S2 highway (Georgia) explained

Country:GEO
Type:A
Route:2
Alternate Name:Senaki-Poti-Sarpi
Map:Georgia S2 International Road.svg
Photo Notes:Kobuleti bypass near Shuagele
Length Km:119
Length Ref:[1]
Established:1996
Direction A:North
Terminus A:Senaki
Junction:(km)   0 S1
       to Tbilisi / Zugdidi

  46 S12 to Samtredia

  73 Sh2 to Ozurgeti

  90 Sh205 to Chakvi

105 Sh1 to Akhaltsikhe

Direction B:South
Terminus B:Sarpi
Municipalities:Senaki, Khobi, Poti, Lanchkhuti, Ozurgeti, Kobuleti, Batumi, Khelvachauri
Cities:Senaki, Poti, Kobuleti, Batumi

The Georgian route S2 (Georgian: საერთაშორისო მნიშვნელობის გზა ს2, Saertashoriso mnishvnelobis gza S2, road of international importance), also known as Senaki-Poti-Sarpi (Turkish border), is a "road of international importance" within the Georgian road network which runs from Senaki via Poti, Kobuleti, and Batumi to the border with Turkey near Sarpi (Adjara) with a length of 119km (74miles). After crossing the Georgian-Turkish border the highway continues as D.010 ("Black Sea Coastal Road") to Trabzon. The S2 highway is part of European E60, E70, E97 and Asian AH5 routes and is mostly built as a 2-lane road through villages, towns and cities. Part of the highway has been upgraded in recent years to a single carriageway with hard shoulder bypassing residential communities.

Background

Since a 1960 Soviet decree the Kobuleti-Batumi section of the current S2 was part of Soviet main road 19, one of only 37 listed routes in the Soviet Union, which ran between Novorossiysk and Batumi via Samtredia and Ozurgeti.[2] The Samtredia-Ozurgeti-Kobuleti part of this route 19 followed the current Sh2 route. In 1982 the Soviet road numbering system was overhauled and the foundation of the current S2 was laid: the A-305 number was designated to Mikha Tskhakaya (Senaki) - Batumi via Poti.[3]

After Georgia regained independence in 1991, the A-305 designation was maintained until 1996 when the current route numbering system was adopted. In that year the "roads of international importance" (S-)category was introduced and the "ს2 Senaki-Poti-Sarpi (Turkish border)" replaced the A-305 number.[4] Compared to the A-305 the S2 route was extended from the north side of Batumi through the city to the Turkish border at Sarpi. Initially the road was registered with a length of 121km (75miles) km, but the opening of the Chakvi-Makhinjauri tunnel north of Batumi reduced the length reduced to 119km (74miles).[5]

The S2 highway is built as a simple two lane road, but parts have been and will be upgraded to higher standards within the scope of the 2005 initiated East-West Highway project. In a separate project, the dual tube four lane 650 m Chakvi-Makhinjauri tunnel which bypasses a curvy section of the highway was the first major upgrade to the S2 highway. It was completed in September 2005. The construction of the tunnel initially started in 2001, but came to a halt in April 2004 due to Adjara crisis in that period. The crisis resulted in the central government of Georgia regaining authority over the Autonomous Republic of Adjara, the location of the tunnel. In spring 2005 works resumed.

East-West Highway

In 2005 the Georgian government initiated the East-West Highway project, an ambitious internationally sponsored long term project which aims to create a 455km (283miles) east-west transport corridor through Georgia, connecting Azerbaijan and Armenia with Turkey by upgrading Georgian sections of the E60 (Poti-Tbilisi-Red Bridge, Azerbaijan) and E70 (Poti-Batumi-Sarpi, Turkey) highways to strengthen Georgia's position as South Caucasus transport hub.[6]

The East-West Highway project includes redesign of major sections of the Georgian S1, S2, S4, S12 and more recently the S7 highway,[7] to grade-separated highways, mostly as 2x2 expressway or motorway. Since 2006 nearly 200km (100miles) of Georgian highways has been realigned and upgraded to expressway or motorway standards, while parts of the S2 have been realigned as two-lane expressway within this project.

Despite earlier political promises the East-West Highway would be finished by 2020,[8] the construction of crucial sections, including the S2 highway, is still ongoing (as of 2021) until at least 2024. The project is sponsored by European and Asian development banks, the World Bank, European Union and others, with credits amounting to more than $2 billion for the S1 upgrades alone (plus additional state funding), while the S2 upgrades amount to $800 million. Construction companies from various European and Asian countries have been involved, with mixed success. Some tenders ran into technical and legal issues, with some contracts having been terminated by the Georgian government due to excessive underperformance of the contracted party, resulting in multiple year delays on various lots.[9] [10]

For the S2 highway the (E60/E70) East-West Highway project is scoped to the 73km (45miles) Grigoleti - Sarpi, Georgia section. As early as 2005 the Georgian government identified and studied the need for bypasses around Kobuleti and Batumi for a better traffic flow in connection with the S12 Samtredia — Grigoleti.[11] This means that most of the new Grigoleti to Sarpi section has been redesigned inland, bypassing towns and villages. The project envisions to upgrade the S2 between Grigoleti and Shekvetili as extension of the S12 to (2x2) expressway/motorway standards and the Kobuleti and Batumi Bypasses as two-lane expressway.

Grigoleti — Shekvetili - The 14km (09miles) between Grigoleti (S12) and Shekvetili (north end Kobuleti Bypass) has been under construction since 2019 as a 2x2 motorway,[12] but completion has been delayed with an unknown period.[13] The connection of the S2 with the S12 (under construction as 2x2 motorway) will be moved to the southside of the Supsa river mouth for a seamless flow of the S12 into the S2 in southern direction. In december 2022 the southern 5km (03miles) near Shekvetili was opened as motorway. This part connects to the Kobuleti Bypass.[14]

Kobuleti Bypass - In 2018 the 30km (20miles) long Kobuleti Bypass between Shekvetili and Chakvi has been completed as a two-lane expressway with hard shoulders, bypassing the popular Kobuleti resort and other villages, running inland away from the coastline.[15] The old route of the S2 along the Black Sea coast between Shekvetili and Chakvi via Kobuleti town has been renumbered as Sh205.

Batumi Bypass - Since 2018 the 16km (10miles) long Batumi Bypass between the Chakvi-Makhinjauri tunnel near Mtsvane Kontskhi and the Chorokhi River is under construction through mountainous terrain. Similarly to the Kobuleti Bypass, this will be a two-lane expressway featuring 19 bridges, 4 interchanges and 5 tunnels. With over a year delay, this is set to be finished by 2022 according to government sources.[16] [17]

Batumi — Sarpi - The 12km (07miles) Batumi (Chorokhi) - Sarpi section was under study in 2018.[18] No further plans have been developed, yet funding via the Asian Development Bank has been secured for $200 million.[19] The steep cliffs along the Black Sea coast leaves little room for expansion of the road.

Below is an overview of S2 sections that have been or are being upgraded within the East-West Highway project, in consecutive order from North (Grigoleti) to South (Sarpi).

Segment Lot Length Funding Contractor Start
Construction
Opened Remarks
Grigoleti to Kobuleti Bypass14.4 kmEIB (€101m)[20] Polat Yol (TK)Feb 20192x2 lane motorway from S12 to Kobuleti Bypass, partially opened in Dec. 2022.
Kobuleti BypassLot-1a Shekvetili — Kakucha (Sh2)12.4 kmADB Tranche 1 $119m
+ $30m (State budget)[21]
ADB Tranche 3 $140m
+ $25m (State budget)[22]
Sinohydro (CN)Mar 2011[23] Oct 2013[24] Kobuleti Bypass built as two-lane expressway
Lot-2 Kakucha (Sh2) - Chakvi18 kmSinohydro (CN)Sep 2013[25] Jun 2018[26] Section contains 2 tunnels and 15 bridges, among the longest of Georgia of 1180 m.
Lot-1b Road at Chakvi tunnel1.3 kmSinohydro (CN)2017June 2018Upgrade 1.3 km of existing road to tunnel to four lanes
Chakvi-Makhinjauri tunnel1 km2001[27] Sep 2005Dual tube four lane tunnel (650 m)
Batumi Bypass
Mtsvane Kontskhi — Khelvachauri16 kmADB ($114m)[28]
State budget $87m
Polat Yol (TK)Apr 2018 [29] Batumi Bypass is built as a two-lane expressway with 19 bridges and 5 tunnels
Batumi - Sarpi12 kmADB ($200m)Proposed. In preparation.
1.000 km = 0.621 mi

Other upgrades

A new bridge in the S2 across the Rioni River near Poti was announced, and construction tenders were published in 2021.[30] The old bridge, a hydropower dam from 1959, is allegedly in bad shape even though the hydropower plant itself has been rehabilitated in 2018.[31] The new bridge will be 500 meters long and will have a single carriageway plus hard shoulders.[32] In November 2021 the Roads Department of the Ministry of Regional Development and Infrastructure announced construction will commence and that the Asian Development Bank finances the project expenses of $20 million.[33]

No other upgrades of the S2 highway have been scheduled. The Senaki-Poti-Grigoleti section will remain an at-grade two lane highway for the foreseeable future (as of 2021).

Route

About 5km (03miles) West of Senaki the S2 highway branches off the S1 highway and heads west to the Black Sea port of Poti, after which the route turns south along the Black Sea coast to the resort and port city of Batumi. The highway reaches its southern terminus in Sarpi at the Georgia–Turkey border. The entire highway is built as a two lane road.

Senaki — Poti

Between Senaki and Poti the road passes through a few villages and runs along the Senaki-Poti railway line through the Rioni river delta. Upon entering Poti it crosses the Rioni river via the Hydropower Dam. At the north side of the city the highway turns south at which corner the European E70 route has its eastern terminus. The highway circumvents the city centre, and after crossing the Rioni canal the European E60 route separates from the highway and turns to the port of Poti. The Poti seaport is a cross point of the Trans-Caucasian Corridor/TRACECA, a multinational project which connects the Romanian port of Constanţa and Bulgarian port Varna with the landlocked countries of the Caspian region and Central Asia. The E60 continues on the other side of the Black Sea, in Constanţa.

Poti — Kobuleti

The S2 highway leaves Poti city in southern direction via the narrow strip of land that separates Lake Paliastomi from the Black Sea. At Grigoleti the road junctions with the S12 highway which is the main route to Samtredia and Tbilisi. Passing the Supsa river, the two lane highway meets the hills of Guria but remains in the lowlands. After the upgrade of the S12 to 2x2 lane motorway the connection with the S2 will be moved to the south side of the Supsa river mouth. The S12 will flow seamlessly into the S2 in southern direction, and the S2 will become a 2x2 motorway until the Kobuleti Bypass at Shekvetili. The Kobuleti Bypass extends South for 30km (20miles) until the northern area of Batumi near its famous Botanical Garden. The bypass has been constructed in the period 2014-2018 as two-lane expressway with a speed limit of .

Kobuleti — Batumi — Sarpi

After passing Kobuleti resort the bypass enters the Adjara mountains and follows a curvy route with many bridges and a few tunnels. At Chakvi the highway passes through the dual tube 4-lane Chakvi-Makhinjauri tunnel which opened in 2005 and relieved traffic from a very curvy passage across the hills.[34] At the south side of the Chakvi-Makhinjauri tunnel the Batumi Bypass will begin upon its expected completion as two-lane expressway by 2024. In the meantime the highway reaches the Black Sea coast and enters Batumi, Georgia's second largest city. After passing the port the road turns into the city centre. At the south side of the centre the road turns towards the airport which it circumvents to reach the Black Sea coast again south of the Chorokhi river. During the last kilometers to the Turkish border the mountains leave little room for the road and communities. The border checkpoints have little room as well, and the ever increasing truck traffic leads to long queues along the coast.

Notes and References

  1. Web site: 2014 List of highways of international and domestic importance. The Legislative Herald of Georgia. Georgian. 18 June 2014. 22 August 2021.
  2. Web site: Resolution of the USSR Council of Ministers of 12/22/1960 N 1303 "On approval of the List of highways of national importance". USSR Law. Russian. 22 December 1960. https://web.archive.org/web/20190404020652/http://lawru.info/dok/1960/12/22/n1192368.htm. 2 September 2021. 2019-04-04.
  3. Web site: Decision of the Council of Ministries of the USSR of 08.27.1982 N 800 on approval of the list of roads of the USSR of national significance. USSR Law. Russian. 27 August 1982. 2 September 2021.
  4. Web site: On Approval of Indicators and List for Determination of International, Domestic and Local Roads of Georgia (1996). The Legislative Herald of Georgia. Georgian. 16 December 1996. 2 September 2021.
  5. Web site: 2008 List for Determination of International, Domestic and Local Roads of Georgia. The Legislative Herald of Georgia. Georgian. 3 November 2008. 19 October 2021.
  6. Web site: Road Sector of Georgia Overview — Presentation at 10th Eastern partnership transport panel. Roads Department of Georgia. English. 11 May 2016. 13 August 2021.
  7. Web site: Team Europe: EIB provides €106.7 million to Georgia for major upgrades of its East-West highway. European External Action Service. English. 1 July 2021. 8 August 2021.
  8. Web site: Construction of the east-west highway will be completed before 2020. GRASS FactCheck. English. 23 May 2018. 6 August 2021.
  9. Web site: Zestaponi-Kutaisi road construction company changed twice, the road is not finished yet. GRASS FactCheck. Georgian. 21 November 2016. 11 August 2021.
  10. Web site: Road projects are stalled. Construction completion deadlines have been violated and delayed for months or years. GRASS FactCheck. English. 8 January 2019. 13 August 2021.
  11. Web site: Kobuleti Bypass Road, Kobuleti-Batumi Section and Batumi Bypass Road Project. Roads Department Georgia. Georgian. 23 December 2010. 21 October 2021.
  12. Web site: Contract was signed on construction of Grigoleti-Kobuleti bypass road. Roads Department of Georgia. English. 3 December 2018. 11 July 2021.
  13. Web site: Pardon our dust – work in progress to bring Georgian roads up to EU snuff, reduce accidents. Investor.ge. English. 22 September 2020. 11 July 2021.
  14. Web site: https://www.mrdi.gov.ge/ka/press-center/სიახლეები%20&%20ღონისძიებები/აღმოსავლეთ-დასავლეთის-მაგისტრა.html. ka:აღმოსავლეთ-დასავლეთის მაგისტრალური გზის 15 კმ-იან ახალ მონაკვეთებზე მოძრაობა გაიხსნა. Traffic was opened on new 15 km sections of the East-West highway. Roads Department of Georgia. 2022-12-10. 2022-12-11. ka.
  15. Web site: Kobuleti bypass road is opened. Roads Department of Georgia. English. 25 June 2018. 11 July 2021.
  16. Web site: Construction of Batumi Bypass Road. Roads Department of Georgia. English. 11 July 2021.
  17. Web site: https://www.mrdi.gov.ge/ka/press-center/%E1%83%A1%E1%83%98%E1%83%90%E1%83%AE%E1%83%9A%E1%83%94%E1%83%94%E1%83%91%E1%83%98%20&%20%E1%83%A6%E1%83%9D%E1%83%9C%E1%83%98%E1%83%A1%E1%83%AB%E1%83%98%E1%83%94%E1%83%91%E1%83%94%E1%83%91%E1%83%98/%E1%83%98%E1%83%A0%E1%83%90%E1%83%99%E1%83%9A%E1%83%98-%E1%83%A5%E1%83%90%E1%83%A0%E1%83%A1%E1%83%94%E1%83%9A%E1%83%90%E1%83%AB%E1%83%94-%E1%83%91%E1%83%90%E1%83%97%E1%83%A3%E1%83%9B%E1%83%98%E1%83%A1-%E1%83%A8%E1%83%94%E1%83%9B.html. ka:ირაკლი ქარსელაძე - ბათუმის შემოვლითი გზის მშენებლობა დასრულების ფაზაში გადავიდა. Irakli Karseladze — Construction of Batumi bypass road has entered the completion phase. Roads Department of Georgia. Georgian. 8 May 2021. 11 July 2021.
  18. Web site: Working on Feasibility Study document for construction of Batumi-Sarpi road is completed. Roads Department of Georgia. English. 19 October 2018. 11 July 2021.
  19. Web site: Georgia: Batumi-Sarpi Bypass Project. Asian Development Bank. English. 21 October 2021.
  20. Web site: E-70 Grigoleti — Kobuleti Bypass (FL 20160404). European Investment Bank. English. 10 August 2021.
  21. Web site: Georgia: Road Corridor Investment Program — Tranche 1. Asian Development Bank. English. 21 October 2021.
  22. Web site: Georgia: Road Corridor Investment Program — Tranche 3 (Additional Financing). Asian Development Bank. English. 21 October 2021.
  23. Web site: Minister of Regional Development and Infrastructure of Georgia Ramaz Nikolaishvili attended the start of construction of the Adjara bypass road. Roads Department Georgia. Georgian. 15 March 2011. 21 October 2021.
  24. Web site: Kobuleti Bypass road has been opened. Interpress News IPN. Georgian. 24 October 2013. 21 October 2021.
  25. Web site: Davit Shavliashvili continues monitoring the ongoing road works. Roads Department Georgia. Georgian. 9 September 2013. 21 October 2021.
  26. Web site: Kobuleti bypass road is opened. Roads Department Georgia. English. 25 June 2018. 21 October 2021.
  27. Web site: About construction of Chakvi-Makhinjauri section of the Senaki-Poti-Sarpi highway (with tunnels). The Legislative Herald of Georgia. Georgian. 3 March 2005. 22 October 2021.
  28. Web site: Georgia: Batumi Bypass Road Project. Asian Development Bank. English. 21 October 2021.
  29. Web site: When will the Kobuleti bypass road be opened and when will the construction of Batumi road start. Netgazeti Georgia. Georgian. 2 March 2018. 21 October 2021.
  30. Web site: Bidding has been announced for the construction of a new bridge in Poti. Roads Department of Georgia. en. 2021-05-25. 2021-07-11.
  31. Web site: Rehabilitation of the water regulating hydroelectric power plant on the Rio River in Poti has been completed. Droa. ka. 2018-11-19. 2021-10-25.
  32. Web site: Georgia: Batumi Bypass Road Project. Asian Development Bank. en. 2019-09-01. 2021-07-11.
  33. Web site: Construction of a new bridge and access road on the Rioni River in Poti is starting. Roads Department of Georgia. en. 2021-11-30. 2022-04-03.
  34. Web site: Mikheil Saakashvili Attends Opening Ceremony of Chakvi-Makhinjauri New Road Tunnel. Saakashvili Archive. Georgian. 30 September 2005. 19 October 2021.