Sadarmat Barrage Explained

Name Official:Sadarmat Barrage
Builder:Bhrunda Infra Private Limited & Siri Constructions Infrastructure Private Limited (Joint Venture)
Operator:Irrigation & CAD Department, Government of Telangana
Sadarmat Barrage
Location Map Caption:Sadarmat Barrage at Ponkal
Coordinates:78.5711°N 18.9911°W
Location Map:India Telangana#India
Construction Began:11 January 2017
Res Capacity Total:1.6 TMC
Opening:2021
Owner:Government of Telangana
Cost:520 Crores
Status:UC
Purpose:I
Spillway Count:55 gates
Dam Type:Barrage
Location:Ponkal village, Mamda mandal, Nirmal district, Telangana
Res Name:Sadarmat Reservoir
Dam Crosses:Godavari River
Country:India

Sadarmat Barrage[1] [2] [3] [4] is an under-construction barrage across Godavari River at Ponkal village, Mamda mandal, Nirmal district of Telangana State. This barrage is situated 32 km downstream of Sriram Sagar Project, on the Godavari river and about 7 km upstream of Sadarmat Anicut. The project will provide irrigation facilities for an ayacut of 20,000 acres in Nirmal district of Telangana State.

History

In 1891[5] under the rule of Prime Minister of Hyderabad, Viqar-ul-Umra, Sadarmat Anicut was constructed by the french engineer JJ Ottley at Khanapur mandal in the erstwhile Adilabad district. It's a masonry structure with 2 meters height with a length of 437.4 metres on the left flank and 23.8 metres on the right flank. The estimated cost for construction, then, was about 1 Lakh Indian rupees.

The Sadarmat Anicut has no reliable storage and thus agricultural lands can be irrigated only when there are flows from upper stretches of Godavari river. Sadarmat Barrage will create a pondage of 1.6 TMC, which will create additional ayacut of 20,000 acres as well as stabilise the existing ayacut of 18,000 acres under Sadarmat Anicut.

The foundation stone for construction of the barrage was laid by the Irrigation Minister for Telangana, T. Harish Rao with an estimated construction cost of 520 crores on January 11, 2021.

As part of Sri Ram Sagar Project (SRSP) Rejuvenation Scheme,[6] three house pumps will lift 60 TMC water from the Kaleshwaram Lift Irrigation Project and fill the Sriram Sagar Project project in 69 days, through SRSP Flood Flow Canal. Water from Sriram Sagar Project can be released to Sadarmat Barrage and Sadarmat Anicut via Gravity as it is situated at the downstream of the project. This will provide reliable water supply to ayacut of Sadarmat Barrage and Sadarmat Anicut, even during the drought season in the upper stretches of Godavari.

Notes and References

  1. Web site: Govt Moots Sadarmat Mini-barrage in A'bad. 2021-01-25. The New Indian Express.
  2. Web site: India. The Hans. 2019-12-24. Speed up Sadarmat barrage works: CMO Secretary Smitha Sabharwal. 2021-01-25. www.thehansindia.com. en.
  3. Web site: Implementation of Sadarmatt barrage scheme in Adilabad district - PPP in India. dead. https://web.archive.org/web/20230517190928/https://www.pppinindia.gov.in/infrastructureindia/web/guest/view-project?p_p_id=viewproject_WAR_Projectportlet&p_p_lifecycle=0&p_p_state=pop_up&p_p_mode=view&p_p_col_id=column-1&p_p_col_count=1&_viewproject_WAR_Projectportlet_jspPage=/html/viewproject/non_ppp_all_info.jsp&_viewproject_WAR_Projectportlet_sessionId=27454. May 17, 2023. January 25, 2021. Department of Economic Affairs, Ministry of Finance, Government of India.
  4. Web site: Laying Foundation Stone For Sadarmatt Barrage :Nirmal - Harish Rao Thanneeru. 2021-01-25. www.facebook.com. en.
  5. Web site: Santosh. Padala. Living up to expectations after 127 years. 2021-01-25. Telangana Today. en-US.
  6. Web site: M. Shyam Kumar. SRSP rejuvenation works on track. 2021-01-25. Telangana Today. en-US.