SaS group Tower explained

SaS group Tower
Location:Most, Czech Republic
Status:Complete
Start Date:1977
Completion Date:1984
Opening:1984
Roof:100m (300feet)
Top Floor:96m (315feet)
Floor Count:25
Architect:Václav Krejčí, Jiří Fojt, Míťa Hejduk
Owner:SaS Energo s.r.o.

SaS group Tower (formerly SHD Komes) is a high-rise in Most, Czech Republic. With a height of 96 metres it is the tallest building in Ústí nad Labem Region and the fourth tallest building in the Czech Republic. Construction of the building commenced in 1977 and finished in 1984. The building was used as the headquarters of Severočeské hnědouhelné doly. This company was one of the largest producers of lignite in Czechoslovakia. After 1989, SD-Comes a.s. became the new owner of the building. In 2012, the owner SD - KOMES a.s. sold the building[1] for CZK 73.5 million[2] to SaS ENERGO s.r.o.

External links

50.5061°N 13.6428°W

Notes and References

  1. Web site: Mostecký mrakodrap kupuje od dolů místní podnikatel Smolík. 2012. cs. 2012-05-13.
  2. Web site: Mostecký mrakodrap SHD Komes zřejmě koupil podnikatel Smolík. 2012. cs. 2012-05-13.