Canal Saint-Denis Explained

Canal Saint-Denis
Canal Length:6.6km (04.1miles)
Max Boat Beam:8m (26feet)
Max Boat Draft:2.6m (08.5feet)
Min Boat Air Draft:4.4m (14.4feet)
Original Num Locks:12
Current Num Locks:7
Date Approved:1802
Date Completed:1821
Start Point:Bassin de la Villette
Connects To:Canal de l'Ourcq

The Canal Saint-Denis is a canal in Paris, France that is 6.6km (04.1miles) in length. The canal connects the Canal de l'Ourcq, at a point north-northwest of the Bassin de la Villette in the 19th arrondissement, with the suburban municipalities of Saint-Denis and Aubervilliers in the department of Seine-Saint-Denis. There are seven locks along the canal's route, and, near Saint-Denis, the canal discharges into the Seine.[1]

In 1802 Napoléon Bonaparte issued a decree for the construction of the canal to both expedite shipping and reduce the number of ships and barges sailing up and down the Seine through the center of Paris. Contracts to build and operate the canals in the Île-de-France were granted to private banking firms. These contracts required the city of Paris to purchase land, and the merchant-bankers who won the contracts, Roman Vassal, Lafitte, André, and Cottier, were expected to construct the waterways. As compensation for their large outlays, the bankers were permitted to collect tolls on the canal for a term of ninety-nine years. The canal was completed in 1821.

The canal is part of the Réseau des Canaux Parisiens (Parisian Canal Network), a public-works authority operated by the city. The other components of the network are the Canal de l'Ourcq, the Bassin de la Villette, the Canal Saint-Martin, and the Bassin de l'Arsenal. Together, these canals and basins extend over a distance of 121km (75miles).

History

Napoléon Bonaparte ordered the creation of a Parisian canal network on May 19, 1802. Specifically, he decreed that the Seine be diverted from below the Bassin de l'Arsenal to the Bassin de la Villette. The canal would continue through Saint-Denis to rejoin the Seine in order to avoid having a shipping canal pass through the center of Paris. Additionally, the new canal would expedite navigation by avoiding the Seine's meandering turns.

Private financiers were awarded the contracts to construct and manage the canals. The city of Paris agreed to purchase the land and surrender the tolls for 99 years in order that the firms build the canals. (The cost of construction was estimated at 6 million francs.) Work began in 1805 under Édouard de Villiers du Terrage. In May 1821, the canal opened, having expended less than its allotted budget.[2] [3] At its creation, the canal had twelve locks with an overall change in level of 28.34m (92.98feet).

Between 1890 and 1895, the canal was reconstructed and enlarged in order to permit the passage of wider-beamed barges, and the number of locks was reduced from twelve to eight. The first lock was named Écluse du Pont de Flandre ("Flanders Bridge Lock"), and it alone covered 10m (30feet) of lift, replacing four of the older locks. In 2008, the canal was composed of seven locks.

Since 1983, the canal has been open to pleasure craft.

Technical specifications and navigation

The Canal Saint-Denis extends 6.6 km from the junction with the Canal de l’Ourcq at the Bassin de la Villette to the Seine at Saint-Denis. It is the busiest of the three canals in Paris, passing through predominantly industrial suburbs, with numerous private quays used by commercial barges.[4]

The canal has an average width of 70m (230feet), ranging from 30m (100feet) to 140m (460feet). The canal covers roughly 36 hectares of Parisian public space. The waterway is open 365 days a year and, together with the Canal de l'Ourcq and the Canal Saint-Martin, carries between 500,000 and 1 million tons of materials and merchandise per year. The depth of the canal varies from 3.2m (10.5feet) to 3.5m (11.5feet). This allows barges and other craft up to a maximum of 1,000 tons displacement. Vessels may travel the canal if their beam is less than 8m (26feet), their air draft less than 4.4m (14.4feet), and their draft less than 2.6m (08.5feet). Launching slipways are located at the Pont de Stains in Aubervilliers (source Ville de Paris, Service des Canaux, within the Direction de la Voirie et de la Mobilité, quoted on the French page).

Tourism and management

Management

In a study by the architect, Michel Corajoud, the canal has been recognized as a unifying factor in the Parisian urban area. This devolves from the fact that the canal links Paris with Aubervilliers and Saint-Denis. It is a part of the Communauté de communes de la Plaine de France, a federation of communities organized to coordinate local projects.

Recently, the following improvements to the canal network have been undertaken:

Most of the plans, inaugurated at the Seine nautical festival in 2006, have been fulfilled. However, a 1.6km (01miles) section remains to be finished, but was expected to be complete by 2012.[6]

Points of interest

The canal passes by a number of places that may be of interest to tourists:

External links

48.9°N 25°W

Notes and References

  1. Book: Cruising French Waterways. Hugh McKnight. Sheridan House, Inc. 2005. 978-1-57409-210-3. 67.
  2. Book: Planning the French Canals: Bureaucracy, Politics, and Enterprise Under the Restoration. Reed G. Geiger. University of Delaware Press. 1994. 978-0-87413-527-5. 156.
  3. Web site: Structurae [en]

    Canal Saint-Denis ]

    . 14 September 2008 .
  4. Book: Edwards-May, David. Inland Waterways of France. Imray. 2010. 978-1-84623-014-1. St Ives, Cambs., UK. 90–94.
  5. There are future plans for the route to become part of a proposed Paris-to-London bicycle path;
  6. Le Moniteur des travaux publics et du bâtiment, 11 juillet 2008