Saigon Bridge Explained

Bridge Name:Saigon Bridge
Native Name:Cầu Sài Gòn
Crosses:Saigon River
Locale:Ho Chi Minh City, Vietnam
Designer:Drake and Piper Johnson
Material:concrete
Length:1010m (3,310feet)
Width:26m (85feet)
Open:June 28, 1961
Coordinates:10.7989°N 106.7272°W

Saigon Bridge, known as Newport Bridge (Vietnamese: Cầu Tân Cảng) before 1975, is a bridge crossing the Saigon River, connecting Bình Thạnh District and District 2, Ho Chi Minh City, on the Hanoi Highway. The bridge has four lanes for cars and two lanes for motorcycles and bicycles. It was the only bridge linking District 1 to the new Thu Thiem New Urban Area in District 2 until the Thủ Thiêm Bridge opened in 2008 and the Saigon River Tunnel opened in 2011. The bridge was one of the most vital gateways for vehicles traveling from northern and central Vietnam to the city, and therefore was a key point of contention during the Tet Offensive in 1968 and the Fall of Saigon in 1975. In 2013, a new parallel bridge, Saigon 2 Bridge, was opened to ease congestion on the bridge.[1]

Vietnam War

On 5 May 1968 during the May or "mini-Tet" Offensive, a 300-man Vietcong (VC) regiment attacked the bridge and the adjacent Newport dock facility but were driven off by Army of the Republic of Vietnam (ARVN) forces.[2] On the morning of 12 May VC gunners from the 4th Thu Duc Battalion scored a direct hit on the bridge with a recoilless rifle, sending a chunk of steel-reinforced concrete almost sixty meters long and half the width of the bridge crashing into the river. The VC then promptly packed up his weapons and hustled away before helicopter gunships could retaliate. For the Allies, the damage inflicted on the bridge proved to be little more than an inconvenience. The temporary loss of one lane did not seriously impede traffic, and over the next four weeks engineers repaired the otherwise intact bridge.[3]

By 28 April 1975 as the People's Army of Vietnam (PAVN) continued their advance on Saigon, the Vietcong seized the Thảo Điền area at the eastern end of the bridge and attempted to seize the bridge but were repulsed by the ARVN 12th Airborne Battalion.[4] On the morning of 30 April PAVN sappers attempted to seize the bridge but were repulsed by the ARVN Airborne. At 09:00 the PAVN tank column approached the bridge and came under fire from ARVN tanks which destroyed the lead T-54, killing the PAVN Battalion commander. The ARVN and PAVN continued to exchange tank and artillery fire until 10:24, when the ARVN commander received President Dương Văn Minh's capitulation order over the radio. While the bridge was rigged with approximately 4000lbs of demolition charges, the ARVN stood down and at 10:30 the PAVN column crossed the bridge.[5]

Saigon 2 Bridge

Saigon 2 Bridge (Vietnamese: Cầu Sài Gòn 2) is a bridge crossing the Saigon River, connecting Bình Thạnh District and District 2, Ho Chi Minh City, Vietnam, on the Hanoi Highway. It is parallel to the Saigon Bridge, being 3 metres south of it and carrying traffic in the eastern direction. Congestion on the old Saigon Bridge required increased traffic capacity, with the new bridge doubling the number of lanes, carrying another 4 lanes plus a 2 lanes for motorbikes. The cost of the bridge was .[6] Construction started in April 2012, and the bridge was opened for traffic in October 2013.[7]

External links

Notes and References

  1. Web site: HCMC-based Saigon 2 Bridge opened to traffic. 15 October 2013.
  2. Book: Cash, John. Seven Firefights in Vietnam. DIANE Publishing. 1985. 9781568065632. 140.
  3. Book: Villard, Erik. United States Army in Vietnam Combat Operations Staying the Course October 1967 to September 1968. Center of Military History United States Army. 2017. 9780160942808. 575.
  4. Web site: Saigon Hears the Fighting at Its Edge. The New York Times. 28 April 1975. 25 September 2016.
  5. Book: Veith, George. Black April The Fall of South Vietnam 1973-75. Encounter Books. 2012. 9781594035722. 492.
  6. Web site: Saigon 2 Bridge -.
  7. Web site: HCMC-based Saigon 2 Bridge opened to traffic. 15 October 2013.