradius: | 248 m |
Electrification: | 1,500 V DC overhead line |
Speed: | 80abbr=onNaNabbr=on |
Map State: | collapsed |
The is a mostly underground rapid transit line in Japan operated by the third sector operating company Saitama Railway Corporation. Funded by Saitama Prefecture, local municipal governments, and Tokyo Metro, it forms a continuation of the Tokyo Metro Namboku Line, starting at Akabane-iwabuchi Station in Tokyo and ending at Urawa-Misono Station in Saitama.[1] The line is used as the main means of transportation to Saitama Stadium 2002. On 27 November 2015, the route was nicknamed the "Saitama Stadium Line". The line symbol used in the station numbering is "SR".
This line allows trains from the Tokyo Metro Namboku Line to operate beyond Akabane-iwabuchi Station into Saitama Prefecture and ending at Urawa-Misono Station.
Most of the line is underground, only Urawa Misono Station and adjacent depots are on the surface. It connects the eastern and northern part of Kawaguchi to Tokyo; areas that were previously only served by buses.
Planning for the line stated in 1972 as an extension of the Tokyo Metro Namboku Line. The original alignment was planned to serve eastern Urawa and central Kawaguchi in Saitama. In 1985, the alignment was shifted east to Hatogaya. In 1992, the third sector Saitama Railway Corporation was established by Saitama Prefecture, and construction began in 1995. The line opened on 28 March 2001, ahead of the 2002 FIFA World Cup, which held several matches at the Saitama Stadium, half an hour on foot from the terminating Urawa-Misono Station.
The total cost of construction is 256.1 billion yen, making the cost per kilometer at 17.5 billion yen. Since its opening, the line used six-car trains with all stations (except Urawa-Misono Station) equipped with platforms long enough support future expansion into eight-car trains. Urawa-Misono Station was built as a temporary terminal as the line was planned to be extended further north in the future so it only has platforms long enough for six car trains.
A further northern extension beyond Urawa Misono Station connecting Iwatsuki Station of the Tobu Urban Park Line and Hasuda Station of the JR Utsunomiya Line (Tohoku Line) is currently being proposed.
No. | Stationcolor | Station | Japanese | Distance (km) | Transfers | Location | |
---|---|---|---|---|---|---|---|
↑ Through-running to/from ↑
for for Sōtetsu Izumino Line for (via on the Sōtetsu Main Line) | |||||||
- | 赤羽岩淵 | 0.0 | Kita | Tokyo | |||
| 川口元郷 | 2.4 | Kawaguchi | Saitama Prefecture | |||
| 南鳩ヶ谷 | 4.3 | |||||
| 鳩ヶ谷 | 5.9 | |||||
| 新井宿 | 7.5 | |||||
| 戸塚安行 | 10.0 | |||||
| 東川口 | 12.2 | Musashino Line | ||||
| 浦和美園 | 14.6 | Midori-ku, Saitama | ||||
As of 2013, the main shareholders in Saitama Railway Corporation are as follows.[1]
Shareholder | Percentage | ||
---|---|---|---|
align = right | 45.0 | ||
align = right | 19.4 | ||
align = right | 18.7 | ||
align = right | 7.1 |
Ridership figures for the line are as follows.[1]
Fiscal year | Total passengers | Passengers/km day | |||
---|---|---|---|---|---|
2009 | align = right | 30.564 million | align = right | 40,038 | |
2010 | align = right | 31.051 million | align = right | 40,770 | |
2011 | align = right | 30.983 million | align = right | 40,546 |
The third sector company, Saitama Railway Corporation, was established on 25 March 1992.[1]
The entire line from Akabane-Iwabuchi to Urawa-Misono opened on 28 March 2001.
Through services to and from on the Tokyu Meguro Line commenced on 22 June 2008.
On 1 April 2022, eight-car trains began operating on the line.[2]
Effective the timetable revision on 18 March 2023, the Sotetsu Shin-Yokohama Line and Tokyu Shin-Yokohama Line began revenue service. Most through services originating from Urawa-Misono continuing onto the Sotetsu Line terminate at either Shin-Yokohama Station or Ebina Station.[3]
In the future, the line may be extended north from Urawa-Misono through Iwatsuki-ku, Saitama to Hasuda Station (in Hasuda, Saitama) on the JR East Utsunomiya Line, but financial problems have prevented construction of the extension.